Loading...
HomeMy WebLinkAboutPM 2013-03 - Conditions of Approval - 2/19/2015 CITY OF FRESNO DEVELOPMENT & RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL OCTOBER 30, 2014 TENTATIVE PARCEL MAP NO. 2013-003 LOCATED ON THE WEST SIDE OF NORTH WINERY BETWEEN EAST MCKENZIE AND EAST WASHINGTON AVENUES NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act (SMA), Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. Upon conditional approval of Vesting Tentative Parcel Map No. 2013-003 the subdivider may prepare a Parcel Map (Final) in accordance with the approved tentative parcel map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 12-1207 of the FMC, the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 12-1207.2 of the FMC. Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map, together with a copy of Section §66436(a)(3)(A)of the SMA, to any public entity or public utility which has previously acquired a right-of-way easement. LEGAL STATUS OF SITE TO BE SUBDIVIDED The parcel map site is situated in the City of Fresno, County of Fresno, State of California, and was legally created as: The East one-fifth of the South half of Lot 15 of Easterby Rancho, City of Fresno, County of Fresno, State of California, as shown on map filed book 2, Page 6 of Maps, in the office of the County Recorder of said County. EXCEPTING THEREFROM all oil, gas, and minerals in and under said land. Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 2 APN: 462-123-16s PLAN CONSISTENCY The subject site is located within the boundaries and jurisdiction of the 2025 Fresno General Plan and the Roosevelt Community Plan, Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix)of the 2025 Fresno General Plan and applied within all community plans and pursuant to Section 12-403-B-1 (Zone District Consistency Table) of the Fresno Municipal Code (FMC) the proposed R-1 (Single Family Residential) zone district and the proposed density of approximately 6.45 dwelling units per acre is consistent with the Medium Density Residential planned land use designation for the subject property. ZONING 1 . Comply with the provisions of the State of California Government Code Sections §66410 - §66499.58 of the SMA and the City FMC Chapter 12, Article 10 (Subdivision of Real Property). Approval of the tentative parcel map shall be subject to the parcel being rezoned R-1 which will be effective 30 days from October 30, 2014. GENERAL CONDITIONS 2. All existing offsite overhead utilities within the limits of the tentative parcel map, including but not limited to, electrical systems, communication systems and street lighting systems shall be placed underground in accordance with the provisions of Section 12-1011 and Resolution No. 78-522/88-229, and the policies of the Public Works Department. 3. All off-site and public improvements shall be constructed in accordance with the Public Works Department Standards, Specifications and Policies. Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. 4. The subdivider shall dedicate public easements to facilitate the construction of public improvements (when applicable) within the limits of the parcel map. a) All such public easements shall be identified and dedicated with the processing and recordation of a Parcel Map. Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 3 5. A minimum four and half foot wide clear path of travel is required along all street frontages of the property as required by Title 24 of the California Administration Code, current ADA regulations; and, as determined by the City Engineer. • NOTE: An on-site pedestrian easement and construction of a path may be required if Title 24 and ADA provisions cannot be met within the public rights-of-way. a) Any existing sidewalks in excess of 2% maximum slope must be brought into compliance prior to acceptance by Public Works. b) Sidewalks (including wheelchair ramp landings) and driveway approaches, for undeveloped parcels of this parcel map, shall be required and constructed at the time of site development. 6. Repair all existing damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5600. 7. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants, poles (power, telephone, cable, etc.),which must be relocated or removed in conjunction with the construction of off-site improvement requirements, shall be the responsibility and at the expense of the subdivider. 