Loading...
HomeMy WebLinkAboutPM 2007-12 - Conditions of Approval - 5/8/2008 F_c"Y°` REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. VIII.D. COMMISSION MEETING 10-17-07 October 17, 2007 ')_r511ED BY FROM: STAFF, Planning Division Planning and Development Department DEPART NT DIRECTOR SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-07-33, SITE PLAN REVIEW APPLICATION NO. S-07-92, VESTING TENTATIVE PARCEL MAP NO. 2007-12 AND ENVIRONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO. R-07-33/S-07-92/TPM-2007-12 EXECUTIVE SUMMARY BMY Construction Group, The Vernal Group and Rabe Engineering, Inc., on behalf of Richard and Marian Holm, property owners, have filed Rezone Application No. R-07-33, Site Plan Review Application No. S-07-92 and Vesting Tentative Parcel Map No. 2007-12 pertaining to approximately 2.01 acres of property located on the southeast corner of the intersection of East Ashlan and North Barton Avenues. Rezone Application No. R-07-33 proposes to rezone the subject property from the M-1/cz (Light Manufacturing/with conditions of zoning) zone district to the M-1/cz (Light Manufacturing/with modified conditions of zoning) zone district. The subject property is planned for light industrial land uses. Vesting Tentative Parcel Map No. 2007-12 and Site Plan Review Application No. S-07-92 propose a four-lot integrated industrial development on the subject property comprised of an 8,178 square-foot Abby animal hospital and shelter; and, 16,469 square feet of shell industrial building space within three buildings proposed for future office, warehouse, and retail purposes. According to the land use consistency table adopted with the 2025 Fresno General Plan (and applied within all community plans), the M-1 (Light Manufacturing) zone district is consistent with the light industrial planned land use for the subject property as designated by the Fresno Yosemite International Airport and Environs Plan, McLane Community Plan and 2025 Fresno General Plan. The applications would bring the subject property into conformance with the 2025 Fresno General Plan and the McLane Community Plan and Fresno Yosemite International Airport and Environs Plan. PROJECT INFORMATION PROJECT Rezone Application No. R-07-33, Site Plan Review Application No. S-07- 92 and Vesting Tentative Parcel Map No. 2007-12 propose to develop a four-lot integrated industrial development on the subject property comprised of an 8,178 square-foot Abby animal hospital and shelter; and, 16,469 square feet of shell industrial building space within three buildings proposed for future office, warehouse, and retail purposes. APPLICANT BMY Construction Group, The Vernal Group and Rabe Engineering, Inc. LOCATION Southeast corner of the intersection of East Ashlan and North Barton Avenues (Council District 4, Councilmember Westerlund) SITE SIZE 2.01 acres LAND USE Existing - Vacant Proposed - Light Industrial REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 2 ZONING Existing - M-1/cz (Light Manufacturing/with conditions of zoning) Proposed - M-1/cz (Light Manufacturing/with modified conditions of zoning) PLAN DESIGNATION The proposed M-1 zone district designation is consistent with the 2025 AND CONSISTENCY Fresno General Plan, the McLane Community Plan and Fresno Yosemite International Airport and Environs Plan planned land use designation of light industrial pursuant to Section 12-403-13-1 of the Fresno Municipal Code. ENVIRONMENTAL FINDING Mitigated Negative Declaration issued on July 30, 2007 PLAN COMMITTEE The Central Eastern Implementation Committee recommended RECOMMENDATION approval of the rezone, site plan review and vesting tentative parcel map applications at its meeting on June 18, 2007. STAFF RECOMMENDATION Recommend approval to City Council of Rezone Application No. R-07-33 subject to the recommended and modified conditions of zoning; and, approve Site Plan Review Application No. S-07-92 and Vesting Tentative Parcel Map No. 2007-12 subject to compliance with the Conditions of Approval dated October 17, 2007. BORDERING PROPERTY INFORMATION Planned Land Use Existing Zoning Existing Land Use North R-1-A Open Space/Ponding Basin Open Space/Ponding Basin Single Family Residential District South M-1/cz Light Industrial Light Manufacturing District/with conditions of Light Industrial zoning East M-1/az Light Industrial Light Manufacturing District/with conditions of Mini Storage zoning West M-1/cz& R-1 Light Industrial & Medium Density Post Office Residential Light Manufacturing District/with conditions of zoning& Single Family Residential District ENVIRONMENTAL FINDING Staff has reviewed the above-referenced project proposal and consulted with affected agencies and interest groups. The proposed project has been evaluated with respect to the provisions of the adopted 2025 Fresno General Plan (City Council Resolution No. 2002-379) and the corresponding potential adverse environmental impacts, adopted environmental impact mitigation measures and determinations of overriding considerations established by the certification of the related Master Environmental Impact Report (MEIR) No. 10130 (City Council Resolution No. 2002-378). The proposed project has been determined to not be fully within the scope of MEIR No. 10130 as provided by the California REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 3 Environmental Quality Act (CEQA), and as codified in the Public Resources Code (PRC) Section 21157.1(d) and the CEQA Guidelines Section 15177(c). Based upon an analysis of the project, as summarized in the attached environmental assessment initial study, it has been determined that the project may contribute to the creation of certain moderate environmental effects or the project may be adversely impacted by existing conditions. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project, together with project specific mitigation measures necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). Therefore, it has been determined that the filing of a mitigated negative declaration is appropriate in accordance with the provisions of California Environmental Quality Act (CEQA) Section 21157.5(a)(2) and CEQA Guidelines Section 15178(b)(1) and (2). Master Environmental Impact Report No. 10130 examined the potential adverse environmental impacts of implementation of the 2025 Fresno General Plan, which provides plans and policies to accommodate projected population and employment growth through the year 2025. The City of Fresno has determined that specific economic, legal, social, technological and other considerations related to the implementation of the 2025 General Plan outweigh the unavoidable adverse environmental effects identified in the Final MEIR, including any effects not mitigated because of the infeasibility of mitigation measures and that the identified adverse environmental effects are considered acceptable. This environmental finding was properly published on July 30, 2007, with no comments received to date. BACKGROUND/ANALYSIS BMY Construction Group, The Vernal Group and Rabe Engineering, Inc., on behalf of Richard and Marian Holm, property owners, have filed Rezone Application No. R-07-33, Site Plan Review Application No. S-07-92 and Vesting Tentative Parcel Map No. 2007-12 pertaining to approximately 2.01 acres of property located on the southeast corner of the intersection of East Ashlan and North Barton Avenues. Rezone Application No. R-07-33 proposes to rezone the subject property from the M-1/cz (Light Manufacturing/with conditions of zoning) zone district to the M-1/cz (Light Manufacturing/with modified conditions of zoning) zone district. The subject property is planned for light industrial land uses. Vesting Tentative Parcel Map No. 2007-12 and Site Plan Review Application No. S-07-92 propose a four-lot integrated industrial development on the subject property comprised of an 8,178 square-foot Abby animal hospital and shelter; and, 16,469 square feet of shell industrial building space within three buildings proposed for future office, warehouse, and retail purposes. According to the land use consistency table adopted with the 2025 Fresno General Plan (and applied within all community plans), and Section 12-403-B-1 of the Fresno Municipal Code, the M-1 (Light Manufacturing) zone district is consistent with the light industrial planned land use for the subject property as designated by the Fresno Yosemite International Airport and Environs Plan, McLane Community Plan and 2025 Fresno General Plan. The subject property is currently developed with one single family residence which is proposed to be demolished. Property to the north and across East Ashlan Avenue has been developed for multi-use open space and ponding (basin). Property to the east (between the subject property and SR 168) has been developed with a Derrel's Mini Storage. Property to the south has been developed with an industrial warehouse building and is currently being used for light industrial uses. Property to the east has been developed with a post office and single family residences. A 20-foot wide Public Utility Easement traverses the northern portion of the subject property in an east/west direction. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 4 Plans and Policies The 2025 Fresno General Plan, McLane Community Plan, and Fresno Yosemite International Airport and Environs Plan designate the subject property for development with light industrial planned land uses. According to the land use consistency table adopted with the 2025 Fresno General Plan (and applied within all community plans), the proposed M-1 (Light Manufacturing) zone district may be found to be consistent with the light industrial planned land use designation. Objective C-13 of the 2025 Fresno General Plan states that the city should plan and support industrial development to promote job growth while enhancing Fresno's urban environment. Policy No. C-1 3-a of the 2025 Fresno General Plan supports this objective by recommending that the City plan for unified, high-quality, geographically dispersed business and industrial park sites that are of sufficient size, unified in design, and diversified in activity to attract the full range of business types and supporting uses necessary to provide needed economic and employment opportunities. Furthermore, Policy No. C-13-d states that the City plan industrial land that lies in close proximity to residential areas for the least intense categories of industrial activity. The subject property is located within the Approach Protection Zone III (APZ III) of the Fresno Yosemite International Airport (FYI) and Environs Plan. Policy I-7-f of the 2025 Fresno General Plan states that land uses within the boundaries of the FYI plan shall be governed by the designations and policies specified in adopted airport facility plans. Policy 1-7-a provides for the application of appropriate land use controls as set forth in adopted airport plans and the limitation of urban encroachment in order to support the continued viability of flight operations at Fresno's airports; and, to protect pubic safety, health, and general welfare. Policy 1-7-e further states that the policies of adopted city airport environs and specific plans pertaining to noise, safety, airspace protection, avigation easements, and buyer notification will be applicable to land within the review area boundaries of pubic use airports. Pursuant to Policy 3.c (2) of the FYI Airport and Environs Plan, Table E-2 "Airport/Land Use Safety Compatibility Criteria" sets forth criteria which shall be used to evaluate whether a land use is acceptable with respect to its Airport proximity. Within APZs II and IV, development of vacant property or redevelopment of property in accordance with the zoning regulations in effect prior to February 20, 1987 shall not be prohibited on the basis of the restrictions set forth in Table E-2. While the provision shall not apply to conditional use permits for schools, hospitals, nursing homes, churches, auditoriums, concert halls, amphitheaters or other uses that would result in a large concentration of people, development of the subject property with the potential uses proposed (i.e. an animal hospital and shelter, undetermined general office, retail and/or warehouse-storage) is not subject to a conditional use permit. It should be noted that while development of the subject property with the uses proposed may be found to be acceptable, the consistency requirements of the FYI Airport and Environs Plan require that rezoning applications shall be referred to the Airport Land Use Commission (ALUC) for review. The powers and duties of the ALUC include assisting local agencies in ensuring compatible land use in the vicinity of all existing airports in order to provide for the orderly development of the area while at the same time protecting the public health, safety and welfare. Due to the number of adopted policies within the 2025 Fresno General Plan and FYI Airport and Environs Plan (and conditions of zoning on the subject property) related to airport safety and the recommendations of the California Airport Land Use Planning Handbook (2002) relative to the assessed REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 5 risks which may be assigned to property based upon the intensity, scale, and proximity of development in relation to airport protection zones, it is prudent for the City to implement mitigation measures (through the designation of zoning conditions) aimed at reducing risks through the restriction or limitation of particular uses and activities which would attract or concentrate a large number of people on the subject property. Base on the applicability of adopted development standards, plan policies/implementation measures and applicable mitigation measures referenced above, and with consideration of the relationship of the proposed land uses on the subject property and their proximity to the FYI Airport, it is concluded that the proposed development of the subject property will further promote job growth while enhancing and achieving the planned urban environment through the provision of a unified, high quality, business park with sufficient diversification in activity to attract a full range of business types and supporting uses necessary to provide needed economic and employment opportunities at an intensity and scale which will be compatible with nearby residential areas. Public Resources The Public Utilities Department has determined that adequate sanitary sewer and water services are available to serve the project subject to the construction and installation of public facilities and infrastructure in accordance with Department of Public Works standards, specifications and policies and the provision of two independent sources of water, meeting Federal and State Drinking Water Act Standards. The City of Fresno Fire Department has conditioned the proposed project with requirements for installation of fire hydrants and the provision of adequate fire flows per Public Works Standards, also with two sources water. Implementation of the 2025 Fresno General Plan policies, mitigation measures of Master Environmental Impact Report No. 10130 and the Water Resources Management Plan will provide an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent drainage service will be available for the development provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). Amendments or modifications to the FMFCD requirements will be required to be approved by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code, prior to approval of the final map. Circulation, Streets and Access Points The Public Works Department Transportation Planning Section has reviewed the rezone, conditional use permit and vesting tentative tract map applications and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic generated, subject to the dedication and improvement of adjacent portions of East Ashlan and North Barton Avenues. The project proposes on access point from East Ashlan Avenue and one access point from North Barton Avenue. In the 2025 Fresno General Plan Circulation Element, East Ashlan Avenue is designated as a four-lane arterial and North Barton Avenue is designated as a 64 to 72-foot wide local street. The project will be required to construct all necessary street and frontage improvements to City REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 6 Standards. Right-of-way dedications and/or vacations will also be required where needed to provide for the necessary improvements. The developer of this project, in accordance with the mitigation measures of the Master Environmental Impact Report (No. 10130) which was certified by the Council with the adoption of 'the 2025 Fresno General Plan, will be required to pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The project will also be responsible for payment of applicable City-wide regional street impact fees. California Department of Transportation (Caltrans) The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Regulations submitted no comments within its memorandum dated June 05, 2007. Therefore, Caltrans is not requiring any mitigation for this project's impacts. Staff considered Caltrans' letter in preparing the initial study and determined that the project does not create any impacts, including cumulative impacts that were not identified in MSIR No. 10130. Landscaping/Walls Given that the subject property is located adjacent to existing residential development within the boundaries of the McLane Community Plan, the development will be required (as a condition of zoning) to install landscaping within minimum 15-foot wide buffer strips along the East Ashlan and North Barton Avenue frontages in accordance with the requirements of the Fresno Municipal Code. Central Eastern Implementation Committee The Central Eastern Implementation Committee unanimously recommended approval of the rezone, site plan review and vesting tentative parcel map applications at its meeting held on June 18, 2007. Airport Land Use Commission At its regular meeting held on October 01, 2007, the Fresno County Airport Land Use Commission (ALUC) determined that the proposed rezone application is consistent with the ALUC's Fresno Air Terminal Land Use Policy Plan subject to the conditions incorporated into the recommended Avigation Easement and Agreement and by limiting future uses as outlined within the Conditions of Zoning recommended by staff to be attached to the subject property. These recommended Conditions of Zoning are listed below and included within the Conditions of Approval for Site Plan Review Application No. S-07-92 and Vesting Tentative Parcel Map No. 2007-12, which are attached to this report. The ALUC's determination was based on their conclusion that the rezone application proposing to modify the conditions of zoning on the subject property is appropriate based on the industrial compatibility related to the site's location to the Fresno Yosemite International Airport. Conditions of Zoning Staff recommends the following conditions of zoning be established by Rezone Application No. R-07-33 as applicable to the subject property: REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 7 1 . A minimum 15-foot building setback shall be required for the project site along its North Barton Avenue frontage. 