Loading...
HomeMy WebLinkAboutPM 2015-08 - Conditions of Approval - 2/9/2016 City of _ Development&Resource Managerrlent Department 2600 Fresno Street®Third Floor Jennifer K.Clark Fresno,California 93721-3604 Director (559)621-8277 FAX(559)498-1026 January 19,2016 Please repIV to: Israel Trejo (559)621-8044 Jones Snyder&Associates PO Box 2292 Oakhurst,CA 93644 SUBJECT: NOTICE OF APPROVAL OF VESTING TENTATIVE PARCEL MAP NO. 2015-08 DATED OCTOBER 26,2015,PROPOSING A 2-LOT PARCEL MAP FOR PROPERTY LOCATED AT 11641 & 11657 NORTH DEVONSHIRE AVENUE The City of Fresno Development Services Division has completed its review of the subject parcel map dated October 26,2015. Pursuant to Section 12-1205 of the Fresno Municipal Code,this letter is written to advise you that the Conditions of Approval dated January 19, 2016,are as noted on the attached document. Appeal: The divider or any aggrieved person may file an appeal regarding to conditions of approval within fifteen(15)days from the date of approval. To protest the Director's decision regarding the conditions of approval,you must appeal by filing a written appeal with the Director of the Development and Resource Management Department. Appeals must include the appellant's interest in/or relationship to the subject property,the decision or action appealed,and specific reasons why the appellant believes the decision or action appealed should not be upheld. Appeals must be submitted to the Director of the Development and Resource Management Department prior to 5 p.m.on February 3,2016. EXPIRATION: The approval or conditional approval of this tentative Parcel Map expires two years from the date of approval. The expiration shall terminate all proceedings and a final Parcel Map may not be filed without first processing a new Tentative Parcel Map. Modification of a Tentative Parcel Map after approval or conditional approval does not extend the two year time limit. EXTENSION: The divider may request up to a two year extension of the tentative map expiration date by filing a written application together with the fee set forth in the Master Fee Schedule at the time of the request with the Director of the Development and Resource Management Department prior to the expiration date of the map. The applicant Vesting Tentative Parcel Map No. 2015-08 January 19, 2016 Page 2 must state the reasons for requesting the extension. New conditions may be imposed if an extension is granted. Cumulative discretionary extensions may not exceed an aggregate of six years. If you wish additional information, please contact the City of Fresno, Development and Resource Management Department, Development Services Division, 2600 Fresno Street, Fresno, California 93721-3604; phone, (559) 621-8044. Your inquiry should be directed to either Jon Bartel (engineering or improvements issues) or Israel Trejo (planning or zoning issues). Should you have any questions regarding the conditions you must notify either Jon Bartel at (559) 621-8684 or Israel Trejo at (559) 621-8044 by February 3, 2016, to request a review of the conditions. No further notice will be sent. Sincerely, DEVELOPMENT SERVICES DIVISION Israel Trejo, Planner Development & Resource Management Department Enclosures: Vesting Tentative Parcel Map No. 2015-08 dated October 26, 2015 Conditions of Approval dated January 19, 2016 CITY OF FRESNO DEVELOPMENT&RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL JANUARY 19,20116 'TENTATIVE PARCEL MAP No., 2015 VESTING TENTATIVE PARCEL MAP NO.' 2"'-08 VESTING NORTH DEVONSHIRE AVENUE WITHIN THE COPPER RIVER RANCH DEVELC➢NIVIENT DEVONSHIRE S V U r IT 1,TH 'P r NORrH D N HIR-A EN EW H E CO ER Riv_I-RANCH Di NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act(SMA), Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications,reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. Upon conditional approval of Vesting Tentative Parcel Map No. 2015-08, the subdivider may prepare a Parcel Map(Final)in accordance with the approved vesting tentative parcel map.Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 12-1207 of the FMC,the application will be scheduled to be heard before the City of Fresno Planning Commission, The appellant may withdraw their appeal pursuant to Section 12-1207.2 of the FMC. Concurrent with the filing of a Parcel Map and when the provisions of Section§66436 of the SMA apply,the subdivider is responsible to send,by certified mail,a sketch of the proposed Parcel Map, together with a copy of Section§66436(a)(3)(A)of the SMA,to any public entity or public utility which has previously acquired a right-of-way easement. LEGAL STATUS OF SITE TO BE SUBDIVIDED The parcel map site is situated in the City of Fresno,County of Fresno,State of California,and was legally created as: Merged by Notice of Voluntary Parcel Merger No. VPM 2014-06 as per Document No, 2014-0144847,F.C.O,R. Conditions of Approval Vesting Tentative Parcel Map No.2015-08 January 19,2016 Page 2 PLAN CONSISTENCY The subject site is located within the boundaries of the Fresno General Plan and Woodward Community Plan. These plans designate the subject property with the low density planned land use designation. ZONING 1. Comply with the provisions of the State of California Government Code Sections§66410- §66499.58 of the SMA and the City FMC Chapter 12, Article 10 (Subdivision of Real Property), GENERAL CONDITIONS 2. Any existing and/or proposed structure(s)on the site may be affected due to the location of the proposed parcel lines. The placement of a parcel line in close proximity to any existing and/or proposed structure(s)requires that the structure(s)be found in compliance with the fire resistive standards of the Uniformed Building Code,Chapter 5. a) Compliance with the prevailing Uniform Building Code as it relates to exterior wall protection, allowable area, etc. (as applicable to new parcel line locations) must be demonstrated prior to recordation of the Parcel Map. Contact the Development and Resource Management Department,Building and Safety Services Division at(559)621- 8200. NOTE: In the event the structures do not comply they must be modified so as to meet the requirement. 3. All existing offsite overhead utilities within the limits of the vesting tentative parcel map, including but not limited to,electrical systems,communication systems and street lighting systems shall be placed underground in accordance with the provisions of Section 12-1011 and Resolution No.78-522/88-229,and the policies of the Public Works Department. 4. All work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings(City Council Resolution No.70-36 and Resolution Nos.84-361)and any amendments thereto,hereinafter referred to as the Public Works Standards. 5. All off-site and public improvements shall be constructed in accordance with the Public Works Department Standards,Specifications and Policies. Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation,review and construction inspection shall be at the subdivider's expense. 6. The subdivider shall dedicate and construct public easements to facilitate the construction of curbs, gutters, sidewalks with street tree wells and irrigation systems(when applicable), permanent pavement, street/safety lighting, bus bays, right turn lanes, bike lanes, bike Conditions of Approval Vesting Tentative Parcel Map No.2015-08 January 19,2016 Page 3 paths,multi-purpose trail,wheelchair ramps and public utilities in accordance with City plans, ordinances,resolutions and policies,and the Standard Specifications of the Public Works Department within the limits of the parcel map. NOTE: Telephone,cable,and other public utilities which propose above-ground facilities (such as cabinets) determined by the Development and Resource Management Department Director to be oversized shall be located in an additional easement area outside of the required landscape strip. a) All such public easements shall be identified and dedicated with the processing and recordation of the Final Parcel Map. 7. A minimum four foot wide clear path of travel is required along all street frontages of the property as required by Title 24 of the California Administration Code, current ADA regulations;and,as determined by the City Engineer. NOTE: An on-site pedestrian easement and construction of a path may be required if Title 24 and ADA provisions cannot be met within the public rights-of- way. a) Any existing sidewalks in excess of 2%maximum slope must be brought into compliance prior to acceptance by Public Works. 8. Repair all existing damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division,(559)621-5600. 