8. The subdivider may either construct or install required public improvements, when required; or, enter into a bonded secured agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the recordation of a Parcel Map (final). SPECIFIC CONDITIONS STREETS AND RIGHTS-OF-WAY 9. Comply with all of the requirements and conditions included within the attached Public Works Department, Traffic and Engineering Services Division memorandum dated March 28, 2014. 10. Comply with all of the requirements and conditions included within the attached memorandum from the Public Works Department, Engineering Division (Parks Supervisor) dated April 7, 2014 Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 4 SANITARY SEWER SERVICE The nearest sanitary sewer main to serve the proposed project is an 8-inch main located at the intersection of East McKenzie and North Winery Avenues. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 11. Comply with all of the requirements included within the attached Department of Public Utilities, Planning and Engineering (Sewer) memorandum dated March 10, 2014. WATER SERVICE The nearest water main to serve the proposed project is a 6-inch main located in North WineryAvenue. The following water improvements shall be required prior to providing City water service to the project: 12. Comply with all of the requirements included within the attached Department of Public Utilities, Water Division memorandum dated March 19, 2014. FRESNO METROPOLITAN FLOOD CONTROL DISTRICT (FMFCD) 13. The subdivider shall be required to comply with all of the specific requirements imposed by the FMFCD for the subdivision or any amendments or modifications to those requirements, which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the FMC. These requirements are identified in the attached District's letter to the Development and Resource Management Department dated March 20, 2014. FRESNO IRRIGATION DISTRICT 14. Attached for the property owner/subdivider's records and/or consideration is the memorandum from the Fresno Irrigation District dated March 21, 2014. FRESNO UNIFIED SCHOOL DISTRICT 15. Attached for the property owner/subdivider's records and/or consideration is the memorandum from the Fresno Unified School District dated March 10, 2014. Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 5 DEVELOPMENT FEES AND CHARGES Pursuant to Government Code §66020(d)(1)each local agency shall provide to the project applicant a notice in writing at the time of the approval of a project or at the time of the imposition of the fees, dedications, reservations, or other exactions a statement of the amount of the fees or other exactions, and notification that the 90-day approval period in which the applicant may protest has begun (please see Notice to Project Applicant contained herein above for further information). This project is subject to the following development fees and charges: TENTATIVE PARCEL MAP NO. 2013-03 GOVERNMENT CODE§66020(d)(1) A protest filed pursuant to subdivision (a) shall be filed at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations, or other exactions to be imposed on a development project. Each local agency shall provide to the project applicant a notice in writing at the time of the approval of the project or at the time of the imposition of the fees, dedications, reservations, or other exactions, a statement of the amount of the fees or a description of the dedications, reservations, or other exactions, and notification that the 90-day approval period in which the applicant may protest has begun. Improvements and payments shall not be required on or in front of any undeveloped portion of a net acreage of ten acres or more which exists after the division of land. All improvements and payments to be completed with development. SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth) c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charge [2] Service Area: N/A e. Wastewater Facilities Charge [3] $2,119.00/living unit f. Copper Avenue Sewer Lift Station Charge [1] N/A Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 6 g. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE h. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. i. Frontage Charge [1] $6.50/lineal foot j. Transmission Grid Main Charge [1] $804/net acre (parcels under 5 gross acres) k. Transmission Grid Main Bond Debt [1] Service Charge $304/net acre (parcels under 5 gross acres) I. UGM Water Supply Fee [2] N/A Service Area: m. Well Head Treatment Fee [2] N/A Service Area: n. Recharge Fee [2] N/A Service Area: o. 1994 Bond Debt Service [1] N/A Service Area: CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE p. Fire Facilities Impact Fee — Citywide [4] $539.00/living unit q. Park Facility Impact Fee — Citywide [4] $3398/living unit r. Quimby Parkland Dedication Fee [2] N/A s. Citywide Regional Street Fee [3] $8,361.00/adj. acre Conditions of Approval Tentative Parcel Map No. 2013-003 October 30, 20014 Page 7 t. New Growth Area Major Street Fee [3] N/A u. Police Facilities Impact Fee — Citywide [4] $624.00/living unit v. Traffic Signal Charge [1] $450.94/living unit w. Street Acquisition/Construction Charge [2] N/A Notes: On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008— 023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No. 2009 — 01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. DEPARTMENT OF PUBLIC WORKS TO: Bruce Barnes, Planning Manager Planning Department FROM: Hilary Kimber, Parks Supervisor II (559.621.1345) Public Works, Street Maintenance Division DATE: April 7, 2014 SUBJECT: Tentative Parcel Map 2013-03; APN: 462-123-16s) The Department of Public Works offers the following comments regarding TPM 2013-03, 4896 East Washington Avenue located on the west side of North Winery Avenue between East Washington and East McKenzie Avenues on plans by Harbison International inc. dated February 12, 2014: GENERAL REQUIREMENTS 1. Public Works requires one street tree per 60 lineal feet of street frontage or one tree per house, whichever is greater. 2. The Tentative Parcel Map indicates a 10' sidewalk pattern, 5.5' of parkstrip and 4.5' of sidewalk. Proposed Parcel "A" requires one (1) street tree, Proposed Parcel "B" requires one (1) street tree and Proposed Parcel "C" requires one (1) street tree on North Winery Avenue and two (2) street trees on East McKenzie Avenue. 3. There are no designated street trees for either North Winery or East McKenzie Avenues at this location. Please choose an appropriate tree from the list of Approved Street Trees (see attached). Street tree installation will not be required until all hardscape amenities have been installed. 4. Public Works requires a landscape and irrigation plan at the scale of 1"=20' to be submitted prior to installing the landscaping. All items under Sections #25 and #26 of the Public Works Standard Specifications and Drawings shall be adhered to. City of CMCIM\I-,\\li, r"=_W;W%jjp DATE: March 28, 2014 TO: Bruce Barnes Development and Resource Management Department FROM: Louise Gilio, Traffic Planning Supervisor Department of Public Works, Traffic and Engineering Services Division SUBJECT: Tentative Parcel Map 2013-03, Public Works Conditions of Approval Location: 4896 East Washington Avenue Owner: Niko Real Estate Fund LLC Provide the following information on the tentative map and/or complete the following, prior Planning Commission. 1. Identify how the right of way was established by citing the dedication documents. 2. Identify the north line of the south Y2 of Lot 15. 3. Identify the south line of Lot 15 of Easterby Rancho. 4. Identify the north line of former S.P.R.R. right of way. 5. Correctly identify all property lines that are used on the exhibit. (Belmont Gardens No. 3 Plat Vol 12, PG 36, F.C.R.) PUBLIC IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed rior to perfection of this parcel map. Steve Delsid (559)621-8725 General Conditions • Submittal of engineered street light construction plans to the Public Works Department for approval must be made prior to the final map. • All required signing and striping shall be installed and paid for by the developer/owner. The signing and striping plans shall comply with the current Caltrans standards and be submitted as a part of the street improvement plans. • Additional offsite improvements will be required at the time of future site plan review. Page 1 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVALIPARCEL MAPS\2013\PM 2013-03 WASHINGTON 4896 E.doc • Curb ramps with "Detectable Warning Devices" are required at all corners within the limits of this parcel map. • Repair all damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5600. Pedestrian paths of travel must also meet current ADA regulations.All existing sidewalks in excess of 2% maximum cross