2. A minimum 15-foot landscaped area shall be provided along North Barton Avenue. 3. A General Nuisance/Avigation Easement is required to be dedicated to the City of Fresno and shall include the following conditions: Conditions related to the enforcement of adopted noise criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan: • General manufacturing, utilities, extractive industry, transportation, public parking, cemeteries, service commercial, wholesale trade, warehousing, light industrial, golf courses, riding stables, water recreation, offices, retail trade, livestock breeding, parks, playgrounds, zoos, and outdoor spectator sports uses shall have interior noise levels reduced by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low • Single-family detached and duplex residential development, multi-family residential development and transient lodging, mobile homes, schools, libraries, hospitals, nursing homes, churches, auditoriums, concert halls, and amphitheaters shall be prohibited. Conditions related to adopted airspace protection criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan • All structures and trees shall be limited to the 50-foot maximum height requirement of the proposed M-1 (Light Manufacturing) zone district and imposed by Federal Aviation Regulations (FAR). • All structures and trees shall comply with the FAR Part 77 regulations for the approach surface, for any exceptions to the 50-foot height limitation considered by the City Planning Commission. • Allow ongoing ingress and egress for the purpose of removing, marking or lighting objects, including trees, which may penetrate any surface as described under FAR Part 77. Conditions related to adopted safety criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan • On-site improvements and uses such as distracting lights or glare, sources of smoke or electronic interference, and uses that attract birds shall be prohibited. • Uses that concentrate occupants with limited mobility such as schools, large day-care centers, hospitals, nursing homes, or similar uses shall be prohibited. • Industrial/Manufacturing uses such as petroleum bulk plants shall be prohibited. • Commercial/Retail Trade uses having moderate or higher usage intensities such as major shopping centers, theaters, meeting halls and buildings with more than three aboveground habitable floors shall be prohibited. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 8 • Restaurant development shall be limited to one, 4,000 square-foot maximum, restaurant. • Public and Quasi-Public Services such as solid waste transfer stations shall be prohibited. 4. The Western Regional Office of the Federal Aviation Administration encourages the filing of an FAA Form 7460-1, Notice of the Proposed Construction or Alteration in conjunction with the permitting of projects in the area of an airport to ensure compliance with Part 77 of the Federal Aviation Regulations (FAR). 5. In accordance with FAR 77, Subpart C and Airspace Protection Policies of the Fresno Air Terminal Land Use Compatibility Plan the following must be met: • No Structure, tree or other object shall be permitted to exceed the height limits established in accordance with Part 77, Subpart C, of the Federal Aviation Regulations (FAR). This criterion applies unless, in the case of a proposed object or growing tree, one or more of the following conditions exist: The object would be substantially shielded by existing permanent structures or terrain in a manner such that it clearly would not affect the safety of air navigation; The FAA has conducted an aeronautical study and either determined that-the object would not result in a hazard to air navigation or made recommendations for the object's proper marking and lighting as an obstruction; The object is otherwise exempted from the requirements of FAR Part 77. IN the case of an existing object, this criterion also applies unless the object exceeded the prescribed height limits prior to February 20, 1987, in which case, marking lighting will still be required. • No object shall be permitted to be erected which because of height or other factors would result in an increase in the minimum ceiling or visibility criteria for an existing or proposed instrument approach procedure. • Civil Airport Imaginary Surfaces described as Code of Federal Regulations Title 14, Part 77, Subpart C "Obstruction Standards," shall be used in conjunction with the above airspace conditions to determine whether the height of an object is acceptable. Tentative Parcel Map Findings The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. 1. The proposed parcel map, together with its design and improvements, is consistent with the City's 2025 Fresno General Plan, McLane Community Plan and Fresno Yosemite International Airport and Environs Plan which designate the site for light industrial land uses which is consistent with the M-1 Jcz (Light Manufacturing/with conditions of zoning) zone district. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 9 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because of the urbanized nature of the area in which the site is located. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will ensure that the subdivision conforms to city health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. The tentative parcel map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance except as modified in accordance with Planned Development allowances. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. Action by the Planning Commission regarding the rezone application will be a recommendation to the City Council. The Planning Commission's actions on the proposed site plan review application and vesting tentative parcel map are final unless appealed in accordance with the Fresno Municipal Code, Section 12-406-I. CONCLUSION/ RECOMMENDATION 1. RECOMMEND APPROVAL to the City Council of the environmental finding of a Mitigated Negative Declaration for Environmental Assessment No. R-07-33/S-07-92/TPM-2007-12, dated July 30, 2007. 2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-07-33 to change the existing zone district designation from the M-1/cz (Light Manufacturing/with conditions of zoning) zone district to the M-1/cz (Light Manufacturing/with modified conditions of zoning) zone district. 3. RECOMMEND APPROVAL of Vesting Tentative Parcel Map No. 2007-12 subject to compliance with the Conditions of Approval dated October 17, 2007. 4. RECOMMEND APPROVAL of Site Plan Review Application No. S-07-92 subject to compliance with the Conditions of Approval October 17, 2007. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-07-33 Site Plan Review Application No. S-07-92 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 10 Attachments: Vicinity Map Aerial Photograph Exhibits "A," "E1," "E2," "E3" & "E4" of Site Plan Review Application No. S-07-92 dated May 16, 2007 Vesting Tentative Parcel Map No. 2007-12 dated June 06, 2007 Conditions of Approval for Site Plan Review Application No. S-07-92, dated October 17, 2007, including memoranda from responsible or commenting agencies. Conditions of Approval for Vesting Tentative Parcel Map No. 2007-12, dated October 17, 2007, including memoranda from responsible or commenting agencies. Environmental Assessment No. R-07-33/S-07-92/TPM-2007-12, Mitigated Negative Declaration dated July 30, 2007. orct-zaz(ess)xYa czu-tsz(092) -�-� Mce YO Ucau 'ans AVYL.YD'N Tzoz ONS38-4 30 kL10 MOA9ANN8&M/MMZMNZ'ONO {Yff '7V'143Zt—Loot 'ON o db'W UJ(Wd 3AIIVLN31 •••a no/Le .oia...0 •wa •n � QQ m ER iv/ o 7yy0 l[ GG R e o a a � € �o �n sq < Pit 0 6$ zMitt N1 cdn II I LI i I '�1 lam( .: N ti n u n� ae o � � F3 �S ••1 �S C ; i $l Allx � 9 �iS { �".• � g I �� m 1 srza/ L'N,N��'/N/n Hl NON Y8'S � 9$j7� 50 ez , U cqp U '9f 6e 111 1 V, d No" . S 888888 c� Id ` ',ali R j 8� W F N I yy� ,� a a a ` � 1 - m� m�.o•�ri ,rs L--.cc J � 4 \ lr-l7 Pio rN —r�oN33sa� r° �m !"SnA InV JNIOIB 7Nusf)G W m0 D $ 1 (� miO a I I o z W W — b l 15,00 N SONlNYiB 30 SI568 — — ,BI I t+ �� _ nu�nY.SIlYosxt�H HJ,tiO L ._ —M-1— —M rl M 00 - - M o N L'YIS M-IS,00. N • z i 4 tv ���• 3 i �` RICHERT o 0 Q m SWIFT R-1-A AUSTIN ASHLAN ,lb M-1F T-1 Z O H R- � Q m BUCKINGHAM M1 HAMPTON R-A R-A C-R R-A LEGEND ® Subject Property VICINITY MA" PLANNING & DEVELOPMENT N DEPARTMENT REZONE APPLICATION NO. R-07-033 A.P.N.: 438-021-09-21 From M-1-CZ to M-1 ZONE MAP: 2052 4166 N. BARTON AVE. NOT TO SCALE BY/DATE: D N / 6-13-07 .�tN ''.•.i y. ��4 r 7 f 1 � �., �� i�l� x���� tib �.�Y� X t � •f4 tt :k+ h I '1'- xS t' ?�-{:r7�k ...rte `k'I �• - '-•.f 7 - _ - Q • 4 - ` � td a 771 1.7 CO 7. cm c r zl gos f 9 n »¢ Of Av asera� :r f4, t err i MW Y l •-'h' rt - - __ _ I � � - 'ice' $ v •�#} � I � r ! c _ice r`�t- �`+ �`�.,v.�y�{�^�'�p j y r s Ilk Ou �!�r '� i •� i q,�C � 7 1 I� Q � �'t E z� r> .r! S"6-CCL(6ss)3w-16ZCGvD,Ln.wx-emLr:l'N V.I z V N U 9 A i6 iii llxpd•oft6-iii 1659:qd•OU26 vD,ousoki,I oeg M,,Ljs-3 ss 0 *-m pue anu3ARPN 18 ,-o Ew 0 r. 3j zz o a a < U N rf L f1 �-�At ca ji Ila L ca IRE II.......... Fq— El lip 13 90 01 41, —I L/ ul 00 c !I ji1 ! '� iia i{� Ori! i ,i Ii=i :1 }r iiili {{yy {�� 0 (tif 0[4 in1 s87irba o c cccSIA�'ou •�oex Maus a ss l d CIO UO �I d,J M 3 n 3 H j_ wao-IfioiSpueay�oN! wm-dro�8munn�,ww..�IMwey pue Onurnppry . s i �m is CL r� C 5 p I lu 44 all Is I I f� 1j JJ I I�� IIS co Lt ?Cr Jz CE� W i 0. O O Q .fs — 07 ------------- 1 1 I I I I �f I -i.i • ® .l 1 1 6 I I I I I I ti s ,I r u I - i."s'f 711" r. �14- L+"I"I-V"" m zzz lsss mCeoer'e iz icss ;oic v�'rnn ioer Megs'a ss� d CI O IA D "I V N M 3 n 3 i Z lll�l•('b10-0 ll2M�U�?IIL'w 7 Iu0]df,Ofd�@l1pA•µNM. -=lF4MV if �j la n3 s` 2° — r I x Y 1; � ° c n m o jl I I li li I I III m w w _ m IL c ' m a o` 0 m .5 m , , , , f 0 oa LL e I ��.e.wm�....y..x.qy��^+xl p.�......rx i"^4 s—ra 9f�- *�.ev..r'f""-�>•�+ �.�w.p r.,..s•�� . zGSSI lid 16ZE:fJ VO'-9ftlA'2-PU3'N C I C 39st Q l 0 —IV 1',IM 3 A 3'+-L M. cu �I�Il�j�i si.,' �;o � �o�� � a I T loo WO cu :CPoj LC!r 12; Dc O 13- y446-6Y:L(6551'W-16ZC6 VO'e"IA'l'IID�•N EI Z Tl Q du�3A 3H -V6-Z,7(6SSI:1C�1'ONt6•ZZZ 16SS1:4A•OI L66 V7'OUSW:l•IOU MnIS 3'.51 u l � Wm' M eM�1R1'�7'IW�'tlnoi3ryluan'M,ww�4ulweld Pm ampolM1PN O I n2 p ml c 'g U3 c � . m LSI J c p �� I I _ e_ O - W - S z a 'o IOU m m m L C LU lLo �i Lij 4 O O LL 0 r A •2 r 1 1 I 1 1 1 1 1 1 1 1 i —1-M 10951 X1d CLaL-ZSa(0S9) l�6Z-SU rl Isece noxmrt -nem arauv° x 1a°a ONS3d3 30 .WO o m1°.�anntle am/a®umu wra I Atl1 e I EI—LOOZ 'ON g dVN 733dVd 3AUVIN31 _�g CD PE g, IIn a I� II i ij 112 NN N CJ 'N MR i 1 8 7� I NN u 12:1 wo c� L u 12 A11 911 Mao 0 i b 9 ry MT a M FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 12743 The Fresno City Planning Commission at its regular meeting on October 17, 2007, adopted the following resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and the Municipal Code of the City of Fresno. WHEREAS, Vesting Tentative Parcel Map No. 2007-12 was filed with the City of Fresno and proposes to subdivide the approximately 2.01 acre subject property, which is located on the southeast corner of the intersection of East Ashlan and North Barton Avenues, for the purpose of a four-lot industrial planned development ; and, WHEREAS, on June 18, 2007, the Central Eastern Implementation Committee recommended approval of the parcel map and related rezone and site plan review applications; and, WHEREAS, the Planning and Development Department staff recommended approval of the proposed project subject to all conditions of approval contained in the staff report dated October 17, 2007; and, WHEREAS, at that same hearing the Commission reviewed related Rezone Application No. R- 07-33 proposing to reclassify the subject site from the M-1/cz (Light Manufacturing with conditions of zoning) zone district to the M-1/cz (Light Manufacturing/with conditions of zoning) zone district; and, WHEREAS, the Fresno City Planning Commission conducted a public hearing on October 17 2007, to review the proposed subdivision and considered the staff report and invited testimony with respect to the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Vesting Tentative Parcel Map No. 2007-12 may have a significant effect on the environment as identified by the Mitigated Negative Declaration prepared for Environmental Assessment No. R-07-33/S-07-92(TPM-2007-12 dated July 30, 2007, BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of the subject vesting tentative parcel map is consistent with the adopted 2025 Fresno General Plan, McLane Community Plan, Fresno Yosemite International Airport and Environs Plan, and the findings required pursuant to Section 66410 et. seq. of the Government Code. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Vesting Tentative Parcel Map No. 2007-12 subject to the Planning and Development Department Conditions of Approval dated October 17, 2007. The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner Cherry, seconded by Commissioner Kissler. Planning Commission Resolution No. 12743 Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 2 VOTING: Ayes - Cherry, DiBuduo, Holt, Kissler, Torossian, Vang, Vasquez Noes - None Not Voting - None Absent - None DATED: October 17, 2007 KEITH BERGTHOLD, Secretary Fresno City Planning Commission Resolution No. 12743 Vesting Tentative Parcel Map No. 2007-12 Filed by Rabe Engineering, Inc., on behalf of Richard and Marian Holm Action: Approved CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL OCTOBER 17, 2007 VESTING TENTATIVE PARCEL MAP No. 2007-12 Southeast corner of the intersection of East Ashlan and North Barton Avenues NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §§66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. Upon conditional approval of Vesting Tentative Parcel Map No. 2007-12, dated June 06, 2007, the subdivider may prepare a Final Parcel Map in accordance with the approved tentative map. Note that a final parcel map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 12-1207 of the FMC, the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 12-1207.2 of the FMC. Concurrent with the filing of a final map and when the provisions of Section 66436 of the Subdivision Map Act apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed final map, together with a copy of SMA Section 66436(a)(3)(A), to any public entity or public utility which has previously acquired a right-of-way easement. LEGAL STATUS OF SITE TO BE SUBDIVIDED 1. The parcel map site was legally created as: Parcel A of Lot Line Adjustment No. 2002-11 in the City of Fresno, County of Fresno, State of California, as evidenced by a Grant Deed recorded June 24, 2002, Instrument 2002- 0103822 of Official Records, in the Office of the County Recorder of said county and being more particularly described as follows: Together with Parcel B of Parcel Map No. 85-03, in the City of Fresno, County of Fresno, State of California, according to the map thereof recorded in Book 46, Pages 72 and 73 of Parcel Maps, in the Office of the County Recorder of said county. Excepting the south 136.00 feet of Parcel B of Parcel Map No. 85-03 Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 2 PLAN CONSISTENCY 2. The subject site is located within the jurisdiction of the Fresno Yosemite International Airport and Environs Plan, McLane Community Plan and the 2025 Fresno General Plan. The McLane Community Plan and the 2025 Fresno General Plan designate the parcel map for development with light industrial planned land uses. The Fresno Yosemite International Airport and Environs Plan defers designated planned land uses to the underlying community and general plans. However, the Fresno Yosemite International Airport and Environs Plan regulates uses and restricts the height of structures within its plan area. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and applied within all community plans the existing M-1/cz (Light Manufacturing/with conditions of zoning) zone district is consistent with the light industrial planned land use for the subject property as designated by the McLane Community Plan and 2025 Fresno General Plan. ZONING 3. Comply with the provisions of the State of California Government Code Sections §66410 - §66499.58 SMA and the City FMC Chapter 12, Article 10 (Subdivision of Real Property). 4. Proposed Parcels "A", "B", "C" and "D" are consistent with the M-1 zone district. CONDITIONS OF ZONING 5. The following conditions of zoning established by Rezone Application No. R-07-033 are applicable to the subject property: a) A minimum 15-foot building setback shall be required for the project site along its North Barton Avenue frontage. b) A minimum 15-foot landscaped area shall be provided along North Barton Avenue. General Nuisance/Avication Easement c) A General Nuisance/Avigation Easement is required to be dedicated to the City of Fresno and shall include the following conditions: Conditions related to the enforcement of adopted noise criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan: i) General manufacturing, utilities, extractive industry, 'transportation, public parking, cemeteries, service commercial, wholesale trade, warehousing, light industrial, golf courses, riding stables, water recreation, offices, retail trade, livestock breeding, parks, playgrounds, zoos, and outdoor spectator sports uses Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 3 shall have interior noise levels reduced by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low ii) Single-family detached and duplex residential development, multi-family residential development and transient lodging, mobile homes, schools, libraries, hospitals, nursing homes, churches, auditoriums, concert halls, and amphitheaters shall be prohibited. Conditions related to adopted airspace protection criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan iii) All structures and trees shall be limited to the 50-foot maximum height requirement of the proposed M-1 (Light Manufacturing) zone district and imposed by Federal Aviation Regulations (FAR). iv) All structures and trees shall comply with the FAR Part 77 regulations for the approach surface, for any exceptions to the 50-foot height limitation considered by-the City Planning Commission. v) Allow ongoing ingress and egress for the purpose of removing, marking or lighting objects, including trees, which may penetrate any surface as described under FAR Part 77. Conditions related to adopted safety criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan vi) On-site improvements and uses such as distracting lights or glare, sources of smoke or electronic interference, and uses that attract birds shall be prohibited. vii) Uses that concentrate occupants with limited mobility such as schools, large day- care centers, hospitals, nursing homes, or similar uses shall be prohibited. viii)Industrial/Manufacturing uses such as petroleum bulk plants shall be prohibited. ix) Commercial/Retail Trade uses having moderate or higher usage intensities such as major shopping centers, theaters, meeting halls and buildings with more than three aboveground habitable floors shall be prohibited. x) Restaurant development shall be limited to one, 4,000 square-foot maximum, restaurant. xi) Public and Quasi-Public Services such as solid waste transfer stations shall be prohibited. d) The Western Regional Office of the Federal Aviation Administration encourages the Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 4 filing of an FAA Form 7460-1, Notice of the Proposed Construction or Alteration in conjunction with the permitting of projects in the area of an airport to ensure compliance with Part 77 of the Federal Aviation Regulations (FAR). e) In accordance with FAR 77, Subpart C and Airspace Protection Policies of the Fresno Air Terminal Land Use Compatibility Plan the following must be met: i) No Structure, tree or other object shall be permitted to exceed the height limits established in accordance with Part 77, Subpart C, of the Federal Aviation Regulations (FAR). This criterion applies unless, in the case of a proposed object or growing tree, one or more of the following conditions exist: • The object would be substantially shielded by existing permanent structures or terrain in a manner such that it clearly would not affect the safety of air navigation; • The FAA has conducted an aeronautical study and either determined that the object would not result in a hazard to air navigation or made recommendations for the object's proper marking and lighting as an obstruction; • The object is otherwise exempted from the requirements of FAR Part 77. IN the case of an existing object, this criterion also applies unless the object exceeded the prescribed height limits prior to February 20, 1987, in which case, marking lighting will still be required. ii) No object shall be permitted to be erected which because of height or other factors would result in an increase in the minimum ceiling or visibility criteria for an existing or proposed instrument approach procedure. iii) Civil Airport Imaginary Surfaces described as Code of Federal Regulations Title 14, Part 77, Subpart C "Obstruction Standards," shall be used in conjunction with the above airspace conditions to determine whether the height of an object is acceptable. MODIFICATIONS TO PROPERTY DEVELOPMENT STANDARDS 6. Proposed parcels must be consistent with -the existing M-1/cz (Light manufacturing with conditions of zoning) zone district in terms of lot depth and area subject to approval of a special permit for a planned development project. All parcels must provide access to a public street right-of-way under a planned development special permit. 7. Site Plan Review Application No. S-07-92 shall be approved prior to recordation of the Parcel map and shall include the property lines as proposed pursuant to Tentative Parcel Map No. 2007-12, dated June 06, 2007 thereby authorizing the creation of the industrial planned development. Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 5 8. Submit draft copies of Covenants, Conditions and Restrictions/Owners Association documents (CC & R's) for review and approval. Final, executed and notarized document are to be located with the parcel map. CC & R's shall conform with the provisions of Section 12-1026 of the Fresno Municipal Code and address ingress, egress, sewer and water service maintenance and access, fire protection, solid waste service, storm drainage, parking and landscaping as follows: a) Cross Access for ingress/egress b) Cross Drainage c) Covenant for Shared Parking d) Covenant to maintain sewer, water and all other utilities e) Covenant for fire protection underground water supplies and Covenant to access buildings f) Covenant to maintain all landscaping within the limits of this map g) Covenant for shared solid waste facilities h) Provide Covenant Agreement for access to land locked parcels i) Provide Covenant Agreement for maintenance of fire suppression water system j) Covenant for emergency access 9. The placement of a parcel line in close proximity to any existing and/or proposed structures requires that the structure be found in compliance with the fire resistive standards of the Uniformed Building Code, Chapter 5. In the event the structures do not comply they must be modified so as to meet the requirement. 10. The proposed structure(s) on the site may be affected due to the location of the proposed parcel lines. Compliance with the prevailing Uniform Building Code as it relates to exterior wall protection, allowable area, etc. (as applicable to new parcel line locations) must be demonstrated prior to final map submittal. Contact the Planning and Development Department, Building and Safety Services Division at (559) 621-8200. GENERAL CONDITIONS 11. All off-site and public improvements shall be constructed in accordance with the Public Works Department Standards, Specifications and Policies. Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. 12. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants, poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction with the construction of these off-site improvement requirements, shall be the responsibility and at the expense of the subdivider. 13. Underground all existing off-site overhead utilities within the limits of this map in Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 6 accordance with the provisions of Section 12-1011, and Section 8-801 of the FMC, Resolution No. 78-522/88-229, and the policies of the Public Works Department. 14. When street/safety lighting installations are required, street lighting plans shall be submitted for review and approval by the Traffic Engineer prior to the issuance of permits for the work. Services to street lighting installations shall be separated from the electrical service(s) serving the development. The type, location and service for street lighting installations shall be as determined by the Traffic Engineer. Street lighting installations shall be dedicated to the City upon completion and acceptance of the installations. 15. Sidewalks (including wheelchair ramp landings) and driveway approaches, for undeveloped parcels of this parcel map, shall be required and constructed at the time of site development. a) Curb Ramps are required at all. corners within the limits of this parcel map. 16. Whenever covenants or agreements are required, they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and agreements must be approved by the City Attorney's Office and shall be recorded with the final parcel map. 17. Telephone, cable, and other public utilities which propose above-ground facilities (such as cabinets) determined by the Planning and Development Director to be oversized shall be located in an additional easement area outside of the required landscape strip. 18. All work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution No. 70-36 and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the Public Works Standards. 19. The subdivider shall dedicate and construct public easements to facilitate the construction of curbs, gutters, sidewalks with street tree wells and irrigation systems (when applicable), permanent pavement, street/safety lighting, bus bays, right turn lanes, bike lanes, bike paths, multi-purpose trail, wheelchair ramps and public utilities in accordance with City plans, ordinances, resolutions and policies, and the Standard Specifications of the Public Works Department within the limits of the parcel map. 20. Existing improvements that are not to the planned alignment shall be removed and required improvements installed to the new street alignment and grade. Existing improvements to remain in place shall be repaired if determined to be damaged and/or off grade by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5500. Existing driveway approaches not identified for current or future utilization shall be removed and sidewalk (when applicable), curb and gutter shall be installed to match existing or proposed street line and grade as determined by the City Engineer. Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 7 21. A minimum four foot wide clear path of travel is required along the public sidewalk on all frontages of the property as required by Title 24 of the California Administration Code as determined by the City Engineer. An on-site pedestrian easement and construction of a path may be required if Title 24 provisions cannot be met within the public rights-of-way. All such public easements shall be identified and dedicated with the processing and recordation of the Final Parcel Map and/or at the time of Special Permit review for the proposed development of the parcel(s). 22. All required signing and striping shall be installed and paid for by the developer/owner. The signing and striping plans shall comply with the current Caltrans standards and shall be submitted as a part of the street improvement plans for this tentative map to the Public Works Department for review and approval. 23. Additional off-site improvements will be required at the time of future site plan review. 24. The subdivider may either construct the required off-site improvements, when required, prior to the approval of the final parcel map; or enter into an agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the approval of the final parcel map. SPECIFIC CONDITIONS STREETS AND RIGHTS-OF-WAY East Ashlan Avenue (100-Foot Arterial Street per Co. O.P.L. #49-al, City O.P.L. #2): 25. Vacate property behind reverse curve, to align 10 feet behind existing curb face, along East Ashlan Avenue and adjacent to Parcel "B." A feasibility study for all vacations of existing public rights-of-way is required to be completed prior to the approval of the Parcel Map. Contact Alan James of the Public Works Department at (559) 621-8693. 26. If not existing, construct concrete curb and gutter, built to a 10-foot pattern, in accordance with Public Works Standard P-5. 27. Construct an underground street lighting system (12 lights) in accordance with Public Works Standard E-1 within the limits of this map. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. North Barton Avenue (64-foot to 84-foot Local Street per DD #12): 28. If not existing, construct concrete curb and gutter, built to an eight-foot pattern, in accordance with Public Works Standard P-5. 29. Relocate existing street light to a location that is 135 feet south of East Ashlan Avenue and construct an underground street lighting system (one light) in accordance with Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 8 Public Works Standard E-2 within the limits of this map. Spacing and design shall conform to Public Works Standard E-9 for Local Streets. On-Site Requirements: 30. Landlocked parcels are prohibited, provide for cross-access to North Barton Avenue, identify on Map. 31. For access to both driveways, a cross-access agreement between all parcels will be required prior to issuance of building permits. 32. Comply with all of the requirements of the Public Works Department, Traffic Engineering Division memorandum dated August 07, 2007 except as may be modified herein. SANITARY SEWER SERVICE Sanitary Sewer Requirements: The nearest sanitary sewer mains to serve the proposed project are an eight-inch sewer main located in North Barton Avenue, and a 15-inch sewer main located within a 20-foot easement on the south side of East Ashlan Avenue.. Sanitary sewer facilities will be available to provide service to the site subject to the following requirements: 33. Sanitary sewer connection shall not be allowed to the existing 15-inch sanitary sewer main in North Barton Avenue. Sewer main is reserved for Fresno Save Mart Center. 34. Separate sewer house branches are required for each lot. 35. Permanent structures shall not encroach into the existing 20-foot public utilities easement referenced above. 36. Abandon all existing on-site private sanitary septic systems. 37. Comply with all of the requirements of the Department of Public Utilities, Planning and Engineering memorandum dated June 28, 2007. Sanitary Sewer Fees: 38. The following Sewer Connection Charges are due and shall be paid for the project: a) Sewer Lateral Charge b) Oversize Sewer Charge c) Trunk Sewer Charge Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 9 d) Sewer Facility Charge WATER SERVICE The following conditions are required to provide water service to the development: 39. Separate services with meter boxes shall be provided to each parcel. 40. Seal and abandon existing on-site well(s) in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 41. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the development including any subsequent phases thereof. The two-source requirement may be accomplished through a combination of water main extensions, construction of supply wells, or other acceptable source so water supply approved by the Water Systems Manager. 42. All public water facilities shall be constructed in accordance with Public Works Department standards, specifications and policies. 43. Comply with all of the requirements of the Department of Public Utilities, Water Division memorandum dated June 18, 2007. FIRE SERVICE 44. Provide approved covenants for shared fire protection, fire fighting access and water supply for all parcels within the boundary of Vesting Tentative Parcel Map No. 2007-12. FLOOD CONTROL AND DRAINAGE 45. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements, which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the attached District's letter to the Planning and Development Department dated June 26, 2007. DEPARTMENT OF PUBIC WORKS-SPECIAL DISTRICTS/PROJECTS AND RIGHTS-OF-WAY 46. Comply with all of the requirements of the Department of Public Works, Parks Supervisor memorandum dated June 22, 2007. Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 10 DEVELOPMENT FEES AND CHARGES This project is subject to the following development fees and charges: Fresno Metropolitan Flood Control District FEE/ RATE Metropolitan Flood Control District Fee $1,234.00 SEWER CONNECTION CHARGES FEE RATE a. Lateral Sewer Charge► $0.10/sq. ft. (to 100' depth) b. Oversize Charge► $0.05/sq. ft. (to 100' depth) c. Trunk Sewer Charge N/A Service Area: d. Wastewater Facilities Charge S.T.E.P.♦ e. Copper Avenue Sewer Lift Station Charge+ N/A f. Fowler Trunk Sewer Interim Fee Surety+ N/A g. House Branch Sewer Charge♦ N/A h. Millbrook Overlay Sewer# N/A WATER CONNECTION CHARGES FEE RATE i. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. j. Frontage Charge► $6.50/lineal foot k. Transmission Grid Main Charge► $804/net acre (parcels under 5 gross acres) I. Transmission Grid Main Bond $304/net acre Debt Service Charge► (parcels under 5 gross acres) m. UGM Water Supply Fee♦ N/A Service Area: Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 11 n. Well Head Treatment Feev N/A Service Area: o. Recharge Feev N/A Service Area: 201 p. 1994 Bond Debt Service► N/A Service Area: 201 CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE q. Fire Facilities Impact Fee - Citywide$** $150/1000 sq. ft t r. Park Facility Impact Fee - Citywide$"* N/A s. Quimby Parkland Dedication Feev** N/A t. Police Facilities Impact Fee - Citywide$** $442/1000 sq. ft t u. Traffic Signal Charge* $41.47/sq. ft t URBAN GROWTH MANAGEMENT FEE RATE v. Major Street Charge► $2,798/adj. acre Service Area: w. Major Street Bridge Charge► $94/adj. acre Service Area: x. UGM Grade Separation Fee* N/A Service Area: y. UGM Trunk Sewer Charge* N/A Service Area: z. Street Acquisition/Construction Chargee N/A Conditions of Approval Vesting Tentative Parcel Map No. 2007-12 October 17, 2007 Page 12 Notes: Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8 Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit Equivalents. Fee applicable to all maps accepted for filing after August 30, 2005 ♦ Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). 4 Due at time of development * Deferrable through Fee Deferral Covenant. v Due at time of subdivision. $ Due at occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. City of a°®r—Men&®'_\\I// DATE: July 27, 2007 TO: Will Tackett, Planner II Planning and Development Department, Planning Division FROM: Greg Jenness, Senior Engineering Technician Public Works Department, Engineering Division SUBJECT: Conditions of Approval for S-07-092rev APN: 438-021-09 ADDRESS: 4166 North Barton Avenue PUBLIC IMPROVEMENT REQUIREMENTS The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Questions relative to dedications, street improvements or off-street parking geometrics may be directed to Greg Jenness at (559) 621-8812 / Greq.Jenness(d-)fresno.gov, Ann Lillie at (559) 621-8690 / Ann.LillieOfresno.gov or Mario Rocha at (559) 621-8684 /.Mario.Rocha(c�f resno.gov , Engineering Division, Traffic Planning Section. Submit the following, as applicable, in a single package to the City of Fresno Public Works Department Engineering Division (559-621-8650), Plan Check and GIS Mapping Section, for review and approval, prior to issuance of building and street work permits: Street Improvement Plans, Signing and Striping Plans, Street Lighting Plans. Underground all existing off-site overhead utilities within the limits of this site/map as per FMC Section 12-1011 and Resolution No. 78-522/88-229 Traffic Impact Study This development will generate 37 a.m. / 92 p.m. peak hour trips and generate a count of 1,002Average Daily Trips (A.D.T.) ADT per building: Building "A" = 295 ADT Building "B" = 186 ADT Building "C" = 237 ADT Building "D" = 284 ADT A Traffic Impact Study is not required. Page 1 of 4 7/2712007 S-07-092rev 4166 N.Barton Traffic Signal Mitigation Impact Fee: This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building ✓permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. Survey Monuments and Parcel Configuration All survey monuments within the area of construction shall be preserved or reset by a person licensed to practice Land Surveying in the State of California. The parcel configuration depicted for the proposed development does not conform to record information: Parcel Map 2007-12 is required to be recorded to establish this configuration prior to building permits. Contact the Planning and Development Department for details or submit a revised exhibit confining the proposed development within existing parcel lines. Street Dedications and Encroachment Permits Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way. Also, identify the required 4' minimum path of travel along the public sidewalk directly in front of property, as required by the California Administration Code (Title 24). A pedestrian easement may be required if Title 24 requirements cannot be met. Deed documents for the required dedications shall be prepared by the applicant's engineer and submitted to the Public works Department, Engineering Division, Special Districts / Projects and' Right of Way Section with verification of ownership prior to issuance of building permits. The cost of deed document processing and recordation fee must be paid at the time of deed submittal. Deed documents must conform to the format specified by the city. Document format specifications may be obtained from the City of Fresno Public Works Department, Engineering Division, Special Districts / Projects and Right of Way Section, (559) 621-8694. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment permit is approved by the City of Fresno Public Works Department, Engineering Division, Special Districts / Projects and Right of Way Section, (559) 621-8693. Encroachment permits must be approvedrp for to issuance of building permits. Street Improvements ,/All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMITrp for to commencement of work. Contact the City of Fresno Public Works Department, Engineering Services Section at (559) 621-8686 for detailed information. All required street improvements must be completed and accepted by the city prior to occupancy. v/Repair all damaged and/or off grade off-site concrete improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5500. Page 2 of 4 7/27/2007 S-07-092rev 4166 N.Barton East Ashlan Avenue: Arterial (100'-109') 1. Construct a 30'- 35" driveway approach to Public Works Standard(s) P-2 and P-4. 2. If not existing, construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' commercial pattern. 3. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this application. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. -OR- show the existing street light locations on the plans, - AND - that they are constructed per current City of Fresno Public Works Standards. North Barton Avenue: Local (64'-72') 1. If not existing, construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' commercial pattern. 2. Dedicate 2' of property for pedestrian easement, behind driveway, for ADA required path. 3. Install a concrete pedestrian walkway behind all driveway approaches as identified on Exhibit "A". Asphalt concrete paving per City of Fresno Public Works Standard Drawing P-41 may be substituted for concrete. (Refer to City of Fresno Public Works Standard Drawings P-2 for additional information.) 4. Construct a 24' — 35'driveway approach to Public Works Standard(s) P-2 and P-4. 5. Remove abandoned (existing driveway approaches not identified for utilization) or reduce excessive width driveway approaches as noted on Exhibit "A", and install sidewalk, curb and gutter per City of Fresno Public Works Standard Drawing P-5 to match existing or proposed street improvement line and grade. 6. If not existing, construct an underground street lighting system to Public Works Standard E-2 within the limits of this application. Spacing and design shall conform to Public Works Standard" E-9 for Local Streets. -OR- show the existing street light locations on the plans, -AND- that they are constructed per current City of Fresno Standards. Off-Street Parking Facilities and Geometrics 1. Off-Street parking facilities and geometrics shall conform to the City of Fresno Public Works Department, Parking Manual and Standard Drawing(s) P-41, P-42, P-43. 2. Install 30" state standard "STOP" sign(s) at location(s) shown. Sign shall be mounted on a 2" galvanized post with the bottom of the sign 7' above ground; located behind curb and immediately behind a major street sidewalk. A"right turn only" sign is also required, at the same location, install a 30" x 36" state standard sign immediately below the stop sign on the same post. 3. Provide parking space needs, circulation, access, directional signs (e.g. "Entrance," "Exit," "Right Turn Only," "One Way" signs, etc.) as noted on Exhibit "A". Depending upon the date of building permits, the following fees may apply Fresno Major Street Impact Fee Requirements: This Map is in the Infill Area; therefore pay all applicable City-wide regional street impact fees. Page 3 of 4 7/27/2007 S-07-092rev 4166 N.Barton State of California Department of Transportation (Caltrans) Fees: Applicant shall pay fair share contribution as determined by the State of California Department of Transportation (Caltrans) to be collected by the City of Fresno Public Works Department Traffic Engineering prior to a Building Permit. Page 4 of 4 7/27/2007 S-07-092rev 4166 N. Barton CITY OF FRESNO - Traffic PlatznitZ� SeCtlol2 SUBMITTAL REQUIREMENTS CHECKLIST FOR ALL SITE PLANS The purpose of the site plan is to enable the Traffic Engineering Division to determine whether or not a proposed development conforms to the requirements of the City of Fresno Public Works Department. The requirements listed below are necessary to ensure proper review based on complete information and to prevent unnecessary delays in the processing of applications. PROVIDE THE FOLLOWING INFORMATION INDICATED B Y A CHECK MARK( ✓): A. GENERAL REQUIREMENTS: PROJECT NO: S — (D ? — O ❑ 1. The plan must be drawn on a 24" x 36" or larger sheet of paper. DATE: ❑ 2. The plan shall include a vicinity map showing local and major streets and a north arrow, a legal description of the subject property, and be drawn to a scale (clearly shown under- the north arrow) large enough to show all required information. ❑ 3. The plan must show the entire parcel of property described in the application. If only a portion of an existing parcel is to be developed, a key map shall be included showing the entire parcel. 4. Indicate phase lines. ❑ 5. All property lines and easements shall be identified and dimensioned. ❑ 6. Indicate scope of work. B. SPECIFIC INFORMATION TO BE SHOWN: ❑ 1. Identify all existing and proposed buildings and structures, including buildings to be removed. Building should be labeled as either existing or proposed. Identify square footage. 2, Identify all existing off-site concrete improvements e.g.: curb, gutter, sidewalk and driveway approaches. Identify sidewalk and driveway approach widths. Provide a legend of all proposed and existing items. ❑ 3. Identify all adjacent streets and roads and their names. ❑ 4. Identify access to property: pedestrian, vehicular and service. Identify all street furniture, e.g., street lights, public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way. Also, identify the required 4-foot minimum path of travel along the public sidewalk directly in front of property, as required by the California Administration Code (Title 24). A pedestrian easement may be required if the Title 24 requirements cannot be met. 5. Identify center and/or section lines. Provide the dimension from the center and/or section line to the property line. ❑ 6. Identify median islands and their openings (specify existing or proposed). 7. Identify proposed street improvements, dedications and or vacations. ❑ 8. Identify.existing and proposed off-street parking, bicycle racks and loading areas: show location and type of paving, number of spaces including a detailed layout and an internal circulation pattern by providing the following: ❑ Size of stalls ❑ Directional flow of traffic ❑ Wheel stops ❑ Disability Parking See Other Side For Additional F. Width of circulation aisles ❑ Disability ramps Requirements ❑ Width of a walkway adjacent to parking stalls ❑ 9. Identify existing and proposed on-site lighting. Specify location and clearance from parking stalls, 10. Identify walls and fences: location, height, and type of material. ❑ 11. Identify the location of existing and proposed public and private fire hydrants, access and fire lanes per City of Fresno Fire Department standards. 12. Such other information as may be pertinent to the application PACE)W 2 City of Fresno-TRAFFIC PLANNING SECTION TrAlk Plat ne Sev inn.uhral prc:niawda C 1T J' CSE FRESNO - Ti-gffic .Tannin- Seci,iOrr ADDITIONAL REQUIREMENTS PROVIDE THE FOLLO�t`ING NOTES ON THE SITE PLAN INDIC,=1 TED B)"A CHECk' rb1,4 K( ✓/. ❑ 1. Any survey monuments within the area of construction shall be preserved or reset by a person licensed to practice land surveying in the State of California. ❑ 2. Repair all damaged and/or off-grade concrete street improvements, as determined by the Construction Management Engineer, rior to occupancy. ❑ 3. 2 working days before commencing excavation operations within the street right-of way and/or utility easements, all existing underground facilities shall have been located by UNDERGROUND SERVICES ALERT (USA). CALL 1-800-642-2444 ❑ 4. All existing driveway approaches which no longer- provide access to approved vehicle parking areas shall be removed unless otherwise approved by the City Engineer. Such areas shall be reconstructed With curb, gutter and sidewalk to match existing adjacent street improvements. This works shall be completed and accepted before a Permit of Occupancy is issued or the building is occupied per Fresno Municipal Code (FMC) 1 1-209 ❑ S. Submit Engineered Street Construction Plans to the Public Works Department. 6. Submit Street Lighting Plans to the Public Works Department, Traffic Engineering. 7. Deed(s) of easement(s) for the required dedication(s) shall be prepared by the owner/developer's engineer and submitted to the City with verification of ownership PRIOR TO ISSUANCE OF BUILDING PERMITS. ❑ 8. Any construction on State Highways must conform to both City of Fresno and State Division of Highways Specifications. f 9. Construct concrete driveway approach to Public Works Standard(s) Z and P-4. ❑ 10. Construct a street-type approach to Public Works Standard(s) P-76/P-77. 11. Construct concrete curb ramp to Public Works Standard P- Z S ❑ 12. Construct concrete sidewalks, curbs and gutters to Public Works Standard P-5. ❑ 13. Install feet of AC paving to Public Works Standard Specifications (To be measured from curb face). 14. Install 30" state standard "STOP" sign(s) at location(s) shown. Sign shall be mounted on a 2" galvanized post with the bottom of the sign 7" above ground; located behind curb and immediately behind major street sidewalk. Arterial Streets: A "RIGHT TURN ONLY" sign is also required at same location, install 30" x 36" State Standard sign immediately below the "STOP" sign on the same post. ❑ 15. The submitted project site is located within the City of Fresno's URBAN GROWTH MANAGEMENT (UGM) AREA. UGM IMPROVEMENTS ARE REQUIRED. Submittal of Engineered Construction plans for Public Works approval must be made PRIOR TO ISSUANCE OF BUILDING PERMITS. Contact the Public Works Department, Traffic Planning Section @ 559-621-8800 for details. X16. Underground all existing offsite overhead utilities within the limits of this site/map as per Fresno Municipal Code (FMC) Section 12-1011 and Resolution No. 78-522/88-229. ate City of Fresno Standard Specifications PROJECT NO: 5 - 07- and — �]Z Drawings available at o www.fresno.gov PAGE 2 of 2 City of Fresno•TRAFFIC PLANNING SECTION Tn,l'ic Plunning Section cuhrq.preads1rei4 City of 1=4.1 Ii/ F—ff I e a P V4OR DEPARTMENT OF PUBLIC UTILITIES Date: May 25, 2007 To: WILL TACKETT, Planner II Planning and Development Department, Advance Planning From: CHRIS WEIBERT, Management Analyst II Public Utilities Department, Administration Subject: S-07-092 is a request to establish a new 8,178 square foot veterinary facility, along with 3 other buildings in a unified center, ranging in square footage from 4,336 to 6,605, for future use as retail and commercial. This project is situated on approximately 1.9 acres of presently vacant property, with the exception of one residence which will either be moved or demolished prior to development, and is located on the corner of East Ashlan and North Barton Avenues; just west of State Route 168. Requirements Sanitary sewer facilities are available to provide service to the site subject to the following requirements: On-site sanitary sewer facilities shall be private. Separate sewer house branches are required for each lot. Recommend trees planted within the Pubic Utilities Easement be shallow root trees. Bring street furniture to existing grade. Fees The following Sewer Connection Charges are due and shall be paid for the Project: Sewer Lateral Charge Oversize Sewer Charge Sewer Facility Charge (Non-Residential) Upon connection of this Project to the City Sewer System the owner shall be subject to payment of Sewer Facility charges per Fresno Municipal Code Section 9-505.1 and 9-505.2. Sewer Facility Charges consist of two components, a Wastewater Facilities Charge and Trunk Sewer Charge where applicable. Sewer Facility Charges are collected after occupancy on a bi-monthly basis over time based on metered (water or sewer effluent) usage. The developer may contact the Department of Public Utilities (559) 621-8554 to receive an estimated cost of the Sewer Facility Charges applicable to the project (based on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. Pagel of 2 Comments Trunk Service Basin Orange Page 2 of 2 amity of DEPARTMENT OF PUBLIC UTILITIES Date: May 25, 2007 To: WILL TACKETT, Planner II Planning and Development Department, Advance Planning From: CHRIS WEIBERT, Management Analyst II Public Utilities Department, Administration Subject: S-07-092 is a request to establish a new 8,178 square foot veterinary facility, along with 3 other buildings in a united center, ranging in square