9. Existing driveway approaches which do not provide access to an approved vehicle parking area shall be removed. 10. When street/safety lighting installations are required,street lighting plans shall be submitted for review and approval by the Traffic Engineer prior to the issuance of permits for the work. Services to street lighting installations shall be separated from the electrical service(s) serving the development. The type,location and service for street lighting installations shall be as determined by the Traffic Engineer. Street lighting installations shall be dedicated to the City upon completion and acceptance of the installations. 11. If not existing, street work on major streets shall be designed to include Intelligent Transportation Systems (ITS) conduit in accordance with the Public Works ITS specifications. 12. All required signing and striping shall be installed and paid for by the developer/owner. The signing and striping plans shall comply with the current Caltrans standards and shall be submitted to the Public Works Department for review and approval as a part of the street improvement plans for this tentative map. Conditions of Approval Vesting Tentative Parcel Map No.2015-08 January 19,2016 Page 4 13. Any existing utilities,including but not limited to,street lights,traffic signals,fire hydrants, poles(power,telephone,cable,etc.),which must be relocated or removed in conjunction with the construction of off-site improvement requirements,shall be the responsibility and at the expense of the subdivider. 14. The subdivider may either construct or install required public improvements,when required; or, enter into a bonded secured agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the recordation of a Parcel Map(final). 15. Whenever covenants or agreements are required,they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and agreements must be approved by the City Attorney's Office and shall be recorded with the final parcel map. SPECIFIC CONDITIONS STREET TREES 16. Comply with the letterfrom the Public Works Department,Park Supervisordated December 8,2015,relative to the street tree requirement. SANITARY SEWER SERVICE 17. Comply with the requirements of the Department of Public Utilities, Planning and Engineering memorandum dated November 23,2015. WATER SERVICE 18. Comply with all of the requirements of the Department of Public Utilities,Water Division memorandum dated November 25,2015. DEVELOPMENT FEES AND CHARGES This project is subject to the following development fees and charges: SEWER CONNECTION CHARGES FEE RATE a. Lateral Sewer Charge[1] $0.10/sq.ft.(to 100'depth) b. Oversize Charge[1] $0.05/sq.ft.(to 100'depth) c. Trunk Sewer Charge[2] $496/living unit Service Area:Herndon d. Wastewater Facilities Charge[3] $2,119.00/living unit Conditions of Approval Vesting Tentative Parcel Map No.2015-08 January 19,2016 Page 5 e. Copper River Ranch Sewer Backbone System[4] $877/living unit f. Copper Avenue Sewer Lift Station Charge[4] $650/living unit g. House Branch Sewer Charge[2] N/A WATER CONNECTION CHARGES FEE RATE h. Service Connection Charge Fee based on service(s)and meter(s)sizes specified by owner; fee for service(s)and Meter(s) established by the Master Fee Schedule. i. Frontage Charge[1] $6.50/lineal foot j. Transmission Grid Main Charge[1] $643/gross acre (parcels 5 gross acres or more) k. Transmission Grid Main Bond Debt Service Charge[1] $243/gross acre (parcels 5 gross acres or more) I. UGM Water Supply Fee[2] N/A Service Area:101-S m. Well Head Treatment Fee[2] N/A Service Area:101 n. Recharge Fee[2] N/A Service Area: 101 o. 1994 Bond Debt Service[1] N/A Service Area:101 CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE p. Fire Facilities Impact Fee—Citywide[4] $539.00/living unit q. Park Facility Impact Fee—Citywide[4] $2,278/living unit r. Quimby Parkland Dedication Fee[2] $1,120/living unit s. Citywide Regional Street Impact Fee[3] $8,361.00/adj.acre t. New Growth Area Major Street Fee[3] $18,790/adj.acre u. Police Facilities Impact Fee—Citywide[4] $624.00/living unit Conditions of Approval Vesting Tentative Parcel Map No.2015-08 January 19,2016 Page 6 v. Traffic Signal Charge[1] $450.94/living unit w. UGM Right of Way Acquisition