slope must be brought into compliance prior to acceptance by Public Works. • Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. • ADA: Provide a minimum of 4' clear to accommodate ADA access along the entire street frontage of this map. Pedestrian easements may be required to accomplish this. Contact the Public Works Department, Traffic and Engineering Services Division, • Street widening and transitions shall also include utility relocations and necessary dedications. Street Dedications and Vacations Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs,fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way. Also, identify the required 4' minimum path of travel along the public sidewalk directly in front of property, as required by the California Administration Code (Title 24). A pedestrian easement may be required if Title 24 requirements cannot be met. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment agreement is approved by the City of Fresno Public Works Department, Traffic and Engineering Services Division. Contact Alan James at (559)621-8693 or Jeff Beck at (559)621-8560. Encroachment agreements must be approvedrp for to final map. Frontage Improvement Requirements All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. Street light construction plans are required and shall be approved by the City Engineer. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Traffic and Engineering Services Division at (559) 621-8670 for detailed information. Submit the following, as applicable, in a single package to the City of Fresno Public Works Department to route for review and approval, rior to issuance of building and street work permits: Street Improvement Plans, Signing and Striping Plans, Street Lighting Plans and Signal Plans. Public Streets: Washington Avenue: Local 1. If not existing, dedicate 30' of property, from center line,for public street purposes within the limits of this subdivision to meet the current City of Fresno Local Standards, P-56. 2. Dedicate a comer cut for public street purposes at the intersection of Washington and Winery. 3. Construct concrete sidewalk, curb and gutter to Public Works Standard P-5. The curb shall be constructed to a 14' (5 -4'-75) residential pattern. (match existing) Page 2 of 3 T:1Traffic Planning\ CONDITIONS OF APPROVAL\PARCEL MAPS\2013\PM 2013-03 WASHINGTON 4896 E.doc 4. Construct a standard curb ramp per Public Works Standard P-28, based on a 20' radius. -OR- Modify or replace the existing ramp to meet current Public Works Standards, as determined by the Construction Management engineer PRIOR to occupancy. "Detectable Warning Devices" are required, if not existing. Reference Public Works Standards P-28 and P-32. Winery Avenue: Local 1. If not existing, dedicate 30' of property, from center line,for public street purposes within the limits of this subdivision to meet the current City of Fresno Local Standards, P-56. 2. Dedicate or reserve a corner cut for public street purposes at the intersection of Winery and McKenzie. 3. Where missing, construct concrete sidewalk, curb and gutter within the limits of the remainder parcel to Public Works Standard P-5. The curb shall be constructed to a 10' or 12' residential pattern (verify dimension on the map and match existing). 4. Construct a standard curb ramp per Public Works Standard P-28, based on a 20' radius. -OR- Modify or replace the existing ramp to meet current Public Works Standards, as determined by the Construction Management engineer PRIOR to occupancy. "Detectable Warning Devices" are required, if not existing. Reference Public Works Standards P-28 and P-32. 5. Construct an underground street lighting system (1-light) to Public Works Standard E-2 at the southwest corner of Winery and Washington. McKenzie Avenue: Local 1. Provide QUIT CLAIM or GRANT DEED and reserve sufficient street right of way to provide for a 10-12' pattern. (match existing) Contact Alan James at 559 621-8560. Identify curb to curb dimension and curb to property dimension so a determination can be made for the needed street right of way. 2. Remove the existing driveway approach and reconstruct with curb, gutter, and sidewalk to match existing adjacent street improvements per Fresno Municipal Code (FMC) 11-209. Verify existing sidewalk pattern 10' or 12'? Specific Mitigation Requirements: A Traffic Impact Study (TIS) is not required. 