SUBJECT: NOTICE OF APPROVAL OF VESTING TENTATIVE PARCEL MAP NO. 2007-40
DATED SEPTEMBER 10, 2009, PROPOSING A 5-LOT COMMERCIAL PARCEL
MAP FOR PROPERTY LOCATED ON THE NORTHEAST CORNER OF THE
INTERSECTION OF EAST KINGS CANYON ROAD AND SOUTH ADLER
AVENUE; BETWEEN SOUTH WILLOW AND SOUTH PEACH AVENUES.
(APN[S]: 463-050-36, 37 &41)
The City of Fresno Development Services Division has completed its review of the subject tentative
parcel map dated September 10,2009. Pursuant to Section 12-1205 of the Fresno Municipal Code,
this letter is written to advise you that the Conditions of Approval dated May 05, 2011, are as noted
on the attached document.
Appeal: The divider or any aggrieved person may file an appeal regarding to conditions of approval
within fifteen (15)days from the date of approval.
To protest the Director's decision regarding the conditions of approval, you must appeal by filing a
written appeal with the Director of the Development and Resource Management Department.
Appeals must include the appellant's interest in/or relationship to the subject property, the decision
or action appealed,and specific reasons why the appellant believes the decision oraction appealed
should not be upheld.
Appeals must be submitted to the Director of the Development and Resource Management
Department prior to 5 p.m. on May 20, 2011.
EXPIRATION: The approval or conditional approval of this tentative Parcel Map expires two years
from the date of approval. The expiration shall terminate all proceedings and a final Parcel Map
may not be filed without first processing a new Tentative Parcel Map.
Modification of a Tentative Parcel Map after approval or conditional approval does not extend the
two year time limit.
EXTENSION: The divider may request up to a two year extension of the tentative map expiration
date by filing a written application together with the fee set forth in the Master Fee Schedule at the
time of the request with the Director of the Development and Resource Management Department
prior to the expiration date of the map. The applicant must state the reasons for requesting the
extension. New conditions may be imposed if an extension is granted.
Cumulative discretionary extensions may not exceed an aggregate of six years.
CEI Engineering Associates, Inc.
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 2
If you wish additional information, please contact the City of Fresno, Development and Resource
Management Department, Development Services Division, 2600 Fresno Street, Fresno,California
93721-3604; phone, (559) 621-8277. Your inquiry should be directed to either Jon Bartel
(engineering or improvements issues)or Will Tackett(planning or zoning issues).
Should you have any questions regarding the conditions you must notify either Jon Bartel at(559)
621-8277 or Will Tackett at(559)621-8063 by May 20, 2011, to request a review of the conditions.
Otherwise,the stipulated conditions of approval are in effect as of that date. No further notice will be
sent.
Sincerely,
DEVELOP NT SERVICES DIVISION
.lel
Will T tt, Planner I11
De Io ment & Resource Management ent
Enclosures: Vesting Tentative Parcel Map No. 2007-40 dated September 10, 2009
Conditions of Approval dated May 05, 2011
CITY OF FRESNO
DEVELOPMENT & RESOURCE MANAGEMENT DEPARTMENT
CONDITIONS OF APPROVAL
MAY 05, 201 1
VESTING TENTATIVE PARCEL MAP No. 2007-40
"A PLANNED DEVELOPMENT"
NORTHEAST CORNER OF THE INTERSECTION OF EAST KINGS CANYON ROAD AND SOUTH
ADLER AVENUE; BETWEEN SOUTH WILLOW AND SOUTH PEACH AVENUES
NOTICE TO PROJECT APPLICANT
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act(SMA),
Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The
following specific conditions are applicable to this tentative map.
In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees,
dedications, reservations or exactions for this project are subject to protest by the project applicant
at the time of approval or conditional approval of the development or within 90 days after the date of
the imposition of the fees, dedications, reservations or exactions imposed on the development
project.
Upon conditional approval of Vesting Tentative Parcel Map No. 2007-40, dated September 10,
2009, the subdivider may prepare a Parcel Map (Final)in accordance with the approved tentative
parcel map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an
appeal be filed pursuant to Section 12-1207 of the FMC, the application will be scheduled to be
heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal
pursuant to Section 12-1207.2 of the FMC.
Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA
apply,the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map,
together with a copy of Section §66436(a)(3)(A)of the SMA,to any public entity or public utility which
has previously acquired a right-of-way easement.
PLAN CONSISTENCY
The subject site is located within the boundaries and jurisdiction of the 2025 Fresno General Plan
and Roosevelt Community Plan. These plans designate the subject property for Community
Commercial planned land uses.
The subject property is currently zoned under the C-2113A-151cz(Community Shopping Center/15-
Foot Boulevard Area Overlay/with conditions of zoning); C-2113A-20/cz (Community Shopping
Center/20-Foot Boulevard Area Overlay/with conditions of zoning), and C-Pfcz(Administrative and
Professional Office/with conditions of zoning) zone district classifications.
Rezone Application No. R-04-011 has been filed proposing to rezone the entirety of the
approximately 25 acre subject property to the C-216A-20 (Community Shopping Center/20-Foot
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 2
Boulevard Area Overlay)zone district classification.
Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix)of the 2025 Fresno
General Plan(and applied to all community plans),the proposed C-2/13A-20(Community Shopping
Center/20-Foot Boulevard Area Overlay)zone district is consistent with the existing Community
Commercial planned land use designation for the subject property.
1. Approval of Vesting Tentative Parcel Map No. 2007-40 is contingent upon approval of
Rezone Application No. R-04-011 by the Council of the City of Fresno.
a) Rezoning of the subject property pursuant to Rezone Application No. R-04-011 shall
become effective prior to recordation of a Parcel Map.
MITIGATION MONITORING REQUIREMENTS
2. Approval of Vesting Tentative Parcel Map No. 2007-40 is contingent upon certification of
Final Environmental Impact Report (EIR) No. 10138(SCH No. 2007091064).
a) Certification of Final Environmental Impact Report(EIR)No. 10138 shall have occurred
prior to acceptance of a Parcel Map.
b) Development and subdivision of the subject property shall be subject to implementation
of the mitigation measures, fees, and timelines as stipulated within the Mitigation
Monitoring and Reporting Program for the Fresno Southeast Walmart Expansion Project,
identified as Attachment "A" of Final EIR No. 10138; and, the requirements stipulated
herein.