Charge[2] N/A COPPER RIVER RANCH IMPACT FEES FEE RATE x. CRR Major Roadway Infrastructure Facility Fee[4] $7,972/adj.acre y. CRR Major Interior Collector Roadway Facility Fee[4] $26,676/adj.acre z. CRR Clovis Mitigation Fee[2] $38.99/ADT[5] as.CRR Friant Widening Mitigation Fee[2] $9.76/ADT[5] (Votes: On July 22,2008,the Fresno County Board of Supervisors passed Ordinance No.2008—023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20,2008. Contact the County of Fresno,Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No.2009—01 requiring the payment of Regional Transportation Mitigation Fee.The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. [1]Deferrable through Fee Deferral Covenant. [2]Due at Final Map. [3]Due at Building Permit. [4]Due at Certificate of Occupancy. [5]Determined by Public Works. DEPARTMENT OfliU-BLIC W-01�-KS TO: Israel Trejo,Planner III Development and Resource Management Department FROM: Hilary Kimber,Parks Supervisor ll(559.6 1.1345) Public Works, Median Island Maintenance DATE: December 8,2015 SUBJECT: Parcel Map 2015-08; 116411 &11657 North Devonshire Avenue (APN:579-180-02&09) The Department of Public Works offers the following comments regarding the proposed project located within the Copper River Ranch Tract 5205/5272: GL=NERAI-REQUIREMENTS 1. The Developer is required to provide street trees on all public street frontages per Fresno Municipal Code. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage. Irrigation is required for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB1881. 2. There are approximately 190 lineal feet of street frontage along N. Devonshire Ave.resulting in the requirement of three(3)street trees. The required street tree species for N.Devonshire Ave. is: There are no tree species determined for N. Devonshire Ave. Please choose an appropriate street tree from the list of Approved Street Trees 3. Trees shall be planted in accordance with the City of Fresno "Standard and Specifications", 4. Public Works requires a landscape and irrigation plan to the scale of 1"-20'to be submitted prior to the installation of street trees or onsite trees planted in-lieu-of street trees. DEPARTMENT OF PUBLIC UTILITIESPul ADMINISTRATION DIVISION MEMORANDUM Dates November 23,2015 To. ISRAE-.TREJO,Planner III Planning and development Department Fr mr KEVIN GRAY,Supervising Engineering Technician Department of Public Utilities,Planning and Engineering Subject SEWER REQUIREMENTS FOR PARCEL MAP PM'_2015-08 General VESTING TENTATIVE PARCEL MAP NO.2015-08 FOR PROPERTY LOCATED AT 11641 &11657 NORTH DEVONSHIRE AVENUE WIHIN THE COPPER RIVER RANCH PROJECT APN's 579-180-02&09 Sewer Requirements The nearest sanitary sewer main to serve the proposed project area is an 8-inch sewer main located in N.Devonshire Avenue. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. On-site sanitary sewer facilities shall be private. 2. Installation of sewer house branches shall be required. 3. Separate sewer house branches are required for each lot. 4. Abandon any existing on-site private septic systems. Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge. 2. Sewer Oversize Charge. 3. Wastewater Facilities Charge(Residential Only). 4. Copper Avenue sewer lift-station fee. '��� ' A Nationally Accredited Public Utility Agency 5. Herndon Enhancement Fee. 6. Trunk Sewer Charge:Herndon. 7. Trunk Sewer Charge C.R.R--Sewer Backbone system facility flee. City of onoon DEPARTMENT OF PUBLIC UTILITIES—WATER DIVISION DPU MEMORANDUM 4 DATE: November 25,2015 TOISRAEL TREJO,Planner III Development and Resource Management Department—Current Planning THROUGH: MICHAEL CARBAJAL,Division Manager Department of Public Utilities—Water Division FROM: ROBERT DIAZ,Senior Engineering Technician�'z Department of Public Utilities—Water Division SUBJECT: WATER REQUIREMENTS FOR VESTING PARCEL MAP 201"0. General Vesting Tentative Parcel Map No.2015-08 for property located at 11641 &11657 North Devonshire Avenue within the copper River Ranch Project APN's 579-180-02&09. Water Service Water facilities are available to provide service to the site subject to the following requirements: 1) On-site water facilities shall be private. A Nationally Accredited Public Utility Agency .................. HIP, pply"\ Owl WIF b"v 1 dump M 1 0 > qR