1. Full offsite improvements adjacent to the remainder on the southwest corner of Washington and Winery shall be required for public health and safety and the orderly development of the surrounding area. Reference "The Subdivision Map Act", Chapter 1, Section 66424.6. Traffic Signal Mitigation Impact(TSMI) Fee: This project shall pay all applicable TSMI Fees, at the time of Parcel Map approval based on the trip generation rate(s)as set forth in the latest edition of the ITE Generation Manual. Contact the Public Works Department, Frank Saburit at (559)621-8797. Fresno Maior Street Impact(FMSI)Fees: This entitlement is in the Infill Area; therefore pay all applicable City-wide regional street impact fees. Contact the Public Works Department, Frank Saburit at (559)621-8797. Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocog.ora. Provide proof of payment or exemption prior to granting final occupancy. Page 3 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2013\PM 2013-03 WASHINGTON 4896 E.doc City of �QtE�peaHs ryy4f. e1�iLC-%RLI Department of Public Utilities—Water Division N D Pu U W4�Cr DATE: March 19, 2014 Providing Life's Essential Services TO: BRUCE BARNE, Project Manager Development Department/Current Planning THROUGH: MICHAEL CARBAJAL, Chief Engineering Technician Department of Public Utilities, Water Division FROM: ROBERT A. DIAZ, Senior Engineering Technician Department of Public Utilities, Water Division SUBJECT: WATER REQUIREMENTS FOR PARCEL MAP PM-2013-03 AND REZONE R-13-014. General R-13-014 & PM-2013-03 were filed by Mike Hamzy of Harbison International, Inc., and pertain to 0.62 acre of property located on the west side of North Winery Avenue between East Washington Avenue and East McKenzie Avenue, 4896 East Washington Avenue, APN 462-123-16S. R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A, Single Family Residential-Agricultural, zone district to the R-1, Single Family Residential, zone district. PM-2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square foot minimum lot size. Water Requirements The nearest water main to serve the proposed project is a 6-inch main located in North Winery Avenue. Water facilities are available to provide service to the site subject to the following requirements: 1. Water service(s) and meter(s) connections shall be required to each lot. 2. On-site water facilities shall be private. s " le. A Nationally Accredited Public Utility Agency City of �l� FESMOV . Y DEPARTMENT OF PUBLIC UTILITIES �pu ADMINISTRATION DIVISION MEMORANDUM �� Q Providing Life's Essential Services Date: March 10, 2014 To: BRUCE BARNES Planning and Development Department From: DOUG HECKER, Supervising Engineering Technician[Ai 9 9 Department of Public Utilities, Planning and Engineering Subject: SEWER REQUIREMENTS FOR PARCEL MAP PM-2013-03 & R-13-014 General R-13-014 & PM-2013-03 were filed by Mike Hamzy of Harbison International, Inc., and pertain to 0.62 acre of property located on the west side of North Winery Avenue between East Washington Avenue and East McKenzie Avenue, 4896 East Washington Avenue, APN 462- 123-16S. R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A, Single Family Residential-Agricultural, zone district to the R-1, Single Family Residential, zone district. PM-2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square foot minimum lot size. Sewer Requirements The nearest sanitary sewer main to serve the proposed project area is an 8-inch sewer main located in E. McKenzie Avenue. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. Construct an 8-inch sanitary sewer main (including sewer house branches to adjacent properties) at the intersection of N. Winery and E. McKenzie Avenue from manhole 2562-25 north in N. Winery to the middle of proposed Parcel "A". 2. On-site sanitary sewer facilities shall be private. 3. Separate sewer house branches are required for each lot. 4. Abandon any existing on-site private septic systems. 5. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. 6. All public sanitary sewer facilities shall be constructed in accordance with City Standards, specifications, and policies. " A Nationally Accredited Public Utility Agency 2AN" 1 . Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project. 