• NOTE: The mitigation measures identified within the Mitigation Monitoring and
Reporting Program for the proposed project are required to be satisfied prior to
issuance of permits for grading activities and/or construction; or, prior to
issuance of certificates of occupancy. These mitigation measures do not apply
to recordation of a Parcel Map.
PLANNING &ZONING
3. Comply with the provisions of the State of California Government Code Sections§66410 -
§66499.58 of the SMA; and,Articles 2 and 10 of Chapter 12 of the City FMC(Establishment
of Land Use Districts and Regulations Applicable Therein and Subdivision of Real Property,
respectively).
• NOTE: Pursuant to Section 66426 of the Subdivision Map Act a tentative and
final (tract) map shall be required for all subdivisions creating five or more
parcels except where the land consists of a parcel or parcels of land having
approved access to a public street or highway,which comprises part of a tract of
land zoned for commercial development, and which has the approval of the
governing body as to street alignments and widths.
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 3
In accordance with the provisions of Section 12-218.5 of the Fresno Municipal
Code, there shall be adequate vehicular access from a dedicated and improved
street, service road,or alley,to all lands within the C-2 zone district,the design of
which shall be approved by the Director of Public Works.
A relinquishment of vehicular access rights was established pursuant to Parcel
Map No. 92-06 (recorded in Book 54, Pages 13-14 of the Official Records of
Fresno County) for the South Adler Avenue frontage of proposed Parcels "C"
through "E" of Vesting Tentative Tract Map No. 2007-40 (Parcel "D" of Parcel
Map No. 92-06).
a) Compliance with aforementioned provisions of the Subdivision Map Act and Fresno
Municipal Code therefore requires that all parcels must provide approved access to a
public street right-of-way under a planned development special permit,where adequate
internal circulation is provided by a private streets or service roads in an approved
planned development.
i) Approval of Vesting Tentative Parcel Map No. 2007-40 is contingent upon approval
of Conditional Use Permit Application No. C-04-018.
ii) The site/development plan for Conditional Use Permit Application No. C-04-018 shall
be approved prior to recordation of the Parcel Map and shall include the property
lines as proposed pursuant to Vesting Tentative Parcel Map No. 2007-40, thereby
authorizing the creation of the planned development.
b) Execute a Mutual Easements and Reciprocal Use Agreement between Parcels "A"
through "E" of Vesting Tentative Parcel Map No. 2007-40, inclusive. The Mutual
Easements and Reciprocal Use Agreement shall, at a minimum, provide:(1)Mutual and
reciprocal access to East Kings Canyon Road; (2)Shared parking; (3)Cross drainage;
(4) Shared solid waste facilities (if applicable); and, (5) Provisions and obligations for
retention and maintenance of access, utilities, fire suppression systems, facilities and
improvements on the subject property. The required Mutual Easements and Reciprocal
Use Agreement shall also contain a term, which assures that combinations of facilities
within the proposed planned development shall provide the automobile parking area or
number of spaces required for each facility,and that the area or spaces provided for one
facility shall not be construed as satisfying the requirements of another facility.
i) Access, circulation, and parking on all of the properties to be included within, and
made party to, the Mutual Easements and Reciprocal Use Agreement shall be
provided and maintained in accordance with approved entitlements for the respective
properties (Conditional Use Permit Application No. C-04-018); or, any revisions or
amendments thereto, as may be approved by the Development and Resource
Management Department;or, City of Fresno Planning Commission or City Council as
appropriate. No modifications to said access or circulation may be made without
prior approval from the Development and Resource Management Department.
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 4
• NOTE: The conditions of the Mutual Easements and Reciprocal Use Covenant
are intended to benefit the public and public properties as well as properties
appurtenant;and, secure the enforceability of properties'obligations for retention
and maintenance of access, utilities, facilities, and improvements. Failure to
comply with the terms of the Covenant may result in the revocation of the
Certificate of Occupancy of Special Permit by the City for use of any Parcel of
the properties involved. Accordingly, the City of Fresno shall have the right to
enforce this Statement by any legal or equitable means. For further information
regarding these requirement Contact the Development and Resource
Management Department at(559)621-8277.
ii) Final, executed and notarized documents shall be recorded with the parcel map.
c) All of the agreements required to be executed within this section shall run with the land
and bind all successors and assigns.
• NOTE: Any amendment to the above provisions or any other provision
specifying any right of the City shall require the prior written consent of the City.
GENERAL CONDITIONS
4. Any existing and/or proposed structure(s)on the site may be affected due to the location of
the proposed parcel lines. The placement of a parcel line in close proximity to any existing
and/or proposed structure(s)requires that the structure(s) be found in compliance with the
fire resistive standards of the Uniformed Building Code, Chapter 5.
a) Compliance with the prevailing Uniform Building Code as it relates to exterior wall
protection, allowable area, etc. (as applicable to new parcel line locations) must be
demonstrated prior to recordation of a Parcel Map. Contact the Development and
Resource Management Department, Building and Safety Services Division at(559)621-
8200.
• NOTE: In the event the structures do not comply they must be modified so as to
meet the requirement.
5. All existing offsite overhead utilities within the limits of the tentative parcel map, including but
not limited to, electrical systems, communication systems and street lighting systems shall
be placed underground in accordance with the provisions of Section 12-1011 and Resolution
No. 78-522/88-229, and the policies of the Public Works Department.
6. All work and engineered plans for public improvements shall conform to the 2002 Edition of
the City of Fresno Standard Specifications and Drawings(City Council Resolution No.70-36
and Resolution Nos. 84-361)and any amendments thereto, hereinafter referred to as the
Public Works Standards.
7. All off-site and public improvements shall be constructed in accordance with the Public
Works Department Standards, Specifications and Policies. Engineered construction plans
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 5
and estimates for all or part of the required work shall be required prior to the issuance of
Street Work Permits unless otherwise determined by the City Engineer. The cost for such
plan preparation, review and construction inspection shall be at the subdivider's expense.
8. The subdivider shall dedicate and construct public easements to facilitate the construction of
curbs, gutters, sidewalks with street tree wells and irrigation systems (when applicable),
permanent pavement, streettsafety lighting, bus bays, right turn lanes, bike lanes, bike
paths, multi-purpose trail,wheelchair ramps and public utilities in accordance with City plans,
ordinances, resolutions and policies, and the Standard Specifications of the Public Works
Department within the limits of the parcel map.
