Loading...
HomeMy WebLinkAboutPM 2011-08 - Cashier Memo - 3/7/2012 City MEMORANDUM DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT•DEVELOPMENT SERVICES DIVISION•2600 FRESNO STREE•FRESNO,CA 93721 DATE: March 7, 2012 TO: MARY BAKER Public Works Department FROM: JONATHAN BARTEL Development and Resource Management Department SUBJECT: SUBMITTAL OF PAYMENT FOR PARCEL MAP NO. 2011-08 THE FOLLOWING ITEMS ARE SUBMITTED FOR PROCESSING: 1. Check in the amount of$283.54 (Bank of America No. 198) 2. Copy of the Fee Letter identifying itemized applicable charges. If you have any questions, please contact me at 621-8076. Thank you, Jonathan Bartel JAMES RENNA 19$ 522 W FOUNTAIN WAY FRESNO,CA 93705 Dote- H-35/1210 633 Pay tothe C� Y e 1 F)wA,, Lj 2 Orderr oS` Ti /f - / Dollars Bank of America Sb7elds-West 1111 W Shields Avc Rvsno CA 559.486.2251 � 1 Fot E: 3 2 3000 3 S811:0 1913-0 F. 3 30-110 6 3 7 Sill Parcel Map No. 2011-08 Fee Letter AMOUNT DEFERRED, NET AMOUNT DUE @ EXTENSION DUE OCCUPANCY A. MISCELLANEOUS FEES&CHARGES 1. STREET TREES ]Residential(5-gallon)Street Trees @ $30.00]per Tree na na (A1) (Al) Street Tree inspection fees will be payable at the time of development of each parcel unless otherwise determined by Public Works. 2. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6) Lum Sum Charge as established by Public Works Director nall na 3. IRRIGATION PIPELINE(one-time maintenance fee) DO Lineal Feet @ $5.00 per LF na na 4. MONUMENT CHECK FEE 02 Lot&Outlots @ 30.00 per Lot $200.00 $200.00 (Min$200) TOTAL MISCELLANEOUS FEES&CHARGES $200.00 $200.00 EXHIBIT B v11/01101 Printed 02/27/12 5:02:04 PM Page 1 of 3 Parcel Map No. 2011-08 Fee Letter AMOUNT DEFERRED, NET AMOUNT DUE @ EXTENSION DUE OCCUPANCY B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED 0.4467 Gross Acres 0.2748 Net Acres 0.4467 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets 2 Units(residential) R-1 Zoning no Input"ugm"if within the Urban Growth Management Area or"no" 1. LOCAL DRAINAGE FEES FMFCD Drainage Area 0.0000 Acres per FMFCD @ $0 per Acre ria 2. SEWER CONNECTION CHARGES (a)Lateral Sewer Charge Lateral Sewer Charges satisfied. No Fees Due. (b)Oversize Sewer Charge Oversize Sewer Charges satisfied. No Fees Due. (c)Wastewater Facilities Charge Fee to be paid at the rate in effect at time of issuance of building permit. The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b) 3. WATER CONNECTION CHARGES (a)Service Connection Charges Existing Service Connections No Water Service Connection Charges due. (c)Frontage Charge Frontage Charges satisfied. No Fees Due. (d)Transmission Grid Main Charge Transmission Grid Main Charges satisfied. No Fees Due. (e)Transmission Grid Main Bond Debt Service Charge 0.2748 Net Acres @ $304.00 per Net Ac $83.54 Less Estimated TGM Bond Debt Service Charge Credits $0.00 Transmission Grid Main Bond Debt Service Charge $83.541 $83.541 $0.00 EXHIBIT B v11/01/01 Printed 02/27/12 5:02:04 PM Page 2 of 3 Parcel Map No. 2011-08 Fee Letter AMOUNT DEFERRED, NET AMOUNT DUE @ EXTENSION DUE OCCUPANCY 4. CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS (a)FIRE FACILITIES IMPACT FEE 1 21 Living Units(residential) @ $539.00 per Unit $1,078.00 (134) (b PARK FACILITY IMPACT FEE 1 Living Units(residential) @ $3,398.00 per Unit $6,796.00 (134) (c QUI) MBY PARKLAND DEDICATION FEE 2 Living Units(residential) @ $0.00 per Unit n/a (d)CITYWIDE REGIONAL STREET CHARGE 0.4467 Adjusted Gross Acres @ $0.00 per AG Ac n/a (e NE) W GROWTH AREA MAJOR STREET CHARGE 0.4467 Adjusted Gross Acres @ $0.00 per AG Ac n/a (f PO L) ICE FACILITIES IMPACT FEE 21 Living Units(residential) @ $624.00 per Unit $1,248.00 (134) ( TRg) AFFIC SIGNAL CHARGE 2 Living Units(residential) @ $450.94 per Unit $901.88 (134) (134) Potential fee obligation to be applied to new and/or future development. "Subject to vesting tentative map date,fee may not be applicable until 2-years after date of Final Map recordation;when applicable,fee is due at Building Permit for all un-developed lots at the fee rate then in effect. t Citywide Impact Fees due at occupancy(Reso.05-427,428,429) § Citywide Street Charge and New Growth Area Major Street Carge due at Building Permit(Reso.07-291) Total impact Fees&Charges $10,107.42 $83.54 $0.00 Note: EXTENSION total includes net results of construction credits SUMMARY TOTAL(A) MISCELLANEOUS FEES&CHARGES 1 $200.00 TOTAL(B) IMPACT FEES&CHARGES 1 $83.54 $0.00 TOTAL SUBDIVISION FEES and CHARGES DUE Wff H AGREEMENT cash $283.54 EXHIBIT 8 v11/01/01 Printed 02/27/12 5:02:04 PM Page 3 of 3