1. Sewer Lateral Charge 2. Oversize Sewer Charge 3. Wastewater Facilities Charge (Residential Only) �PcaNSERY4), City of ,o ya -� � (DIP u � DEPARTMENT OF PUBLIC UTILITIES �� Providing Life's Essential Services Date: March 18, 2014 To: BRUCE BARNES,Project Manager Development and Resource Management Department, Planning From: CHRIS WEIBERT, Management Analyst II 9 Public Utilities Department, Administration Subject: R-13-014 &PM-2013-03 were filed by Mike Hamzy of Harbison International, Inc., and pertain to 0.62 acre of property located on the west side of North Winery Avenue between East Washington Avenue and East McKenzie Avenue, 4896 East Washington Avenue, APN 462-123-16S. R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A, Single Family Residential-Agricultural, zone district to the R-1, Single Family Residential, zone district. PM-2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square foot minimum lot size. General Solid Waste requirements shall be addressed upon the submittal of future applications. Page l of l t I y OFFICE OF iit , 1 � ;�• ' TELEPHONE(559)233.7191 FAX(559)233.8227 _ 290.7 S.MAPLE AVENUE FRESNO,CALIFORNIA 93735.2208 YOUR MOST VALUABLE RESOURCE-WATER March 21, 2014 Mr. Bruce Barnes City of Fresno Development and Resource Management Department 2600.Fresno Street, Third Floor Fresno, CA 93721 RE: Rezone Application No. R-13-014 and Tentative Parcel Map No. 2013-03. S/E Belmont &Chestnut avenues Dear Mr. Barnes: The.Fresno Irrigation District (FID) has reviewed the Rezone Application No. R-13-014 and Tentative Parcel Map No. 2013-03 pertaining to the 0.62± acre of property located on the west side of Winery Avenue between Washington and McKenzie avenues. Rezone Application No: R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A (Single Family Residential Agricultural)zone district to the R-1 (Single Family Residential)zone district. Tentative Parcel Map No. 2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square-foot minimum lot size, APN: 462-123-16s. FID has the following comment: 1 FID does not own, operate or maintain any facilities located on the subject property as shown on the attached FID exhibit map. Thank you for submitting this for our review. We appreciate the opportunity to review and comment on the subject documents for the proposed project. If you have any questions please feel free to contact Sen Saetern at 233-7161 extension 7406 or ssaetern(o�-fresnoirrigation,com. Sincerely,. 1 William R. Stretch, P.E. Assistant General Manager-Operations Attachment G:kAgencieslFresnoCIty%Rezone113-13-014:doc BOARD OF Presldent RYAN JACOBSEN, Vice-President STEVEN BALLS DIRECTORS JEFFERY NEELY, GEORGE PORTER, GREGORY BEBERIAN, General Manager GARY R.SERRATO BOARD OF EDUCATION Valerie F.Davis,President Lindsay Cal Johnson,Clerk Michelle A.Asadoorian f Fresno Unified r = Luis A.Chavez l` Christopher De La Cerda - Carol Mills,J.D. School District Janet Ryan�� Preparing Career Ready Graduates Facilities Management&Planning SUPERINTENDENT Michael E.Hanson March 10,2014 Bruce Barnes Development and Resource Management City of Fresno 2600 Fresno Street,Third Floor Fresno,CA 93721-3604 SUBJECT: REZONE APPLICATION NO.R-13-014 TENTATIVE PARCEL MAP NO.2013-03 4896 E.WASHINGTON AVE.(APN: 462-123-16S) Dear Mr. Barnes, In response to your request for review and comment on Rezone Application No. R-13-014 and Tentative Parcel Map No. 2013-03 for a proposed parcel subdivision and ultimate construction of three residential units at 4896 East Washington Avenue, Fresno Unified School District submits the following. Any urban residential development occurring as a result of project approval will have an impact on the District's student housing capacity. The District,through local funding, is in a position to mitigate its shortage of classrooms to accommodate planned population growth for the foreseeable future. However, the District recognizes that the legislature,as a matter of law,has deemed, under Government Code Section 65996,that all school facilities impacts are mitigated as a consequence of SB 50's Level 1,2 and 3 developer fee legislative provisions. Any new development on the subject property is subject to development fees of$3.20 per square foot for residential and$0.51 per square foot for commercial development. Any new development on the property will be subject to the development fee prior to issuance of a building permit. Attendance area information: The project is presently within the attendance areas of the schools identified below. Elementary School: Bakman Middle School: Kings Canyon High School: Sunnyside Thank you for the opportunity to comment. Please contact me at 457-3074 if you have any questions or require additional information regarding our comments. Sincerely, Lisa LeBlanc,Executive Officer Facilities Management and Planning �v LL:hh -�.