• NOTE: Telephone, cable, and other public utilities which propose above-ground
facilities (such as cabinets) determined by the Development and Resource
Management Department Director to be oversized shall be located in an
additional easement area outside of the required landscape strip. .
a) All such public easements shall be identified and dedicated with the processing and
recordation of the Final Parcel Map and/or at the time of Special Permit review for the
proposed development of the parcel(s).
9. A minimum four foot wide clear path of travel is required along all street frontages of the
property as required by Title 24 of the California Administration Code, current ADA
regulations; and, as determined by the City Engineer.
• NOTE: An on-site pedestrian easement and construction of a path may be
required if Title 24 and ADA provisions cannot be met within the public rights-of-
way.
a) Sidewalks (including wheelchair ramp landings) and driveway approaches, for
undeveloped parcels of this parcel map,shall be required and constructed at the time of
site development.
b) Any existing sidewalks in excess of 2%maximum slope must be brought into compliance
prior to acceptance by Public Works.
c) Curb ramps with "Detectable Warning Devices" are required at all corners within the
limits of this parcel map.
10. Repair all existing damaged and/or off grade off-site concrete street improvements as
determined by the City of Fresno Public Works Department, Construction Management
Division, (559) 621-5600.
11. Existing driveway approaches not identified for current or future utilization shall be removed
and sidewalk (when applicable), curb and gutter shall be installed to match existing or
proposed street line and grade as determined by the City Engineer.
12. When street/safety lighting installations are required,street lighting plans shall be submitted
Conditions of Approval
Vesting Tentative Parcel Map No, 2007-40
May 05, 2011
Page 6
for review and approval by the Traffic Engineer prior to the issuance of permits for the work.
Services to street lighting installations shall be separated from the electrical service(s)
serving the development. The type, location and service for street lighting installations shall
be as determined by the Traffic Engineer. Street lighting installations shall be dedicated to
the City upon completion and acceptance of the installations.
13. If not existing, street work on major streets shall be designed to include Intelligent
Transportation Systems (ITS) conduit in accordance with the Public Works ITS
specifications.
14. All required signing and striping shall be installed and paid for by the developer/owner. The
signing and striping plans shall comply with the current Caltrans standards and shall be
submitted to the Public Works Department for review and approval as a part of the street
improvement plans for this tentative map.
15. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants,
poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction
with the construction of off-site improvement requirements, shall be the responsibility and at
the expense of the subdivider.
16. The subdivider may either construct or install required public improvements,when required;
or, enter into a bonded secured agreement with the City of Fresno providing for the
construction of the required improvements and sufficient security prior to the recordation of a
Parcel Map (final).
17. Whenever covenants or agreements are required, they shall be prepared by the city upon
receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and
agreements must be approved by the City Attorney's Office and shall be recorded with the
final parcel map.
SPECIFIC CONDITIONS
STREETS AND RIGHTS-OF-WAY
1$_ The following street names shall be corrected on the tentative and parcel maps:
Street Name Status Required Change
East Huntington Blvd. Change East Huntington Boulevard
E. Inyo St. Change East lnyo Street
E. Mono Ave. Change East Mono Street
E. Kings Canyon Rd. Change East Kings Canyon Road
S. Adler Ave. Change South Adler Avenue
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 7
19. Comply with all of the requirements and conditions stipulated within the attached Public
Works Department,Traffic and Engineering Services Division memorandum dated May 04,
2011.
• NOTE: Mitigation measure requirements of the Traffic Engineering Manager,as
referenced within the Traffic Engineering Services Division memorandum, are
implemented through the Mitigation Monitoring and Reporting Program for Final
EIR No. 10138. These mitigation measures do not apply to recordation of a
Parcel Map.
20. A feasibility study for all proposed or required vacations of existing public rights-of-way or
service easements is required to be completed priorto recordation of a Parcel Map. Contact
Alan James, Supervising Engineering Technician at(559)621-8693 forfurther information.
a) Attached for the subdivider's records and/or consideration is the attached memorandum
from Alan James dated September 29, 2008.
21. Pursuant to Section 12-1206(c)(5) of the FMC, the subdivider shall provide for the
installation of street trees, or payments in lieu of immediate installation of street trees and
payment of street tree fees applying to the subdivision or the division of land as designated
in the Master Fee Schedule. Contact the Parks Supervisor,Hilary Kimber at(559)621-1345
for further information.
a) Comply with all requirements stipulated within the attached memorandum from the
Public Works Department, Park Supervisor dated October 07, 2008.
SAN ITARY S EW ER SERVICE
The nearest sanitary sewer mains to serve the proposed project are an 8-inch main located in East
Mono Street, an 8-inch main located in East Kings Canyon Road. Sanitary sewer facilities are
available to provide service to the site subject to the following requirements:
22. Comply with all of the requirements stipulated within the attached memorandum from the
Department of Public Utilities, regarding Sanitary Sewer Requirements for Conditional Use
Permit Application No. C-04-018 dated September 01, 2009; and, the following:
a) Abandon any/all existing on-site private septic systems.
• NOTE: A Mutual Easement and Reciprocal Use Agreement is required for on-
site private sanitary sewer facilities(reference conditions included herein above
under the Planning and Zoning subsection for further information regarding
requirements for, and execution of Mutual Easement and Reciprocal Use
Agreements).
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page S
WATER SERVICE
The nearest water mains to serve the proposed project are a 14-inch main located in South Adler
Avenue and a 12-inch main located on-site within a 30-foot public utility easement. The following
water improvements shall be required prior to providing City water service to the project:
23. Comply with all of the requirements stipulated within the attached memorandum from the
Department of Public Utilities,Water Division, regarding Water Requirements for Conditional
Use Permit Application No. C-04-018 dated September 01, 2009; and, the following:
a) Seal and abandon any/all existing on-site well(s) in compliance with the State of
California Well Standards, Bulletin 74-90 or current revisions issued by the California
Department of Water Resources and City of Fresno Standards.
• NOTE: A Mutual Easement and Reciprocal Use Agreement is required for on-
site private water services(reference conditions included herein above underthe
Planning and Zoning subsection for further information regarding requirements
for, and execution of, Mutual Easement and Reciprocal Use Agreements).
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT(FMFCD)
24. The subdivider shall be required to comply with all of the specific requirements imposed by
the FMFCD for the subdivision or any amendments or modifications to those requirements,
which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the
FMC. These requirements are identified in the attached memorandum from FMFCD
regarding Conditional Use Permit Application No. C-04-018 dated September 02, 2009.