footage from 4,336 to 6,605, for future use as retail and commercial. This project is situated on approximately 1.9 acres of presently vacant property, with the exception of one residence which will either be moved or demolished prior to development, and is located on the comer of East Ashlan and North Barton Avenues;just west of State Route 168. Req uirements Water facilities are available to provide service to the site subject to the following requirements: On-site water facilities shall be private. Separate water services with meter boxes shall be provided for each lot. Bring street furniture to existing grade. Seal and abandon existing on-site well in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. Fees Payment for installation of water service(s) and/or meter(s) is required. Water Connection Charges are due and shall be paid for the Project. Page 1 of 1 City of -0 1w's DEPARTMENT OF PUBLIC UTILITIES Date: May 25, 2007 To: WILL TACKETT, Planner II Planning and Development Department, Advance Planning From: CHRIS WEIBERT, Management Analyst II Public Utilities Department, Administration Subject: 5-07-092 is a request to establish a new 8,178 square foot veterinary facility, along with 3.other buildings in a unified center, ranging in square footage from 4,336 to 6,605, for future use as retail and commercial. This project is situated on approximately 1.9 acres of presently vacant property, with the exception of one residence which will either be moved or demolished prior to development, and is located on the comer of East Ashlan and North Barton Avenues;just west of State Route 168. Does Project Affect Your Agency/Jurisdiction Yes - Project will be serviced by Solid Waste Division Sugestions to Reduce Impacts/Address Concerns Show fully drawn enclosures with center wall and gates. Three cells required for restaurants. It appears there is going to be a drive-thru, is this a proposed restaurant? Enclosure shall be constructed on a level surface. Recommended Conditions of Approval Project will be serviced by Solid Waste Division. Enclosure shall be built in accordance with current Solid Waste standards. Current Solid Waste Standard Attached Additional Information Revise plans to address concerns stated above and resubmit for approval. Need answers to questions stated above. Make sure developer/contractor receives copy of current Solid Waste Standards. Page I of I General Notes: 1. AJI site plans must have the signature approval of a Solid Waste Management Dfvislon representative 2. Containers used at all places net served from alleys shall be placed for collection at service locations approved by the Public Works Director, but shall not be stored in the public right—of—way. 3. The design of any new, substantially remodeled or expanded building or other facility shall provided for proper storage or handling which will accommodate the solld waste loading anticipated, and which will allow for efficient and safe waste removal or collection. 4. The operator shall plan with the property owner and/or occupant as to placement of storage containers to minimize traffic, aesthetic and other problems both an the properly, and for the general public. 5. Below Is a checklist of requirements reviewed for a site plan: a. Refuse, recyclables, and grease barrels shalt be stored for later removal from the premises in an area that is screened from view of the public streets by a sight barrier. Such sight barriers are to be built using (8") eight inch concrete block at a height of (6') six feet. b. Enclosures built in (Industrial zones) M-1, M-2. M-3, and CM zones requiring director approval may eliminate walls as long as it is not visible from a main strecL For this design the curbing will be (12') twelve inches wide on bath aides, (18") eighteen inches deep along the rear with a (32") thirty two inch wide curb separating the two compartments_ Curbing must be reinforced with rebar and at a height of (10' ten inches. WI cnclosurca must be a minimum of (18') eighteen inches from the nearost curb. All other Public Works design requirements must be met during review. c. The storage area shall be of sufficient size to accommodate enough containers to handle the accumulation of waste and recyclables generated between collections_ For a single bin up to (B) six cubic yards In capacity, a storage area with Inner dimensions (10') ten feet by (10') feet is the minimum. There should be wheel strips (12-) twelve inches from side walls and (I8") eighteen inches from rear wall and at a height of (10") ten inches_ These Features are included in order to reduce the possibility of damage to the enclosure itself. d. Service access to enclosure shall be a minimum unencumbered opening of (8') eight feet. The gate to be used, shall be built of metal so that bins cannot be seen when gates are closed and shall be mounted on the outer surface of enclosure as to not protrude into Bervice access opening. Hardware latches should be a heavy guage locking gate latch. Two gates are required on each cell with the exception of the grease barrel cell. s. The floor or bottom surface of the collection area shall be made of concrete, (SLOPED) (19.) one percent to the front, and there shall not be any drainage gutter in front of entrance. The floor shall not slope to the back or sides of the enclosure to allow drainage to the rear of the area or cause any standing water within the enclosure. it shall be constructed so the collection vehicle can drive directly into the pockets of the containers without any obstructions: f. Ingress and egress shall have an unobstructed overhead clearance of (16') sixteen feet and shall be not less than (18') eighteen feet wide and capable of accommodating a truck with a (250") two hundred fifty inch wheelbase, a (442) forty four foot turning radius and a support weight of (30) thirty tons. Area shall be unobstructed and so configured that a truck will be able to make a round trip from the public right—of—way to the collection area and return without excessive backing into a traffic lane or a public thoroughfare. Backing around a building IS Not allowed. At no time shall a truck be required to back in excess of (45') forty—five feet. q. Bin enclosure gates and sarvicc arca should not open into or be a part of a parking stall or loading zone. In. Service sites shall be at least (40') forty feet away from entrance and exits to eliminate trucks from sticking out Into the roadway while waiting to access enclosure and allow trucks enough space to clear gate on exiting while waiting to merge with traffic. i. The enclosure(s) shall accommodate refuse bins, recycle bins and a grease barrel when applicable. Neither the wastes nor recycling container should be required to be moved in aider to service the other. Crease barrels may not be placed in the same area of the enclosure with refuse or recyclables. j. Sfgnage Is required to clearly Identify all recycling, solid waste collection and loading areas and the materials accepted therein. This signage shall be placed at all points of direct access to recycling, solid waste and loading areas on, or adjacent to, the recyclable and solid waste material containers. k. Sites utilizing compactors must leave (80') sixty feet of clearance in front of the unit for loading and unloading. TYPICAL REFUSE CONTAINER REF. & Rev. an of FRESNO MAR. 2006 ENCLOSURE DETAILS P - 34 ENCLOSURE SCALE / STANDARD ENCLOSURE SCALE / RESTAURANT 1a s �10 8"� CURB CURB Gate Posts :s' CONCftEfI BLacc Gate Pasts s`-COR 'BiocM Metal s' A1`1 Doors GREASE BARREL Metal t l0 hm1w TRASH V Doors OPE 10 \ ORAN 0Ur - Gate Posts e_7 CONCRETt BLOCK DOOR 10" N cacl+Ers cups t � A Cate Posts—+ - '$' CONCRETE BLOCK ',. 22 / ��6 x ri -. Metal lo/lo -ww TRASH 11' Doors MOPEDRAN CUT RECYCLE DOOR 'o-" CONGRE(E cuT:s Metal-' 1 1a L, + ' Doors OPE ra 11' \ DRAIN our Gate Posts -:a- CDNCRETE BLOC1r ♦ 27' DOOR orcRETE cups t Gate Posts .B'-LDNCREM at.acat i e 6 RECYCLE Metal 1wNw Doors SEA ToOR �--10' a-� \ DOORS lc H ENCLOSURE SCALE CURB ONLY OONCRETE CUM ZDNES—M1,M2,M3, & CM ONLY Cata Posts CaNCfiETE13LCLp1(•+ �tD' a'� CURB General Notes: 10• g- 12"WIDE CURB= .. 1. All construction shall comply with the Fresno Municipal Cade. TRASH 2. Grout all cells. 3. All masonry units shall comply with the latest 10210E TwaW ; 11' adopted California Building Code and U.B.C. standard DRAN OUT lEe 24-4 Grade N. DOOR 10'H w 4, All masonry walls shall be inspected by the City of Fresno. CONCREIE CURB -I _ 5. Depth of footings ars into natural undisturbed �. a, •D soil or tested and approved compacted filL "" r M MDE:bURB E _ 22' 5. All masonry units shall be minimum fpm=1500 psi. C 7. Reinforcing steel shall .be deformed bar, min_ Crade 40. u 8. Footing concrete shall be a minimum 2000 psi at 28 days. RECYCLE R 9. Mortar shall be type—S (minimum 1800 psi at 28 days). 10%10 www -B". One (1) part cement, Type-1 DRAM p r 11' One—half (1/2) part lime putty or hydrated Gree. ODOR 10'H -'�•. I t8' Four and one—half (4 1/2) parts sand (maximum). CONCRETE ax1RB 1D. Grout shall be a minimum 2000 psi at 28 days. - ,�_ Dns (1) port cement. 12'wID'' turas'. _ Three (3) parts sand. Two (2) parts pea gravel. 11. Finish pad elevation to be flush with grade at access pavement. 1D' B' 12. Any gate hinges should be located on the outside. Flush Mo3onary Cap 13, Metal doors are required on all enclosures, chain link is not or Rounded Grout Cap acceptable. 14. 8" concrete block to be used for walls. #4 Bar Continuous (Hoerr) 15. 2 cells are required for commercial/industrial buildings. 8" std. Masonry Unit 16, 3 cells are required for restaurants. f4 Bars (vert.) 0 32" O.C. ' 18' 1Z- _ 10, Finished Grade, 1 D" See Note 5. 4" a.- Finished Grooe• 0 ' _ •,ate See Note " _ tw• I . I Z–f 4 Bare 2–#4 Bare View "A-A" Typical Section wl Concrete Block Wall View "B—B" TREF. & REV. CITY OF FRESNO TYPICAL REFUSE CONTAINER MAR 20x6 ENCLOSURE DETAILS P - 33 (-"!ty 01i FRESN44` .,;w DEPARTMENT OF PUBLIC UTILITIES Date: June 27, 2007 To: WILL TACKETT, Planner Il Planning and Development Department, Advance Planning From: CHRIS WEIBERT, Management Analyst 11 l Public Utilities Department, Administration �.I Subject: PM-2007-12 for approximately 2.01 acres of property located on the southeast corner of the intersection of East Ashlan and North Barton Avenues. Does Project Affect Your Agency/Jurisdiction No - Project does not directly affect Solid Waste Division Recommended Conditions of Approval None. Page 1 of 1 DEPARTMENT OF PUBLIC UTILITIES Date: June 28, 2007 To: WILL TACKETT, Planner III Planning and Development Department From: ROBERT A. DIAZ, Senior Engineering Technician Department of Public Utilities, Planning and Engineering Subject: SANITARY SEWER REQUIREMENTS FOR PM-2007-12 General PM-2007-12 proposes approximately a 2.01 acres of property located on the southeast corner of the intersection of East Ashland and North Barton Avenues. Environmental Recommendations A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environment Impact Report. Sanitary Sewer Requirements The nearest sanitary sewer mains to serve the proposed project are an 8-inch sewer main located in North Barton Avenue. 15-inch sewer main located within a 20-foot easement on the south side of East Ashlan Avenue. Sanitary sewer facilities will be available to provide service to the site subject to the following requirements: 1. Sanitary sewer connection shall not be allowed to the existing 15-inch sanitary sewer main in North Barton Avenue. Sewer main is reserved for Fresno Save Mart Center. 2. Separate sewer house branches are required for each lot. 3. Permanent structures shall not encroach the existing 20-foot public utilities easement. 4. Abandon all existing on-site private sanitary septic systems. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge 2. Oversize Sewer Charge 3. Trunk Sewer Charge 4. Sewer Facility Charge WATER DIVISION Date: June 18, 2007 To: DOUG HECKER, Supervising Engineering Technician Department of Public Utilities, Administration Through: MICHAEL CARBAJAL, Supervising Engineering Technician Department of Public Utilities, Water Division From: ANITA LUERA, Senior Engineering Technician Department of Public Utilities, Water Division Subject: WATER REQUIREMENTS FOR TENTATfVE PARCEL MAP NO. 2007-12 The following conditions are required to provide water service to the development. 1. Separate services with meter boxes shall be provided to each parcel. 2. Seal and abandon existing on-site well(s) in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 3. Two independent sources of water, meeting Federal and State drinking Water Act Standards, are required to serve the development including any subsequent phases thereof. The two-source requirement may be accomplished through a combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 4. All public water facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. TIPROJMIMECMConditions of ApprovaNPM 2006-49 071807.doc City of I-ff It li FIRE DEPARTMENT Date: May 30, 2007 To: WILL TACKETT, Planner II Planning and Develo ment Department , Advance Planning From: MIKE SCHMIDT, Supervising Fire Prevention Inspector Fire Department, Fire Prevention & Investigative Services Subject: S-07-092 is a request to establish a new 8,178 square foot veterinary facility, along with 3 other buildings in a unified center, ranging in square footage from 4,336 to 6,605, for future use as retail and commercial. This project is situated on approximately 1.9 acres of presently vacant property, with the exception of one residence which will either be moved or demolished prior to development, and is located on the corner of East Ashlan and North Barton Avenues;just west of State Route 168. Hydrants Developer must install on-site hydrant. See Plan for location. Provide fire hydrant flow of 1500 GPM 8" water main minimum Fire hydrants shall be installed, tested, approved, and all surface access roads shall be installed and made serviceable prior to and during the time of construction. The hydrant 4 1/2" outlet shall face the access lane. Cit;; of r FIRE DEPARTMENT Date: July 05, 2007 To: WILL TACKETT, Planner II Planning and Development Department , Advance Planning From: MIKE SCHMIDT, Supervising Fire Prevention Inspector Fire Department, Fire Prevention & Investigative Services Subject: PM-2007-12 for approximately 2.01 acres of property located on the southeast corner of the intersection of East Ashlan and North Barton Avenues. General Provide approved covenant/s for shared fire fighting access and water supply for landlocked parcel "C" and other parcels. City of IIMIedM� Cr01 i DATE: August 7, 2007 TO: Will Tackett, Planner III Development Department, Planning Division, Current Planning THROUGH: Louise Gilio, Traffic Planning Supervisor Public Works Department, Engineering Division FROM: Gregory A. Jenness, Senior Engineering Technician. Public Works Department, Engineering DivisionM SUBJECT: Tentative Parcel Map 2007-12, Public Works Conditions of Approval Location: Southeast corner of North Barton Avenue and East Ashlan Avenue Owner: Richard and Marian Holm STREET IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. Construct or install the required improvements, or contact Gary Witzel at (559) 621-8725 to enter into a bonded secured agreement for these improvements. This must be executed rior to perfection of this parcel map. General Conditions ✓Repair or replace all existing damaged and/or off-grade offsite concrete improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5500. •� Submittal of engineered construction plans to the Planning and Development Department for approval must be made prior to the final map. ✓ All required signing and striping shall be installed and paid for by the developer/owner. The signing and striping plans shall comply with the current Caltrans standards and be submitted as a part of the street improvement plans. •"" Additional offsite improvements will be required at the time of future site plan review. • Curb ramps are required at all corners within the limits of this parcel map. ✓Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. Page 1 of 2 T:\TRAFFIC ENGINEERING\Traffic Planning\Parcel Maps\CONDITIONS OF APPROVAL FOR PARCEL MAPS\TentPM200712 Ashlan& Barton.doc Major Streets: East Ashlan Avenue: Arterial (100') (per Co. O.P.L. #49-a1, City O.P.L. # 2) 1. Vacate property behind reverse curve, to align 10' behind existing curb face, along East Ashlan Avenue and adjacent to Parcel "B". A feasibility study for all required vacations of existing public rights of way is required to be completed rior to the approval of the tentative map. Contact Alan James of the Public Works Department at (559) 621-8693. 2. If not existing, construct concrete curb and gutter, built to a 10' pattern, in accordance with Public Works Standard P-5. 3. Construct an underground street lighting system (1 light) in accordance with Public Works Standard E-1 within the limits of this map. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. North Barton Avenue: Local (64'-84') (per DD # 12) 1. If not existing, construct concrete curb and gutter, built to an 8' pattern, in accordance with Public Works Standard P-5. 