�-.4..._�'--:ems�.:`._..---'_�--..,mea—xY�o -- ---- .r__ .., —•zr 2309 Tulare Street Fresno, C4 93721-2287 irww./i-esnounired-oro z CITY OF FRESNO - DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT REQUEST FOR COMMENTS, CONDITIONS, ENVIRONMENTAL ASSESSMENT, AND ENTITLEMENT APPLICATION REVIEW OF REZONE APPLICATION NO. R-13-014 and TENTATIVE PARCEL MAP NO. 2013-03 R2turn Completed Form to: Bruce Barnes Email: Bruce.Barnes(a7fresno.gov Telephone: 559-621-8047 Development& Resource Management 2600 Fresno Street, Third Floor Fresno CA 93721-3604 j J PROJECT DESCRIPTION AND LOCATION: Rezone Application No. R-13-014 and Tentative Parcel Map No. 2013-03 were filed by Mike Hamzy of Harbison International, Inc., and pertains to 0.62± acre of property located on the west side of North Winery Avenue between East Washington and East McKenzie Avenues. Rezone Application No. R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A (Single Family Residential Agricultural) zone district to the R-1 (Single Family Residential)zone district. Tentative Parcel Map No. 2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square-foot minimum lot size. APN: 462-123-16s ZONING: From R-A to R-1 ADDRESS:4896 East Washington Avenue DATE ROUTED; March 6, 2014 COMMENT DEADLINE: March 27, 2014 If no response is received by the comment deadline, it will be assumed you have no comments to submit. WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTION? (If yes, specify.) REFECZ ►-0 A-fTAcHED Lf7TE2 DA IEJ D MA2CN 12 ) -Lo(y 10 REC,AV,75 7(D R—13 --01 y - SUGGESTION(S)TO REDUCE IMPACTS/ADDRESS CONCERNS: SAME As /,,E)bvE REQUIRED CONDITIONS OF APPROVAL: SAMF /aS AWVE IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific): REVIEWED BY: GSR PDAs-� F�JG.TiEGN �I 5 �1Z 3 �a�)� Name and Title Telephone Number Dale Council District 7;Roosevelt Community Plan FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File 210.414 400.21 410.201 550.10"Z" March 12, 2014 Mr. Bruce Barnes City of Fresno Development Dept., Planning Division 2600 Fresno Street, Third Floor Fresno, CA 93721 Dear Mr. Barnes, Rezone 2013-014 Drainage Area "Z" The proposed rezone lies within the District's Drainage Area "Z". The District's system can accommodate the proposed rezone. If there are any questions concerning this matter, please feel free to contact us. Sincerely, Gary Chapman Engineering Technician 111 GC/lrl KALetters\Rezone Lelters\Fresno rezone1201312013-014(z)(gc).docx 5469 E. OLIVE • FRESNO, CA 93727 • (559)456-3292 • FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.411 NOTICE OF REQUIREMENTS Page I of 4 PUBLIC AGENCY DEVELOPER BRUCE BARNES MIKE A.HAMZY,HARBISON INT,INC. Mn DEVELOPMENT SERVICES/PLANNING 2755 E.SHAW AVE.,SUITE 101 CITY OF FRESNO FRESNO,CA 93710 2600 FRESNO STREET,THIRD FLOOD FRESNO,CA 93721 PROJECT NO: 2013-003 ADDRESS: 4896 E.WASHINGTON AVE. APN: 462-123-16S SENT: Drainage Area(s) Preliminary Fee(s) Z $3,457.00 TOTAL FEE:$3,457.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental E Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/15 based on the site plan submitted to the District on 3/10/14 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, e') reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X Drainage from the site shall BE DIRECTED TO WASHINGTON,WINERY AND/OR MCKENZIE Mn a' AVENUES — b. Grading and drainage patterns shall be as identified on Exhibit No. _ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and C. Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: I Developer shall construct facilities as shown on Exhibit No. 1 as "MASTER PLAN FACILITIES TO BE CONSTRUCTED BY DEVELOPER". X None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: — Grading Plan — Street Plan — Storm Drain Plan — Water&Sewer Plan — Final Map — Drainage Report(to be submitted with tentative map) Other X None Required 4. Availability of drainage facilities: X a Permanent drainage service is available provided the developer can verify to the satisfaction ofthe City that runoff can be safely conveyed to the Master Plan inlet(s). — b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service. _ Permanent drainage service will not be available. The District recommends temporary facilities until C. permanent service is available. — d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with on Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to:submit a Notice of Intent and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April, 1997 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; t trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to:submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines(available at the District Office)to meet the requirements of the State General Permits, , eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. S. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No.2 for additional comments,recommendations and requirements. n Alan Hofmann Gary Cha an Assistant District Engineer/Design Project Engineer 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 CC: NICO REAL ESTATE FUNDS,LLC 191 W.SHAW AVE.,SUITE 108 FRESNO,CA 93704 z 0 0 IL 0 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 OTHER REQUIREMENTS EXHIBIT NO. 2 The following paragraphs only apply towards development of the individual parcels and are not conditions for the recording of the map. In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and maintained such that material that may generate contaminants will be prevented from contact with rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm drain system. The District encourages,but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities, product, or merchandise come into contact with and may contaminate storm water must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing is to be required unless such wash water can be directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas that directly connect to the District's system will not be permitted. Loading docks, depressed areas, and areas servicing or fueling vehicles are specifically subject to these requirements. The District's policy governing said industrial site NPDES program requirements are available. Contact the District's Environmental Department for further information regarding these policies related to industrial site requirements. Development No. TPM 2013-003 engr\perm it\exhi bit2\city-tpm\2013\2013-003(gc) co County of Fresno DEPARTMENT OF PUBLIC HEALTH DAVID POMAVILLE, DIRECTOR March 12, 2014 L00017600 Bruce Barnes 2602 City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Barnes: PROJECT NUMBER: R-13-014 TPM 2013-03 Rezone Application No. R-13-014 and Tentative Parcel Map No. 2013-03 were filed by Mike Hamzy of Harbison International, Inc., and pertains to 0.62±acre of property located on the west side of North Winery Avenue between East Washington and East McKenzie Avenues. Rezone Application No. R-13-014 is a request to amend the Official Zone Map to reclassify the property from the R-A (Single Family Residential Agricultural)zone district to the R-1 (Single Family Residential)zone district. Tentative Parcel Map No. 2013-03 proposes to subdivide the property into a remainder parcel for the existing residential dwelling and 3 parcels each with a 6,000 square-foot minimum lot size. APN: 462-123-16s ZONING: From R-A to R-1 ADDRESS: 4896 East Washington Avenue Recommended Conditions of Approval: • Construction permits for development should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559)445-5116. • Construction permits for the development should be subject to assurance that the City of Fresno community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Department of Health Services, Division of Drinking Water and Environmental Management (DDWEM). For more information call (559) 447-3300. REVIEWED BY: ­KevDlgitaly sigred hY Kerin Tsuda Kevin TsudaC.nty EN,°T'°�" ° `�° County email--Wuda@co.f s ­%US Date:2014.03.12 14,00.08-07'00' Kevin Tsuda, R.E.H,S. Environmental Health Specialist II (559) 600-3271 cc Glenn Allen- Supervising Environmental Health Specialist(CT 29.02) Mike Hamzy, Applicant (mike@harbisonint.com) Nico Real Estate Funds, Owner(masato@nikohomes.com) Promotion,preservation and protection of the community's health 1221 Fulton Mall/P.O. Box 11867/ Fresno,California 93775/Phone(559)600-3271/FAX(559)455-4646 Email: EnvironmentalHealth@co.fresno.ca.us•:• www.co.fresno.ca.us•a www.fcdph.org Equal Employment Opportunity❖Affirmative Action-:•Disabled Employer