FRESNO IRRIGATION DISTRICT (FID)
25. Comply with all of the requirements stipulated within the attached memorandum from the
Fresno Irrigation District(FID) regarding Conditional Use Permit Application No. C-04-018
dated September 08, 2009.
DEVELOPMENT FEES AND CHARGES
This project is subject to the following development fees and charges:
Fresno Metropolitan Flood Control Fee $59,199.00
SEWER CONNECTION CHARGES FEE RATE
a. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100'depth)
b. Oversize Charge [1] $0.051sq. ft. (to 100' depth)
c. Trunk Sewer Charge NIA
Service Area:
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 9
d. Wastewater Facilities Charge S.T.E.P.
e. Copper Avenue Sewer Lift Station Charge [1] NIA
f. Fowler Trunk Sewer Interim Fee Surety[1] NIA
g. House Branch Sewer Charge [2] NIA
h. Millbrook Overlay Sewer[1] NIA
WATER CONNECTION CHARGES FEE RATE
i. Service Connection Charge Fee based on service(s)and
meter(s) sizes specified by owner;
fee for service(s)and Meter(s)
established by the Master Fee
Schedule.
j. Frontage Charge [1] $6.50/lineal foot
k. Transmission Grid Main Charge [1] $643/gross acre
(parcels 5 gross acres or more)
I. Transmission Grid Main
Bond Debt Service Charge [1] $243/gross. acre
(parcels 5 gross acres or more)
m. Water Supply Fee [2] NIA
Service Area:
n. Well Head Treatment Fee [2] NIA
Service Area:
o. Recharge Fee [2] NIA
Service Area:
p. 1994 Bond Debt Service [1] NIA
Service Area:
CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE
q. Fire Facilities Impact Fee— Citywide [4]
Industrial $23611000sq.ft t
r. Park Facility Impact Fee— Citywide [4] NIA
Conditions of Approval
Vesting Tentative Parcel Map No. 2007-40
May 05, 2011
Page 10
s. Quimby Parkland Dedication Fee [2] NIA
t. Citywide Locally Significant Street Charge [3]
Commercial Retail $16,1311adj. acre
u. New Growth Area Major Street Fee [3]
Commercial Retail NIA
v. Police Facilities Impact Fee—Citywide [4]
Industrial $66511000sq.ft t
w. Traffic Signal Charge [1] $45.98/ADT t
Notes:
On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008—023 requiring the
payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September
20,2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this
fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building
permits. (The requirement to pay this fee is currently suspended by Fresno County. However,payment of this
fee may be required if the fee has been reinstated at the time of issuance of building permits on the subject
property.)
*Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8 Living Unit Equivalents
for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit
Equivalents.
**Upon occupancy of the project,the subdivider shall pay the appropriate sewerfacility charge pursuant to the
Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater
Division, Environmental Services Section (559-621-5153).
[1] Deferrable through Fee Deferral Covenant.
[2] Due at Final Map.
[3] Due at Building Permit.
14] Due at Certificate of Occupancy.
t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and
conditions of approval from Transportation Planning through the entitlement review process based on Average
Daily Trips of the proposed project.
City of
CamC ,&l&
DATE: May 4,2011
TO: Will Tackett, Planner III
Development and Resources Management Department
THROUGH: Louise Gilio,Traffic Planning Supervisor
Public Works Department,Traffic & Engineering Services Divislo
L
FROM: Ann Lillie Senior Engineering Technician
Public Works Department,Traffic& Engineering Services Division
SUBJECT: Tentative Parcel Map 2047.40, Public Works Conditions of Approval
Location: 5075-5125 East Kings Canyon Road:between Willow and Peach
Owner: Wal-Mart Stores, Inc.
PUBLIC IMPROVEMENT REQUIREMENTS
The Public Works Department, Traffic Planning Section, has completed its review and the following
requirements are to be placed on this tentative map as a condition of approval by the Public Works
Department.
The following requirements are based on city records and the accuracy of the existing and proposed
on-site and off-site conditions depicted on the tentative map_ Requirements not addressed due to
omission or misrepresentation of information, on which this review process is dependent,will be
imposed whenever such conditions are disclosed.
Construct or Install the required Improvements, or contact Public Works at(559) 621-8685 to
enter into a bonded secured agreement for these improvements.This must be executedrp for to
perfection of this parcel map.
When preparing Street Plans and/or Traffic Control Plans for projects in the City of Fresno contact
Traffic Engineering (Randy Schrey at (559) 621-8807) in advance to make sure that sidewalks or an
approved accessible path remain open during construction.
General Conditions
• Submittal of engineered construction plans to the Planning and Development Department for
approval must be made prior to the final map.
• All required signing and striping shall be installed and paid for by the developer/owner. The
signing and striping plans shall comply with the current Caltrans standards and be submitted as
a part of the street improvement plans.
• Additional offsite improvements are as required per Conditions of Approval for C-04-018.
• Curb ramps are required at all corners within the limits of this parcel map.
• Repair or replace all existing damaged and/or off-grade offsite concrete improvements as
determined by the City of Fresno Public Works Department, Construction Management Division,
(559) 621-5500.
Page 1 of 3
PM 2007-40
• Underground all existing offsite overhead utilities with the limits of this map in accordance with
Fresno Municipal Code Section 12-1011 and Resolution No. 78-522188-229.
Street Dedications and Vacations
Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs,fire hydrants, bus stop
benches, mail boxes, news stands, trash receptacles,tree wells, etc. within the public right of way.
Also, identify the required 4' minimum path of travel along the public sidewalk directly in front of
property, as required by the California Administration Code (Title 24). A pedestrian easement may be
required If Title 24 requirements cannot be met.
The construction of any overhead, surface or sub-surface structures and appurtenances in the public
rights-of-way is prohibited unless an encroachment permit is approved by the City of Fresno Public
Works Department, Engineering Division, Special Districts/ Projects and Right of Way Section, (559)
621-8693. Encroachment permits must be approved prior to issuance of building permits.
Street Improvements
All Improvements shall be constructed in accordance with the Standard Specifications and Standard
Drawings of the City of Fresno, Public Works Department. Street Construction Plans are required
and shall be approved by the City Engineer.The performance of any work within the public street
rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMITrp for to
commencement of work. Contact the City of Fresno Public Works Department, Engineering Services
Section at (559) 621-8686 for detailed information. All required street improvements must be
completed and accepted by the city prior to recordation.