2. Relocate existing street light to a location that is 135' south of East Ashlan Avenue and construct an underground street lighting system (1 light) in accordance with Public Works Standard E-2 within the limits of this map. Spacing and design shall conform to Public Works Standard E-9 for Local Streets. ON SITE REQUIREMENTS 1. Landlocked parcels are prohibited, provide for cross access to North Barton Avenue, identify on Map. 2. For access to both driveways, a cross access agreement between all parcels will be required prior to issuance of building permits. Page 2of2 T:\TRAFFIC ENGINEERING\Traffic Planning\Parcel Maps\CONDITIONS OF APPROVAL FOR PARCEL MAPS\TentPM200712 Ashlan& Barton.doc He No. =10.41? FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager RICHARD HOLM Planning & Development Department 2054 LESTER City of Fresno CLOVIS, CA. 93619 2600 Fresno Street - Fresno, CA 93721 PROJECT NO. 2007-092 PRELIMINARY FEE(S) (See below) DRAINAGE A " C JJ DRAINAGE AREA C " $12,150.00 DATE fo /C)7 DRAINAGE AREA JJ 51,777.00 APN 438-021-21,09 TOTAL FEE $13,927.00 ADDRESS 4166 N. BARTON AVE. The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA.impact of the project mitigation requirements. }' The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance. The fee indicated above is valid through February 29, 20 08 based on the site plan submitted to the District on 05/25/07 Contact FMFCD for a revised fee in cases where changes are ft4made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 2007-092 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO NIETROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page? of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 ,4-2) C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. las "Master Plan Facilities to be constructed by Developer". X None required. ;. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan Storm Drain Plan Final Map Street Plan Water & Sewer Plan Other 4. Availability of drainage facilities: X a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No..2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. (See attached Floodplain Policy.) 2007.092 5469 E. OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 X Appears to be located within a 500 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District. Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge, storm water, and/or flood flows. The existing capacity must be preserved as part of site .development. Additionally, site development may not interfere with the ability to operate and maintain the canal or pipeline. 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. ■ a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than.one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control W4 Board (State Board), develop and implement a storm water pollution prevention plan, ' eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, and complete an annual certification of compliance. Aft b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators;.and annually submit a report to the State Board. 2007.092 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO NIETROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No. 2 for additional comments, recommendations and requirements. Gerald E. Lakeman CJ��` Project Engineer: Ric o s District Engineer C: ERIC BOWER BMY CONST-GROUP, INC. 5493 E. OLIVE AVE. FRESNO, CA. 93727 2007.092 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document NOTE: THIS DRAWING IS SCTM L-\TIC, 1 DISTANCES ARE APPRQXL%AATi'.. AUSTIN l BASIN "C" ° ° i 24- r 24'ASHLAN 1 k1 SPS �] ^ $ t'�li`Irl7 1'F • 2007-092 ��il •acv P, yt'r BUCKINGHAM z / O Q / "Jill j HAMPTON I BASIN "BDCOB" LEGEND G— — — Existing MasterPlan Facilities Existing Master Plan Outfall Existing Basin Relief Pump Direction Of Drainage -————— Inlet Boundary SCALE 1'r=200' Drainage Area Boundary SPR 2007-092. DRAL(AGE AREAS: art;: EXHIBIT N0. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT DRANK BY. MQFj DATE: 5=7 �cis�a,�.�ntnw[SSAf]cHIBIPLITYSPRli0B7-09lCuv OTHER REQUIREMENTS EXHIBIT NO. 2 Our records indicate that there may not be continuous existing curb and gutter to convey runoff to the MasterPlan inlet located at Hampton Way and Cedar Avenue. The developer shall be required to provide documentation and/or improvements satisfactory to the City of Fresno to allow for conveyance of storm water to the inlet location for that portion of storm runoff in drainage area"JJ". In an effort to improve storm water runoff quality, outdoor storage areas shall be constructed and maintained such that material which generates contaminants will not be conveyed by runoff into the storm drain system. The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities, product, or merchandise come into contact with and may contaminate storm water must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing, is to be required unless such wash water can be directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas that directly connect to the District's system will not be permitted. Loading docks, depressed areas,.and ( areas servicing or fueling vehicles are specifically subject to these requirements. The proposed underground parking identified with this project will need to be isolated from intrusion of storm water runoff and the method of removing any nuisance waters will need to be reviewed and approved by the District prior to implementation. Development No. SPR 2007-092 engr\perm it\exhibit2\2007\c ity-spy\2007-092(rl) He No. 2 10.4 1 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager Richard & Marian Holm Planning& Development Department 2054 North Gateway Blvd. City of Fresno Fresno, CA. 93727 2600 Fresno Street - Fresno, CA 93721 MAP NO. 2007-012 PRELIMINARY FEE(S) (See below) DRAINAGE ARE (S) 11C JJ DRAINAGE AREA ItC $1,088.00 DATE ��2(v27 DRAINAGE AREA JJ $146.00 TOTAL FEE $1,234.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The O District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee O indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. O Considerations which may affect the fee obligation(s) or the timing or form of fee payment: y 1 a) Fees related to undeveloped or phased portions of the project may be deferrable. O b) Fees may be calculated based on the actual percentage of runoff if different than that j typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 2007-012 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 //2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". X None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan Storm Drain Plan Final Map Street Plan Water& Sewer Plan Other 4. Availability of drainage facilities: X a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. (See attached Floodplain Policy.) 2007-012 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 Appears to be located within a 500 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District. Nq X Does not appear to be located within a flood prone area. 00 6. The subject site contains a portion of a canal or pipeline that is used to manage 43 recharge, storm water, and/or flood flows. The existing capacity must be preserved as part of site development. Additionally, site development may not interfere with the ability to operate and maintain the canal or pipeline. 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits)require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which O may be generated by operations at the development after construction. ■ a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a O larger common plan of development or sale). Permittees are required to: submit a O Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site , inspections, train employees in permit compliance, and complete an annual O certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 2007-012 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recornmended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No. 2 for additional comments, recommendations and requirements. Gerald E. Lakeman Project Engineer: Rick Lyo s District Engineer C: RABE Engineering Inc. 2021 N. Gateway Blvd. Fresno, CA. 93727 2007-0i2 5469 E.OLIVE - FRESNO,CA 93727 - (559)4S6-3292 - FAX(559)456-3194 Two sided document NOTE: THIS DRAWING IS SCHEMATIC, I DISTANCES ARE APPROXIMATE. AUSTIN N / I BASIN "C" 0 0 24- 24- 24" 4-24"24" r P _ 110,1 CO. "JJ" TPM 2007-012 �b / BUCKINGHAM / O Q m ' ------------------� HAMPTON BASIN i i "BDCDB" � I � LEGEND o—• — — Existing Master Plan Facilities op Existing Master Plan Outfall Existing Basin Relief Pump -- Direction Of Drainage ————— — Inlet Boundary SCALE 1"=200' Drainage Area Boundary TPM 2007-012 DRAINAGE AREAS: 11 C 11&11 7 711 FAN� EXHIBIT N0. 1 11j l FRESNO METROPOLITAN FLOOD CONTROL DISTRICT DRAWN BY: MDHiI DATE: 8119101 ICV1Wac8doWGS10EI(HIBITUTYPWMI-012dwg REVISED BY: — DATE: — OTHER REQUIREMENTS EXHIBIT NO. 2 Our records indicate that there may not be continuous existing curb and gutter to convey runoff to the Master Plan inlet located at Hampton Way and Cedar Avenue. The developer shall be required to provide documentation and/or improvements satisfactory to the City of Fresno to allow for conveyance of storm water to the inlet location for that portion of storm runoff in Drainage Area «JJ„ The following paragraphs only apply towards development of the individual parcels and are not conditions for the recording of the map. In an effort to improve storm water runoff quality, outdoor storage areas shall be constructed and maintained such that material which generates contaminants will not be conveyed by runoff into the storm drain system. The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities, product, or merchandise come into contact with and may contaminate storm water must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing, is to be required unless such wash water can be directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas that directly connect to the District's system will not be permitted. Loading docks, depressed areas, and areas servicing or fueling vehicles are specifically subject to these requirements. Development No. TPM 2007-012 engr\perm it\exhibit2\2007\city-tpm\2007-012(rl) DEPARTMENT OF PUBLIC WORKS TO: Will Tacket Planner III Planning Division FROM: Hilary Kimber, Parks Supervisor II (559.621.8794) DATE: June 22, 2007 SUBJECT: Tentative Parcel Map 2007-12 The Department of Public Works offers the following comments regarding TPM 2007-12 One tree is required per new lot or 60' of frontage, whichever is greater. The recommended varieties are: E. Ashlan Avenue Celtis australis (European Hackberry)(3 tree Parcel A; 1 tree Parcel B) N. Barton Avenue Platanus acerifolia `Columbia' (Columbia Sycamore) (3 trees Parcel A; 2 trees Parcel D) DEPARTMENT OF PUBLIC WORKS TO: Will Tacket, Planner Planning Division FROM: Hilary Kimber,Parks Supervisor II (559.621.8794 DATE: June 29, 2007 SUBJECT: SITE PLAN REVIEW APPLICATION NO. S-07-092 The Department of Public Works offers the following comments regarding plans for the property located at 4166 N. Barton Avenue: GENERAL REQUIREMENTS 1. The Fresno Municipal Code requires street trees to be planted at rninimum rate of 60-foot intervals along street frontages. Because the existing sidewalk is monolithic, the Public Works Department will accept onsite trees in-lieu —of street trees. These trees will be planted within ten (10) feet of the back of the sidewalk to qualify as street trees. Five (5) trees are required on North Barton Avenue and five (5) trees are required on East Ashlan Avenue. 2. The Site Plan Designed by The Vernal Group shows five (5) Pistacia chinensis (Chinese Pistache) that would be acceptable and there are five (5) Pistacia chinensis (Chinese Pistache) located on East Ashlan Avenue that would also meet these requirements if planted within the ten (10) foot area behind the sidewalk. (Please refer to attached Site Plan Landscape Design). <� OFFICE OF I��ESI'�TO II�d��I ATIOl I I►�TR�IC� TELEPHONE(559)233-7161 FAX(559)233-8227 •. 2907 S.MAPLE AVENUE FRESNO,CALIFORNIA 93725-2218 YOUR MOST VALUABLE RESOURCE-WATER June 15, 2007 � r Mr. Will Tackett City of Fresno Planning Division ..`' Q J/ f' 2600 Fresno Street Third Floor Fresno, CA 93721-3064 RE: TPM No. 2007-12, APN: 438-021-09 & 21, 4166 North Barton Avenue Dear Mr. Tackett: FID's comments and requests are as follows: 1. FID does not own, operate or maintain any facilities located on the applicant's property. 2. FID expects no adverse impacts from the approval of the subject proposal. Thank you for submitting this for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 321 or sbloem ,fresnoirrigation.com Sincerely, Steve Bloem Engineering Technician I G AAgencies\City\PM2007-12.doc BOARD OF President JEFFREY G. BOSWELL, Vice-President JEFF NEELY DIRECTORS EDDIE NIEDERFRANK,STEVE BALLS,TOM E.STEFFEN,General Manager GARY R.SERRATO � co U� County of Fresno ag56O Department of Community Health Edward L. Moreno, M.D., M.P.H. �jZES Director—Health Officer May 30, 2007 t 999999999 (N � L00013723 PE 2602 Will Tackett ° City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Tackett: PROJECT NUMBER: S-07-092 PROJECT DESCRIPTION AND LOCATION: Request to establish a new 8,178 square foot veterinary facility, along with three other buildings in a unified center, ranging in square footage from 4,336 to 6,605, for future use as retail and commercial. This project is situated on approximately 1.9 acres of presently vacant property (with the exception of one residence which will either be moved or demolished prior to development) and is located on the corner of East Ashlan and North Barton Avenues; just west of State Route 168. APN: 438-021-21, 09 Zoning: M-1/cz Address: 4166 North Barton Avenue Comments/Concerns: • Since specific tenants for this application have not been identified, the full range of M-1 uses must be considered. The potential adverse impacts could include (but are not limited to) storage of hazardous materials and/or wastes, medical waste, solid waste, water quality degradation, excessive noise, and odors. Recommended Conditions of Approval: • Future tenants may be required to obtain a Medical Waste Permit from the California Department of Health Services, Medical Waste Management Program. Call (916) 449-5671 for more information. • Should a retail food establishment be proposed, prior to issuance of building permits, the applicant or future tenant shall submit complete food facility plans and specifications to the Fresno County Department of Community Health, Environmental Health Division, for review and approval. Contact the Consumer Food Protection Program at (559) 445-3392 for more information. • Prior to operation, future tenants may be required to apply for and obtain a license to sell alcoholic beverages. Contact the California Alcoholic Beverage Control Department at (559) 225-6334 for more information. • Prospective tenants should be advised that construction and operating permits may be required by the State of California, Department of Health Services for wholesale food 1221 Fulton Mall/P.O. Box 11867/Fresno, California 93775/(559)445-3357/FAX(559)445-3379 Equal Employment Opportunity•Affirmative Action•Disabled Employer Will Tackett S-07-092 May 30, 2007 Page 2 of 3 manufacturing. Contact the staff at the Division of Food and Drug at (559) 445-5323 for more information. • Any tenant proposing to utilize hazardous materials or create hazardous wastes, shall, prior to occupancy, complete and submit either a Hazardous Materials Business Plan or a Business Plan Exemption form to the Fresno County Department of Community Health, Environmental Health Division. Contact the Certified Unified Program Agency at (559) 445- 3271 for more information. • All hazardous waste shall be handled in accordance with requirements set forth in the California Health and Safety Code, Chapter 6.5. This chapter discusses proper labeling, storage and handling of hazardous wastes. • Any tenant proposing to utilize underground storage tank systems shall, prior to issuance of building permits, submit three (3) sets of complete plans and specifications regarding the installation of any underground storage tanks to the Fresno County Department of Community Health, Environmental Health Division. Contact the Certified Unified Program Agency at (559) 445-3271 for more information. • Any tenant proposing to utilize aboveground petroleum storage tanks may have to file a statement regarding the use of such with the State of California, Water Resource Control Board. Contact the Division of Clean Water Programs at (916) 739-2670 for more information. • The applicant should be advised of the State of California Public Resources Code, Division 30; Waste Management, Chapter 16; Waste Tire Facilities and Chapter 19; Waste Tire Haulers, which may require the Owner/Operator to obtain a permit from the California Integrated Waste Management Board (CIWMB). Contact the CIWMB, Tire Unit Perrnit Branch, at (916) 255-3896 for additional information. The following comments pertain to the removal and/or demolition of the existing structure.