East Kings Canyon Road: Arterial
1. Construct concrete curb and gutter to Public Works Standard P-5. The curb shall be
constructed to a 25' commercial pattern.
2. Redesign and construct a street type approach to Public Works Standard(s) P-76. Provide
10' of red curbing (3 coats)on both sides of the proposed driveway approaches.
3. Redesign and construct a street type approach to Public Works Standard(s) P-77. Provide
10' of red curbing(3 coats)on both sides of the proposed driveway approaches.
1. Construct an underground street lighting system to Public Works Standard E-1 within the limits
of this application. Spacing and design shall conform to Public Works Standard E-7 for Arterial
Streets. -OR- show the existing street light locations on the plans, -AND-that they are
constructed per current City of Fresno Public Works Standards.
Traffic I Ract Stud
This development will generate a total of 92 a.m./325 p.m. peak hour trips and generate a count of
3,728 Average Daily Trips (A.D.T.), based upon the calculations done for C-04-018. (See Conditions of
Approval)
A Traffic Impact Study(TIS) is required and has been submitted(TIS 09.014). Comply with the
mitigation measure requirements of the Traffic Engineering Manager.
Page 2 of 3
PM 2007-40
Traffic Signal Mitigation Impact TSMC Fee;
This project shall pay its TSMI Fee at the time of building permit based on the trip generation rate(s)
as set forth in the latest edition of the ITE Generation Manual.
Fresno Ma'or Street Impact FMSI Fees:
This entitlement is in the Infill Area; therefore pay all applicable City-wide regional street impact fees.
Regional Transportation Mitigation Fee RTM :
Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201,
Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocog.org. Provide proof of payment or
exemption prior to issuance of building permits.
Page 3 of 3
PM 2007-40
Cify of
Planning & Development Department
2600 Fresno Street a Third Floor Please Reply To;
Fresno, California 93721-3604 Will Tackett
(559)621-8277 FAX (559) 498-1026 (559) 621-8063
VESTING TENTATIVE PARCEL MAP REVIEW NO. 2007-40
DATE: 9/29/2008
TO: AlanJames
Please review the attached Vesting Tentative Parcel Map No. 2007-40 and make your
comments below:
Return this for to: Will Tackett, Planner III, Planning and Development Department,
Planning Division. Should you have any questions call me at the number listed above.
COMMENTS:
GES (/ ),p , - e r / ,` �- o C/r
7- /Z G Ja 7- .5 c/2E ,-1-- /f/.S `�c ge Q SSOz 11.
-DJ
L V tC= 7- 41 EEPE 4 T / !e I
/U._1eL E /7 E13 -e �./� c k5 .� 0 . f� X11
f - 950 " 5769 ✓
GEWTHAL TITLE COMPANY
Recording Requested By: RECORDED IN OFFICIAL RECORDS of
Public Works Department FRESNO COUNTY,CALWOR
City of Fresno AT-----MIN PAST_ M
No Fee-Govt. Code Sections
6103 and 27383 FEB 2 8 1995
When Recorded Mail to: FRESNO COUNTY CALIFORNIA
PUbfio Works Department WILLIAM C.GRttNwoob,county Recorder
City of Fresno JODI cAMP FEE
2604 Fresno Street
BY DEPUTY RECORDERL$
Fresno, CA 93721.3623
SPACE A�BBOOVVE''T�HIS LINE FOR RECORDER'S USE
APN 463-050-139;0r__G_1-'z 9?+0
DEED OF EASEMENT
For a valuable consideration, receipt of which is hereby acknowledged, Stephen-Investments Inc., a California
Corporation, GRANTOR, hereby GRANTS to the City of Fresno, a municipal corporation, GRANTEE, a non-
exclusive easement and right-of-way for ingress and egress purposes.over, through,and across that certain parcel
of land situated in the County of Fresno, State of California, described as follows:
Parcel D of Parcel Map 92-06, Book 54 of Parcel Maps pages 13, 14, and 15, Fresno County.
Said easement shall not be blocked by GRANTOR and kept free of any surface obstructions so that GRANTEE
may have vehicular access at all times.
DAVID .COKER
�F E?5?9/30/95 11r
LS 4690
OF CAH
STEPHEN IN ENTS,
Dated: , 19
TT Y. Ste hen Pilibos President
Lucille Pilibos, Secretary
December 6,1994 f5
December 6,1994
3
DEPARTMENT OF PUBLic WORKS
TO: Will Tackett, Planner III
Planning Department
FROM: Hilary Kimber,Parks Supervisor 11(559.621.8794)
Public Works, Engineering Division
DATE: October 7, 2008
SUBJECT: Tentative Parcel Map 2007-40
The Department of Public Works offers the following comments regarding TPM 2007-40 located
on the northeast corner of the intersection of South Adler Avenue and East Kings Canyon Road:
1. The Public Works Department requires one street tree be planted for every 60 lineal feet
of street frontage. There are 534.47 lineal feet of street frontage on S. Adler Ave.
resulting in the requirement of nine (9) street trees.
2. There are historical palms (Washingtonia filifera)planted in the parkstrip on E. Kings
Canyon Rd. These trees are to remain and no additional street trees or irrigation will be
required on this street.
3. The approved street tree variety for S. Adler Ave. is:
Ginkgo biloba `Autumn Gold' Maidenhair Tree
4. Public Works, Engineering Division requests a landscape and irrigation plan to be
submitted at the scale of 1"=20' for the street trees within the public right-of-way..
Cit)/ O1 ��5y,5k1�ATlOR SQ��Q
City
f`F I k I r-- I ng-p TP�1.=
a:
DEPARTMENT OF PUBLIC UTILITIES a
9 �
HRGEMENT S�
Providing Life's Essential Services
DATE: September 1, 2009
TO: BONIQUE SALIVAS, Planner
Planning and Development Department, Planning Division
FROM: ROBERT A. DIAZ, Senior Engineering Technician
Department of Public Utilities, Administration
SUBJECT: SANITARY SEWER REQUIREMENTS FOR CONDITIONAL USE PERMIT C-04-018
General
C-04-018 - RESUBMITTAL, NOT A NEW APPLICATION-Applicant has made changes to the site
plan from the last submittal of September 2007. C-04-018 has been Bled by CEI Engineering,Inc.,on
behalf of Wal-Mart Stores,Inc. The application pertains to approximately 24.5 acres of property at, and
adjacent to, 5125 East Kings Canyon Road,on the northeast corner of East Kings Canyon Road and South
Adler Avenue, APN 463-050-36, 37,and 41. The site plan routed in 2007 requested authorization to
expand the existing Wal-Mart store by some 90,200 square feet to create a Supercenter and establish a
Type 20 ABC license at the store. The CUP also proposed the development of six retail building pads,
ranging:from 4,000-8,740 square feet in size,on four smaller parcels to be created by subsequent
subdivision application at the southwest portion of the site,including one drive-through food-beverage
outlet. The applicant has revised the CUP request. The changes included in this revision are as follows:
Building is being downsized to 177,809 square feet and a 3,377 square foot outdoor garden center has
been added; The elevations have been updated with new rebrand;Front parking field has been unproved
to address access concerns and to utilize existing trees-landscape areas and preservation of the historical
palms; All of the outlots are still the same layout as 2007 version with the exception of moving the future
buildings 20 feet north out of the utility easements, therefore no more relocation-impact to utilities; The
Bale and Pallet storage area has been adjusted to meet fire code requirements.
Environmental Recommendations
A NEGATTVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts
can be mitigated without further study or are not serious enough to warrant an Environment Impact
Report.
Sanitary Sewer Requirements
The nearest sanitary sewer mains to serve the proposed project are an 8-inch main located in East Mono
Street and an 8-inch main located in East Kings Canyon Road. Sanitary sewer facilities are available to
provide service to the site subject to the following requirements:
1. Construct an 84nch sanitary sewer main in North Adler Avenue from East Mono Street north
across the project frontage.
2. On-site sanitary sewer facilities shall be private.
3. Separate sewer house branches are required for each lot.
4. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for
Department of Public Utilities review and approvals for proposed additions to the City Sewer
System.
5. All public sanitary sewer facilities shall be constructed in accordance with City Standards,
specifications,and policies.
6. The project developer should contact Wastewater Management Division/Environmental Services
(559) 621-5100 regarding conditions of service for special users.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge
2. Oversize Sewer Charge
3, Trunk Sewer Charge
4. Trunk Sewer Basin: Chestnut
5. Wastewater Facilities Charge(Non-Residential)
6. Upon connection of this Project to the City Sewer System the owner shall be subject to payment of
Sewer Facility charges per Fresno Municipal Code Section 6-304 and 6-305. Sewer Facility
Charges consist of two components, a Wastewater Facilities Charge and Trunk Sewer Charge
where applicable.
7. Sewer Facility Charges are collected after occupancy on a bi-monthly basis over time based on
metered(water or sewer effluent)usage.The developer may contact the Department of Public
Utilities/Wastewater-Environmental Control at(559) 621-5153 to receive an estimated cost of the
Sewer Facility Charges applicable to the project(based on a constant sewer discharge and loading
(Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the
current rates in effect, at that time,per Fresno's Master Fee Resolution. The developer shall
provide data regarding estimated sewer discharge rates [flow]and loading [BOD/TSS levels]
required for calculating the estimated charges.
City of SpN1JAtlUk SOf/��gfr�
°DPU,.
4 �p
DEPARTMENT OF PUBLIC UTILITIES
q�A�4hAC�ENS Sf'��?
Providing Life's EsseEn`dal Services
DATE: September 1, 2009
TO: BONIQUE SAUNAS, Planner
Planning and Development Department,Planning Division
FROM: ROBERT A.DIAZ, Senior Engineering Technician
Department of Public Utilities, Administration
SUBJECT: WATER REQUIREMENTS FOR CONDITIONAL USE PERMIT C-04-018
General
C-04-018 -RESUBMITTAL,NOT A NEW APPLICATION -Applicant has made changes to the site
plan from the last submittal of September 2007. C-04-018 has been filed by CEI Engineering,Inc., on
behalf of Wal-Mart Stores,Inc. The application pertains to approximately 24.5 acres of property at, and
adjacent to, 5125 East Kings Canyon Road, on the northeast corner of East Kings Canyon Road and South
Adler Avenue, APN 463-050-36, 37, and 41. The site plan routed in 2007 requested authorization to
expand the existing Wal-Mart store by some 90,200 square feet to create a Supercenter and establish a
Type 20 ABC license at the store. The CUP also proposed the development of six retail building pads,
ranging from 4,000-8,740 square feet in size, on four smaller parcels to be created by subsequent
subdivision application at the southwest portion of the site,including one drive-through food-beverage
outlet. The applicant has revised the CUP request. The changes included in this revision are as follows:
Building is being downsized to 177,809 square feet and a 3,377 square foot outdoor garden center has
been added; The elevations have been updated with new rebrand; Front parking field has been improved
to address access concerns and to utilize existing trees-landscape areas and preservation of the historical
palms;All of the outlots are still the same layout as 2007 version with the exception of moving the future
buildings 20 feet north out of the utility easements, therefore no more relocation-impact to utilities; The
Bale and Pallet storage area has been adjusted to meet fire code requirements.
Environmental Recommendations
A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts
can be mitigated without further study or are not serious enough to warrant an Environment Impact
Report.
Water Requirements
The water mains to serve the proposed project are a 14-inch main located in North Adler Avenue and a
12-inch main located on-site within a 34-foot public utility easement. Water facilities are available to
provide service to the site subject to the following requirements:
1. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed
revisions to the City Water System.
2. All Public water facilities shall be constructed in accordance with The Department of Public
Works standards, specifications and policies.
3. All water main easements shall be clear and unobstructed by buildings or other structures. No
fencing or wall shall either enclose or be located above the sewer main. The planting plan, for any
proposed landscape within the easement, shall be approved by the Department of Public Utilities.
No Trees shall be located within 8 feet of the sewer main
4. On-site water services shall be private.
5. Installation of water service(s) and meter box(es)shall be provided to each lot.
Water Fees
The following Water Connection Charges and fees shall be paid for the project.
1. Payment for installation of water service(s) and/or Meter(s)is required.
2. Water Connection Charges are due and shall be paid
File No.214.413
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER
Kevin Fabino STEPHEN INVESTMENTS
Planning&Development Department CIO CEI ENGINEERING ASSOCIA'T'ES,INC
City of Fresno 4237 W.SWIFT AVE.