- 0 tructure:• Should the structure have an active rodent or insect infestation, then the infestation should be abated prior to demolition of the structure in order to prevent the spread of vectors to adjacent properties. • In the process of demolishing the existing structure, the contractor may encounter asbestos containing construction materials and materials coated with lead based paints. If asbestos containing materials are encountered, contact the San Joaquin Valley Air Pollution Control District at (559) 230-6000 for more information. • If lead based paints are suspected to have been used in the structure, then the contractor hired to demolish the existing structure should contact the following agencies for possible new regulations regarding their removal: Will Tackett S-07-092 May 30, 2007 Page 3 of 3 San Joaquin Valley Air Pollution Control District at (559) 230-6000 for more information. State of California, Industrial Relations Department, Division of Occupational Safety and Health, Consultation Service (CAL-OSHA) at (559) 454-5302 for more information. • Any construction materials deemed hazardous as identified in the demolition process must be characterized and disposed of in accordance with current federal, state, and local requirements. • Should any underground storage tank(s) be found on the premises, the applicant shall apply for and secure an Underground Storage Tank Removal Permit from the Fresno County Department of Community Health, Environmental Health Division. Contact the Certified Unified Program Agency at (559) 445-3271 for more information. • Prior to occupancy, any water wells on the subject property must be properly destroyed. The destruction and construction of wells can only be completed by a licensed C-57 contractor. The Department of Community Health is available to provide consultation in cooperation with your city in order to encourage the proper destruction of wells and safeguard our water quality. City staff may contact Ed Yamamoto, Water Surveillance Program, at (559) 445-3357 for more information. REVIEWED BY. Glenn Allen, Env' o mental Health Specialist III (559) 445-3357 ga cc: Baruti/Casagrande/Tolzmann, Environmental Health Division Vince Mendes, Environmental Health Division (CT 5202) Steven Rhodes, Environmental Health Division S-07-092 Holm San Joaquin Valley AIR POLLUTION CONTROL DISTRICT June 4, 2007 Will Tackett ��� ED ;.` City of Fresno `� '� `u'' '' Planning and Development Department PIANNiNq ANd V i 2600 Fresno Street, 3 Floor DEVEIOpMEM' Fresno, CA 93721 Project: Site Plan Review Application No. S-07-092 Subject: CEQA comments regarding the development of a veterinary facility and three retail buildings in a unified center District Reference No: 200701016 Dear Mr. Tackett: The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the..:,,,,. project referenced above and offers the following'comments:; The San Joaquin.,Valley Air Basin,,is currently designated as, serious non-attainment for Ozone and non-attainment..(no classification) .for. PM2.5. -.On October 30, 2006, the US EPA found that the San Joaquin Valley had attained the PM10 standard. The US EPA based its determination upon monitoring, data demonstrating that the ambient air quality had met the requirements for attainment, The US EPA's finding does not change the District's classification as a serious PM10 non-attainment to attainment area. However, re-designation from serious non-attainment to attainment requires additional dcc!um.ent.-tion and :" ill.nGcur of some future date. Findings of Significance This project would contribute to the overall decline in air quality due to construction activities in preparation of the site, and ongoing traffic and other operational emissions. Based on the information provided, the District expects that the project would not exceed the. District's- Thresholds of Significance: for,ozone precursors_of 10 .tons per year of .reactive organic gases (ROG) and oxides of nitrogen (NOx). However, the increase in emissions..from this project, and ,others like, it,,cumulatively reduce the air quality in the Seyed Sadredin Executive OirectarfAir Pollution Control Officer Northern Region Central Region(Main Office) Southern Region 4800 Enterprise Way 1990 E.Gettysburg Avenue 2700 M Street,Suite 275 Modesto,CA 95356.8718 Fresno,CA 93726-0244 Bakersfield,CA 93301-2373 Tel:(209)557-6400 FAX:(209)5576475 Tel:(559)230.6000 FAX:(559)230-6061 Telt(661)326.6900 FAX:(6611326.6985 www.valleyair.org Mr Tachett Page 2 of 3 S-07-092 San Joaquin Valley. A concerted effort should be made to reduce project-related emissions as outlined below: Applicable District Rules Based on the information provided, the proposed project may be subject to the District rules identified below. These rules have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. This project may be subject to additional District Rules not enumerated below. To identify additional rales or regulations that apply to this project, or for further information, the applicant is strongly encouraged to contact the District's Small Business Assistance Office at (559) 230-5888. Current District rules can be found at www.valleyair.org/rules/1 ruleslist.htm. Regulation Vlll (Fugitive PM10 Prohibitions) Rules 8011-8081 are designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including construction and demolition activities, road construction, bulk materials storage, paved and unpaved roads, carryout and track out, landfill operations, etc. The District's compliance assistance bulletin for, construction sites can be found at www.valleyair.org/busind/comply/PM10/Req VIII CAB.pdf. Rule 4102 (Nuisance) This rule applies to any source operation that emits or may emit air .contaminants or other materials. In the event that the project or construction of the project creates a public nuisance, it could be in violation and be subject to District enforcement action. Rule 4601 (Architectural Coatings) This rule limits volatile organic compounds from architectural coatings by specifying architectural coatings storage, clean up and labeling requirements and applies to any person who supplies, sells, offers for sale, applies, or solicits the application of any architectural coating. Rule 4641 (Cutback, Stow Cure, and Emulsified Asphalt, Paving and Maintenance Operations) If asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emuisified asphalt for paving and maintenance operations. Rule 9510 (Indirect Source Review) This rule was adopted to reduce the impacts of growth in emissions from all new development in the San Joaquin Valley.. Rule 9510 requires applicants subject to the rule to provide information that enables the District to quantify construction, area and operational PM10 and NOx emissions, and potentially mitigate a portion of those emissions. Rule 9510 requires construction exhaust emissions to be reduced by 20 percent for NOx and 45 percent for PM10 and operational emissions to be reduced by 33.3% for NOx and 50% for PM10 when compared to the statewide fleet average. An application must be filed with the District no later than concurrent with application with' a local agency for the final discretionary approval. For more information and instruction, please contact the District's ISR staff by phone at (559) 230-6000 or by email at ISR(cD_valleyair.org. Mr. rackett Page 3 of 3 S-07-092 Recommended Mitigation Measures The District encourages innovation in measures to reduce air quality impacts. There are a number of features that could be incorporated into the design/operation of this project to provide additional reductions of the overall level of emissions. The suggestions listed below should not be considered all-inclusive and are options that the agency with the land-use authority should consider for incorporation into the project. Large canopy trees should be carefully selected and located to protect the building(s) from energy consuming environmental conditions, and to shade 50% of paved. areas within 15 years. For more information see Tree Guidelines for San Joaquin Valley Communities at www.lgc.org/bookstore/energy/downloads/siv tree quidelines.pdf. If transit service is available to the project site, improvements should be made to encourage its use. If transit service is not currently available, but is planned for the area in the future, easements should be reserved to provide for future improvements such as bus turnouts, loading areas, route signs and shade structures. As many energy conserving and emission reducing features as possible should be included in the project. ' Energy conservation measures include both energy conservation through design and operational energy conservation. District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions" or require further information, please call Jon Klassen at (559) 230-5843 and provide the reference number at the top of this letter. Sincerely, David Warner Director of Permits Services Arnaud Marjollet Permit Services Manager DW: jk cc: Eric Bower, BMY Construction Group Inc. File BOARD OF EDUCATION Carol Mills,J.D., President �'. Valerie F. Davis,Clerk ` Fresno Unified Michelle A.Asadoorian Lindsay Cal Johnson School District Manuel G Nunez District Janet Ryan An Equal Oppornu itvEmplorer Tony Vang, Ed.D. b� June 4 2Q07 �.� SUPERINTENDENT ' Michael E. Hanson Will Tackett, Planner City of Fresno Planning&Development Department 11� 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 Re: Project Number: S-07-092 Dear Mr.Tackett, This letter is in response to your request for school district information regarding the construction of a new 8,178 square foot veterinary facility, along with 3 other retail and commercial buildings. The project is located on the corner of East Ashlan and North Barton Avenues,west of State Route 168. Any new commercial/industrial development which occurs, may ultimately affect the District by generating employees. The children of those employees living in the District will need to be housed in District schools. The Fresno Unified School District levies a commercial/industrial development fee of$.42 per square foot. Any new development on the property will be subject to the development fee prior to issuance of a building permit. Thank you for the opportunity to comment. Please contact me at(559)457-3074,if you have any questions or require additional information regarding our comments. Sincerely, Lisa LeBlanc,Executive Director Facilities Management and Planning LL:ab c: BMY Const. Group,Inc.,Applicant/Agent File(2) 2309 Tulare Street Fresno,CA 93721-2287 www.fresno.klZ.ca.us COQ j' Airport Land Use Commission O 1856 Regular Hearing Agenda Item No. 2 October 1 , 2007 SUBJECT: Determine whether City of Fresno Rezone Application No. R-07-33 is Consistent with the Adopted Fresno Air Terminal Land Use Compatibility Plan STAFF CONTACT: John Adams, Planner (559) 488-3933 Margie McHenry, Senior Planner . (559) 262-4870 RECOMMENDATION: Staff recommends that the Commission: ' • State that the Commission has reviewed and considered the Environmental Assess ment/lnitial Study Mitigated Negative Declaration and Checklist filed in response to the requirements of the California Environmental Quality Act. • Determine that City of Fresno Rezone Application No. R-07-33 is consistent with the Airport Land Use Commission's Fresno Air Terminal Land Use Compatibility Plan subject to the conditions.incorporated into the recommended General Nuisance/Avigation Easement and Agreement. BACKGROUND: Since July 1, 1983, California Public Utilities Code Section 21676 requires that local agencies submit a copy of all proposed or revised land use plans in areas covered by an airport land use compatibility plan to the Airport Land Use Commission (Commission).. The Commission is charged with making a determination of consistency with the adopted airport land use compatibility plan. ENVIRONMENTAL DETERMINATION: The City of Fresno, as the Lead Agency, is responsible for preparing the environmental documentation for this project. The Airport Land Use Commission is a Responsible Agency and must review.and consider the environmental effects as identified by the Lead Agency, .prior to acting upon the proposal. 2220 Tulare Street.Sixth Floor Fresno,California 93721/Phone(559)2624055126240291262-43021262-4022/FAX 2924893 Equal Employment Opportunity•Affirmative Action•Disabled Employer Airport Land Use Commission October 1, 2007 Page 2 The City of Fresno has prepared an Initial Study and Environmental Checklist and has determined that through application of mitigation measures the project will not have a significant adverse effect on the environment. (Initial Study Mitigated Negative Declaration and Environmental Assessment Checklist are attached as Exhibit "H"). DISCUSSION City of Fresno Rezone Application No. R-07-33 proposes to rezone a 2.01-acre area from the M-1/cz (Light Manufacturing/with conditions of zoning) Zone District to the M-1 (Light Manufacturing) Zone District. The proposed rezoning is to accommodate a planned four-lot industrial development comprised of an 8,178 square-foot Abby animal hospital and shelter, and 16,469 square feet of shell industrial building space within three buildings proposed for future office, warehouse, and retail purposes. The subject property is located on the southeast corner of the intersection of E. Ashlan and N. Barton Avenues and approximately 6,795 feet northwest of the northwest end of the main runway of the Fresno Air Terminal and within the review area of the Commission's Plan (Exhibit "A„) Based upon its location within the Review Area, and in accordance with Section 21670 et seq., of the California Public Utilities Code, the project has been submitted to the Commission for a determination of consistency with the adopted Airport Land Use Compatibility Plan (ALUCP). There are four considerations in a finding of consistency with-the Commission's Plan: 1. Noise: The project site is located within the 70-75 dB CNEL Contour (Exhibit "B"). The Airport/Land Use Noise Compatibility Criteria Table 1 lists uses to be allowed together with uses to be avoided in the 70-75 dB CNEL Contour and Interior Noise Level Reduction (dBA) Table 2 lists noise reduction conditions that should be required (see Exhibits "C" and "D"). These listed uses are identified as normally acceptable, marginal (acceptable only by Commission determination), normally unacceptable, and clearly unacceptable. The following summarizes Tables 1 and 2: Normally Acceptable General manufacturing, utilities, extractive industry, cropland Noise is a factor to be considered. in that slight interference with outdoor activities may occur. Conventional construction methods will eliminate most noise intrusions upon indoor activities. The Interior Noise Level Reduction (dBA) Table 2 (Exhibit"D") recommends reducing the interior noise levels by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low. Marginal Transportation, parking, cemeteries, service commercial, wholesale trade, warehousing, light industrial, golf courses, riding stables, water recreation The indicated noise exposure will cause moderate interference with outdoor activities and with indoor activities when windows are open. Uses that fall within this category must be reviewed on a case by case basis by the Commission. The Commission may determine the land use to be acceptable under conditions Airport Land Use Commission October 1, 2007 Page 3 where outdoor activities are minimal and norma[ construction features provide sufficient noise attenuation [e.g., installation of air conditioning so that windows can be kept closed]. Under other circumstances, the land use should be discouraged_ New construction or development should be undertaken only after a detailed analysis of noise reduction requirements is made and needed noise insulation features included in the design. The Interior Noise Level Reduction (dBA) Table 2 (Exhibit "D") recommends reducing the interior noise levels by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low. Normally Unacceptable Offices, retail trade, livestock breeding, parks, playgrounds, zoos, outdoor spectator sports Noise will create substantial interference with both outdoor and indoor activities.. Noise intrusion upon indoor activities can be mitigated by requiring special noise insulation construction. Land uses which have conventionally constructed structures and/or involve outdoor activities which would be disrupted by noise should generally be avoided. The Interior Noise Level Reduction (dBA) Table 2 (Exhibit "D") recommends reducing the interior noise levels by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low. Clearly Unacceptable Single-family detached and duplexes, multi-family and transient lodging, ;[ mobile homes, schools, libraries, hospitals, nursing homes, churches, auditoriums, concert halls, amphitheaters Unacceptable noise intrusion upon land use activities will occur. Adequate structural noise insulation is not practical under most circumstances. The indicated land use should be avoided unless strong overriding factors prevail and it should be prohibited if outdoor activities are involved. Except when overriding circumstances exist, the ALUCP requires the dedication of a General Nuisance/Avigation Easement to the airport operator or the City of Fresno as a condition of approval for any residential zoning change within the Airport's review area. To ensure continued compliance with the recommended noise levels, a General Nuisance/Avigation Easement and Agreement should be required to reduce the interior noise levels by at least 25dBA in the normally acceptable, marginal, and normally unacceptable uses listed above with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive areas where noise levels are low. Also, to ensure continued compliance with the recommended noise levels, a General Nuisance/Avigation Easement and Agreement should be required to prohibit the clearly unacceptable uses listed above. With these limitations in place, the proposal can be found to be consistent with the noise regulations of the adopted ALUCP. Airport Land Use Commission October 1, 2007 Page 4 2. Airspace Protection The project site is located within Safety Zone III, (approach surface) established via Part 77, Subpart C, of the FAR. Pursuant to FAR and the Airport/Land Use Safety Compatibility Criteria (Exhibit "F") the approach surface is designated to protect airspace for a horizontal distance of 10,000 feet from the end of the runway extended at a slope of 50 to 1 in the vicinity of the project, as measured from the stated elevation of the runway surface. The proposed M-1 Zone District limits buildings or structures to a maximum height of 50 feet (see City of Fresno Municipal Code Section 12-226.5.D attached as Exhibit"E"), but allows exceptions under determination by the Planning Commission. Conditions should, therefore, be required to limit the height of all structures and trees to comply with those imposed by FAR and to allow ongoing ingress and egress for the purpose of removing, marking or lighting objects, including trees, which may penetrate any surface as described under Part 77. To ensure continued compliance with FAR, a General Nuisance/Avigation Easement and Agreement should be required to limit all structures and trees to the 50-foot maximum height requirement of the proposed M-1 Zone District. In addition, a condition should be imposed to require compliance with the FAR Part 77 regulations for the approach surface, for any exceptions to the 50-foot height limitation considered by the City Planning Commission. A condition should also be required to allow ongoing ingress and egress for the purpose of removing, marking or lighting objects, including trees, which may penetrate any surface as described under Part 77. With these limitations in place, the proposal can be found to be consistent with the Airspace Protection provisions and intent of the adopted ALUCP. 