2600 Fresno Street FRESNO,CA 93722
Fresno,CA 93721
PROJECT NO. 2004-018REV2 PRELIMINARY FEE(S)(See below)
DRAINAGE AREA " Y DRAINAGE AREA X' X_ 1. $59,199.€10
DATE 9/2LDRAINAGE AREA o{
APN 463-050-36,37&41 _ TOTAL FEE — $59,199.00
ADDRESS 5125 E.KINGS CANYON RD.
The proposed development will gencrate s(orm runoff which produces potentially signifi&ant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental Quality Act and the National Environmental Policy Act. The District
in cooperation with the City and County has developed and adopted the Storm Drainage and
Flood Control Master Plan. Compliance with and implementation of this Master Plan by this ■
development project will satisfy the drainage related CEQA/NEPA impact of the project
mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to
issuance of a building permit at the rates in effect at the time of such issuance. The fee
indicated above is valid through February 28,20 10 based on the site plan submitted to
the District on 08125/09 Contact FMFCD for a revised fee in cases where changes are
made in the proposed site plan which materially alter the proposed impervious area.
Considerations which may affect the fee obligation(s)or the timing or form of fee paym"t:
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master flan storm drainage facilities may be constructed,or required to be constructed in M
lieu of paying fees.
d) The actual cost incurred in constructing MasterPlan drainage system facilities is credited IQ
against the drainage fee obligation.
e) When the actual costs incurred in constructing MasterPlan facilities exceeds the
drainage fee obligation,reimbursement will be made for the excess costs from future
fees collected by the District from other development.
499-0IN}UiV].MFs 5469 E<OLIVE- FRESNO,CA 93727 - (559)456-3292- L AX(.559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
f) Any request for a drainage fee refund requires the entitlement cancellation and a written
request addressed to the General Manager of the District within 60 days from payment of
the fee. A non refundable$300 Administration fee or 5%of the refund whichever is less
will be retained without fee credit.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
l. a. Drainage from the site shall be directed to
X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 /4
G. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Pian.
2. The proposed development shall construct andlor dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. l as "Master Plan Facilities
to be constructed by Developer".
X None required.
3. The following final improvement plans shall be submitted to the District for review prior to final
development approval:
X —Grading Plan Storm Drain Plan Final Map
X Street Plan Water&Sewer Plan �Other
4. Availability of drainage facilities:
X a. Permanent drainage service is available provided the developer cat) verify to the
satisfaction of the City of Fresno that runoff can be safely conveyed to the
MasterPlan in
b. The construction of facilities required by Paragraph No. 2 hereof will provide
permanent drainage service.
C. Permanent drainage service will not be available. The District recommends
temporary facilities until permanent service is available.
Temporary service is available through
d. See Exhibit No,2.
5. The proposed development:
Appears to be located within a 1.00 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain
management action.(See attached Floodplain Policy.)
1EIfHA1:ViFV_A 5469 IL OLIVE -11Z SNO,CA 93727 - (559)456.3292- FAX(559)456-3194 Two-sided daeumenr
FRESNO AMI TROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OR REQUIREMENTS
Page 3 of 4
Appears to be located within a 500 year Flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District.
Does not appear to be located within a flood prone area.
6, The subject site contains a portion of a canal or pipeline that is used to manage recharge,
storm water,andlor flood flows.The existing capacity must be preserved as part of site
development.Additionally,site development may not interfere with the ability to operate
and maintain the canal or pipeline.
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
AssociatM with Construction and Industrial Activities(State General Permits)require developers
of construction projects disturbing one or more acres,and discharges associated with industrial
activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)
permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than
storm water to the municipal storm drain system,and meet water quality standards. These
requirements apply both to pollutants generated during construction,and to those which may be
generated by operations at the development after construction.
■
a.
State General Permit for Storm Water Discharges Associated with Construction Activities,
approved August 1999,(modified December 2002.) A State General Construction Permit
is required for all clearing,grading,and disturbances to the ground that result in soil
disturbance of at feast one acre(or less thin one acre if part of a larger common plan of
development or sale). Permittees are requited to:submit a Notice of Intent to be covered
and must pay a permit fee to the State Water Resources Control Board(State Board),
develop and implement a storm water pollution prevention plan,eliminate non-storm
water discharges,conduct routine site inspections,train employees in permit compliance,
and complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April, 1997(available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification(SIC)code, The following categories of industries are
generally required to secure an industrial permit:manufacturing;trucking;recycling;and
waste and hazardous waste management. Specific exemptions exist for manufacturing
activities which occur entirely indoors. Permittees are required to:submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control
Board,develop and implement a storm water pollution prevention plan,eliminate non-
storm water discharges,conduct routine site inspections,train employees in permit
compliance,sample storm water runoff and test it for pollutant indicators,and annually
submit a report to the State Board.
:iwra{teu�nri. 5469 L.WAVE - FRESNO,CA.93727- (559)456.3292 - FAX(59)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
C. The proposed development is encouraged to select and implement startn water qunlity
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines(available at the District Of1=lce)to meet
the requirements of the State General Permits,eliminate the potential for non-storm
water to enter the municipal storm drain system,and where possible minimize contact
With materials which may contaminate storm water runoff.
R. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
10. X See Exhibit No.2 for additional comments,recommendations and requirements.
Gerald E.Lakeman, Project F i ineer: G ry Chapman
District Engineer
C: -
tuw.mansv:.xti 5469 Is.OUVE- FRMNO,CA 93727 - (559)456.3292 -FAX(559)456-3194 Two sided document
N DTZ:
THIS DRAWING IS SCHEMATIC,
DISTANCES ARE APPROXIWE,
HUNTINGTON AVE. = 1 Na
zh„
I JI
TROLLEY CREEK PARK
BASIN "Ya
I
Ili I /
>
4 � �
;
f � i
II 21
III I AIC
NLd
._:, ;.j... . . CUP
2004--018 REV2
1111 1"r-r•r' f k•�}�^"�MOL[
Lf�'-E't.i.'r�.ir;.�I.r.T�UK.::i•r,_a-�,r"c;�: r:
7-
42" 42
rte—�-.--�..-
KINGS CANYON RD.
LEGEND
L EXISTING MASTER PLAN FACILITIES
DIRECTION OF- DRAINAGE 40
SCALE V'= 300'
- -- -- INLET BOUNDARY Iq
NON—DIASTER PLAN F-ACLITIFS
CUP 2004.010 REV2
EXHINT N0. 1 DRAINAGE AREA: "Y"
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
at
a�wsw
%;\RViOi.�b\bW.i7PC%FtlOIS\CiSYCk/!'\YOb4-OIOROWG � kn,
OTHER REQUIREMENTS
EXHIBIT NO. 2
No surface run-off shall be directed towards the District basin,
The District recommends a single fence between the site and the District's basin. The developer
should contact the District so that alternatives to a dual fence can be reviewed. If a fence other than
the existing chain link fence is proposed, District review and approval of the proposed fence is
required.
The District requests that the grading Engineer contact the District as early as possible to review the
proposed site grading for verification and acceptance of grades at our mutual property line prior to
preparing a grading plan.
In an efibrt to improve storm water runoff duality, outdoor storage areas shall be constructed
and maintained such that material which generates contaminants will not be conveyed by runoff
into the storm drain system.
The District encourages,but does not require that roof drains from non-residential development
be constructed such that they are directed onto and through a landscaped grassy swale area to
filter out pollutants from roof runoff.
Runoff from areas where industrial activities, product,or merchandise come into contact with
and may contaminate storm water trust be directed through landscaped areas or otherwise
treated before discharging it off-site or into a storm drain. Roofs covering such areas are
recommended. Cleaning of such areas by sweeping instead of washing is to be required unless
such wash water can be directed to the sanitary sewer system. Stone drains receiving untreated
runoff from such areas that directly connect to the District's system will not be permitted.
Loading docks,depressed areas,and areas servicing or fueling vehicles are specifically subject
to these requirements. The District's policy governing said industrial site NPDES program
requirements are attached.
Development No. CUP 2004-018Rev2
engrlpermillu[iib i[2%riiy-cup1200412004-018revistd2(ge)
or F,Cwy c1r
,;7f �'Ci y.F'• _..�C�` R-A Lam'
-
P1 10K(559)2.33-71 61
rAX(' 0)233-3[227
2907 SOUTH MAPLE AVENUr
SN(),ChI.II-0RNIA 93725-2210
YOu+M.Asl+1.111w-1b&!Resnurce-Water
September 8, 2009
Ms. Bonique Salinas
City of Fresno
Planning & Development Dept.
2600 Fresno StreetT Third Floor
Fresno, CA 93721-3604
RE: Conditional Use Permit C-04-018, N1E Kings Canyon and Adler
FID's Ventura No. 13 Pipeline
Dear Ms. Salinas:
The Fresno Irrigation District(FID) has reviewed the resubmittal of the Conditional Use
Permit No. C-04-018 application filed by CEI Engineering, on behalf of Wal-Mart Stores,
to allow for modifications to an existing Wal-Mart store located at the northeast corner of
East Kings Canyon Road and South Adler Avenue, APN: 463-050-36, 37 and 41, and
has the following comments:
1. FID's Ventura No. 13 pipeline traverses the subject property in an exclusive
easement recorded on March 18, 1993 as Document No.93038659, Official
Records of Fresno County.
2. This pipeline was installed as 21-inch Corrugated Plastic Pipe (CPP)which does
not meet FID's minimum standards for urban areas. FID requires the applicant
replace the existing pipe with new 24-inch diameter ASTM C-361 Rubber
Gasketed Reinforced Concrete Pipe (RGRCP)in accordance with FID standards
and that the applicant enter into an agreement with FID for that purpose.
3. Should the pipeline be placed in a different alignment, FID will require an
additional easement be granted to FID_ The applicant will need to meet with FID
to determine the necessary alignment and width.
BOARD OF ProsideM JE1=FREY G. BOSWF.LL, Vico-Pcnsfdent JEFF NEELY
0IRFOTORS SIEVE BALLS, RYAN JACOBSEN,GEORGE PORTER,GaRonl Manapor GARY R.$ERRATO
Ms. Bonique Salinas
Re: CUP C-04-018
September 8,2009
Page 2 of 2
4. FID requires its easement be shown on the map with proper recording
information, and that FED be made a party to signing all plans which affect its
easements and pipeline facility and Iso be made party to signing the final map.
6. FID requires the applicant submit a grading and drainage plan for FID approval
which shows that the proposed development will not endanger the structural
integrity of the pipeline, or result in drainage patterns that will adversely affect
FID or the applicant. FID also requires it review, approve and be made a party to
signing all improvement plans which affect its property/easements and
canal/pipeline facilities including but not limited to Sewer and Water, FMFCD,
Street, Landscaping, Dry Utilities, and all other utilities.
6. FID does not allow FID owned property or easements to be in common use with
public utility easements but will, in certain instances, allow its property to be in
common use with landscape easements if the City of Fresno enters into an
appropriate agreement with FID. FID requires all block walls and fences be
located outside of its property and easements.
7, FID may have additional comments regarding the subject proposal and suggests
the applicant and or the applicants engineer contact FID at their earliest
convenience.
Thank you for submitting this for our review. We appreciate the opportunity to review
and comment on the subject documents for the proposed project. If you have any
questions please feel free to contact James Shields at 233-7161 extension 319 or
ishields@fresnoirrigation.com.
Sincerely,
William R. Stretch, P.E.
Chief Engineer
Attachment
cc: CEI Engineering, Applicant
G1Apercie55.CilyiCandiCOn51 Use PCfnUi1G-04.010 3Aoc
o
p wlLLow �
u
o ;m WILLOW iF 11
P. -
n
c, z 414
-< O
x
G C
ADL ER g
*,,IItt ADLER
I'� '•\ .tib f �,+: 1\ ���•'•�'r.
'i' i F:A••.:�.IljF a.'�&' I f x
S t 1� O� +oy• +•...f'� �, 'r%�•�_ �+f ff f X�+.✓ `r{
3 t {� d q!,�/�� ♦ .Z'. � h`r / / "lar. Z
{
! I tom ' '`a� ! '• ,a` HELM
fn
•� t t' � 1 KK� A@LpL'' 'ti:
- 1 ea [• ice;.l�a Ilm
ICU
i cin r •-: q° SA[LrY
k •'.! 4 3:
00
o
h
R
UNNAMED i� > -�`'•f.`;
i.aa:�:mxaxw.-.-•mmsr.��.a=es...s�e:�h•-ti;.,�,.:.:�,o-n:-�Wammce+ caa�•:tu,r ....,
� z i� z
R `tR 1 w o i1
I r
PEACH Y
f n T
1 z
m I it
�• i'p�; i I II
�r i It