3. Safety The project site, which is proposed for M-1 (Light Manufacturing District) development, is located within the Airport Review Area of the Compatibility Plan. The area of review is known as Safety Zone III of the Airport. Table 3 "Airport/Land Use Safety Compatibility Criteria" of the Plan, and the California Airport Land Use Planning Handbook (Handbook) List uses to be allowed together with uses to be avoided in Safety Zone III (see Exhibit "F"). The Compatibility Plan and Handbook provide a framework for determining compatibility that can be applied in considering uses to ensure safety while allowing flexibility necessary to create mixed- use developments. These listed uses are identified as acceptable, marginal and unacceptable within Safety Zone III. The following summarizes Table 3: Acceptable Other uses not in structures Use is acceptable with little or no risks. Marginal Residential density no greater than 2 dwelling units per acre and no schools, hospitals, nursing homes, or similar uses Airport Land Use Commission October 1, 2007 Page 5 Risks exist for land use proposals that fall within this category and must be reviewed on a case-by-case basis by the Commission. The Commission may determine the use to be acceptable under the conditions cited in Table 3. Unacceptable Distracting lights or glare, sources of smoke or electronic interference, attractor of birds Use is unacceptable due to associated high risks. The California Airport Land Use Planning Handbook (Exhibit "F"), lists basic compatible qualities for Zone 3. The Handbook recommends limiting residential uses to very low densities (if not deemed unacceptable because of noise); prohibiting children's schools, large day care centers, hospitals and nursing homes; and avoiding nonresidential uses havinn moderat or higher usage . .}2iS•ti2S such as mai or shopping Centers, {last {G Gd, i„ uL r , ILi j restaurants, theaters, meeting halls, buildings with more than three aboveground habitable floors and hazardous uses such as aboveground bulk fuel storage. Conditions have been recommended in order to ensure that the safety concerns are addressed. Based on the M-1 Zone District restrictions of the project site (see Exhibit 'D') and the conditions recommended to ensure density and safety concerns are addressed, the proposal can be found to be consistent with the safety regulations of the adopted ALUCP. 4. General Nuisance/Avigation'Easement and Agreement Except when overriding circumstances exist, the ALUCP requires the dedication of a General Nuisance/Avigation Easement to the airport operator or the City of Fresno as a condition of approval for any residential zoning change within the Airport's review area. The Avigation Easement should conform to standards contained in the current Handbook (attached as Exhibit "G") and include all conditions recommended in the four considerations. Recordation of a General Nuisance/Avigation Easement and Agreement will ensure the ability to enforce FAR Part 77 restrictions and safety conditions. With the recordation of this document, the proposal can be found to be consistent with the adopted ALUCP. CONCLUSION: Staff believes that the proposal can be found to be consistent with adopted Airport Land Use Compatibility Plan standards related to noise, airspace protection, safety, and general nuisance/avigation easement and agreement subject to the recommended conditions and, therefore, recommends that the Commission: • State that the Commission has reviewed and considered the Environmental Assessment/Initial Study Mitigated Negative Declaration and Checklist Filed in response to the requirements of the California Environmental Quality Act. • Determine that City of Fresno Rezone Application No. R-07-33 is consistent with the Airport Land Use Commission's Fresno Air Terminal Land Use Corripatibility Plan subject to the conditions incorporated into the recommended General Nuisance/Avigation Easement and Agreement: 1. A General Nuisance/Avigation Easement and Agreement shall be required to include: Airport Land Use Commission October 1, 2007 Page 6 (a) Enforce conditions related to adopted noise criteria as stated in the Fresno Air Terminal Land Use Cornpatibility Plan as follows: 1. General manufacturing, utilities, extractive industry, transportation, public parking, cemeteries, service commercial, wholesale trade, warehousing, light industrial, golf courses, riding stables, water recreation, offices, retail trade, livestock breeding, parks, playgrounds, zoos, and outdoor spectator sports uses shall have interior noise levels reduced by at least 25dBA with noise insulation in those portions of buildings where the public is received such as office areas and noise sensitive.areas where noise levels are low. 2. Single-family detached and duplex residential development, multi- family residential development and transient lodging, mobile homes, schools, libraries, hospitals, nursing homes, churches, auditoriums, concert halls, and amphitheaters shall be prohibited. (b) Enforce conditions related to adopted airspace protection criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan as follows: 1. Limit all structures and trees to the 50-foot maximum height requirement of the proposed M-1 Zone District and imposed by FAR. 2. Limit all structures and trees to comply with the FAR Part 77 regulations for the approach surface, for any exceptions to the 50-foot height limitation considered by the City Planning Commission. 3. Allow ongoing ingress and egress for the purpose of removing, marking or lighting objects, including trees, which may penetrate any surface as described under FAR Part 77. (c) Enforce conditions related to adopted safety criteria as stated in the Fresno Air Terminal Land Use Compatibility Plan as follows: 1. On-site improvements and uses such as distracting lights or glare, sources of smoke or electronic interference, and uses that attract birds shall be prohibited. 2. Uses that concentrate occupants with limited mobility such as schools, large day-care centers, hospitals, nursing homes, or similar uses shall be prohibited. 3. Industrial/Manufacturing uses such as petroleum bulk plants shall be prohibited. 4. Commercial/Retail Trade uses having moderate or higher usage intensities such as major shopping centers, theaters, meeting halls and buildings with more than three aboveground habitable floors shall be prohibited. 5. Restaurant development shall be limited to one, 4,000 square-foot maximum, restaurant. 6. Public and Quasi-Public Services such as solid waste transfer stations shall be prohibited. NOTES: The following notes reference mandatory requirements of Fresno County or other agencies and are provided as information to the project applicant. Airport Land Use Commission October 1. 2007 Page 7 1. The Western Regional Office of the Federal Aviation Administration encourages the filing of an FAA Form 7460-1, Notice of Proposed Construction or Alteration in conjunction with the permitting of projects in the area of an airport to ensure compliance with Part 77 of the Federal Aviation Regulations (FAR). 2. In accordance with FAR 77, Subpart C and the Airspace Protection Policies of the Fresno Air Terminal Land Use Compatibility Plan the following must be met: (a) No structure, tree or other object shall be permitted to exceed the height limits established in accordance with Part 77, Subpart C, of the Federal Aviation Regulations (FAR). This criterion applies unless, in the case of a proposed object or growing tree, one or more of the following conditions exist: 1. The object would be substantially shielded by existing permanent structures or terrain in a manner such that it clearly would not affect the safety of air navigation; 2. The FAA has conducted an aeronautical study and either determined that the object would not result in a hazard to air navigation or made recommendations for the object's proper marking and lighting as an obstruction; 3. The object is otherwise exempted from the requirements of FAR Part 77. In the case of an existing object, this criterion also applies unless the object exceeded the prescribed height limits prior to February 20, 1987, in which case, marking lighting will still be required. (b) No object shall be perm iitted to be erected which because of height or other factors would result in an increase in the minimum ceiling or visibility criteria for an existing or proposed instrument approach procedure. (c) Civil Airport Imaginary Surfaces described at Code of Federal Regulations Title 14, Part 77, Subpart C "Obstruction Standards," shall be used in conjunction with the above airspace conditions to determine whether the height of an object is acceptable. G:\4360Devs&Pin\PLANNING\AVIATION\ALUC\2007 materials\10-1-07 Hearing\Agenda Item 2\Agenda Item 2 R-07-33.doc BMCONSTHUCTION GROUP INC. B 0 w E R * M ITC H ELL ♦ YEMOTO City of Fresno Planning Department Re: Abby Pet Hospital APN#'s 438-021-21 and 09 Subject: Operational Statement Current Use of the property: 1. Bare vacant lot in with one residential house on it. Proposed initial use of new building and site: 1. The,ha ure o" nifiaT fa—yTneduse is for a veterinary clinic. 2. No products will be manufactured or produced by the operaticn'.7 3. Minimal products will be sold on site such as flea collars and veterinary-reeaf6UprodUdts 4. yThe building will be fully fire sprinklered with a NFPA wet metal pipe fire sp661 `er system and shall be designed by a licensed fire sprinkler contractor and meet all required codes. 5. The site will be used for general parking and deliveries. 6. The site will be fully landscaped per the plan submitted. 7. The proposed operational time limits will be 12 months per year and day@ paF w@@krtypically between the 8. Tha-quan ity o em oiO yeeser Ii�g a e: ��r. 1. iRR ._ 1q.YeQ3J__ `—.� 9. No employees will live on site. 10. Equipment used on site will consist of veterinary related equipment. 11. Very low to no noise levels. 12.-HazamT"o`us w0 wi{I be'ge erala re a e o ve eriiiary'prac ices ri - cense azar flus v� .. :`u - ycle) wli �c o am .. roe ret �., jeJb gain &W .�.. �..� Potential use of future buildings and site. 1. Potential use of the buildings B, C and D will be for general office space and/or retail and/or warehouse-storage. Should you need any additional information or have any questions, please contact BMY Construction Group, Inc. at(559) 243-4200. Respectfully submitted, BConstruction Group, Inc. ric Bower Principal Copy: Project Owner 5493 E. Olive Ave. • Fresno, CA 93727 • Phone(559) 243-4200 Fax(559) 222-2380 Page 1 of 1 S i ?A MEMO 1.�i G BTE FM fl,LII, TO: Rick Lyons, FMFCD CC: Will Tackett City of Fresno,Planning FROM: Bob Madewell DATE: June 28,2007 RE: FMFCD Notice of Requirements of r Parcel Map 2007-12 Located at the SE comer of Ashlan and Barton Ave.,Fresno Rick, I have received your Notice of Requirements for Parcel Map 2007-12,ABBY PET HOSPITAL and wish to request that you revise the conditions based on the following: The Exhibit(Exhibit 1)that is contained in your response does not accurately reflect the location of outlets that exist at the location.Your exhibit shows an 18"line running north to south across Ashlan ave.to a single inlet.However just to the south of the south return of the SE comer of Ashlan and Barton,there is an existing FMFCD Type D inlet.Verified both visually and by our survey. Next,there is an existing FMFCD type D inlet located at the east side of Barton Ave.at the intersection of Hampton Ave.This inlet is not shown on your exhibit but was verified visually at the site. Finally,your Exhibit 2 references your records not showing a continuous curb and gutter to convey runoff to the inlet located at Hampton and Cedar.As I mention in the previous paragraph, you have an inlet at Hampton and Barton that would collect any water added to the system by our project.Regardless,there now exists,curb and gutter the full length of Hampton Way from Barton to Cedar on both the north and south sides of the street.This was visually verified. Would you please update your Notice of Requirements on this project,based on the information provided,and provide us and the City of Fresno with an updated response.Thank you. Civil En,,ineer� • Lend SUrveyors e 111111ierS 20211 N. Gateway 0 FTcsno, CA 93727 0 (559) 25-2-72.13 0 FAX (559) 252-47+6 FRESNO YOSEMITE International Airport Vesting Tentative Parcel Map 2007-12 Subject property is located at 4166 N. Barton Avenue on the south side of Ashlan Avenue between Barton Ave & Freeway 168. The property is approximately 6,750 feet northwest of runway 11L-29R of the Fresno Yosemite International Airport. The proposed Light Manufacturing (M-1) use lies within the 70-75 CNEL noise contours, Light Industrial lying within this CNEL contour is classified as Conditionally Acceptable, and Offices/Retail commercial is classified as Normally Unacceptable. An avigation easement is also required. Supplemental information 1. 70-75 CNEL Noise Contour Line, identified in the Fresno Yosemite International Airport Master and Environs Specific Plan 2. Approach Protection Zone III (APZ-3) identified in the Fresno Yosemite International Airport Master and Environs Specific Plan 3. Safety Zone 4: Outer Approach/Departure Zone of the California Airport Land Use Planning Hand Book, published by the State of California— Department of Transportation (Division of Aeronautics). 4. Federal Aviation Administration's (FAA)Part 77 Objects Affecting Navigable Airspace imaginary surfaces height requirements. As stated on Table E-1 of the Fresno Yosemite International Airport and Environ Plan CNEL 70-75 —Commercial and Industrial (Service commercial, wholesale commercial, warehousing, light industrial) are Conditionally Acceptable. Conditionally Acceptable - The indicated noise exposure will cause moderate interference with outdoor activities when windows are open. The land use is acceptable, on the conditions that outdoor activities are minimal and that construction features which provide sufficient noise attenuation are used (e.g., installation of air conditioning so that windows can be dept closed). Under other circumstances, the land use should be discouraged. As stated on Table E-1 of the Fresno Yosemite International Airport and Environ Plan CNEL 70-75 —Commercial and Industrial (Offices, retail Commercial) are Normally Unacceptable. Normally Unacceptable—Noise will create substantial interference with both outdoor and indoor activities. Noise intrusion upon indoor activities can be mitigated by requiring special noise insulation construction. Land uses which have conventionally constructed structures and/or which involve outdoor activities which would be disrupted by noise should generally be avoided. An avigation easement is also required. FRESNO YOSEMITE International Airport As stated in the adopted Fresno Yosemite International Airport and Environ Plan Table E-2 (Safety Compatibility Criteria) Approach Protection Zone III (APZ-3): Other uses in structure—No schools, hospitals, nursing homes, large residential support facilities, large child day care centers, adult day care facilities, churches, auditoriums, concert halls, amphitheaters, or other uses that would concentrate a large number of people. Special Characteristics (Distracting Lights or Glare), Sources of Smoke or Electronic Interference, and Attractors of Birds are UNACCEPTABLE. As stated in the California Airport Land Use Planning Hand Book, published by the State Of California—Department of Transportation (Division of Aeronautics), TABLE 913, Page 9-44 and 9-45: Zone 4: Outer Approach/Departure Zone Basic Compatibility Qualities $ In undeveloped areas, limit residential uses to very low densities (if not deemed unacceptable because of noise); if alternative uses are impractical, allow higher densities as infill in urban areas. Avoid nonresidential uses having moderate or higher usage intensities (e.g., major shopping centers,fast food restaurants, theaters, meeting halls, building with more than three above ground habitable floors are generally unacceptable) Prohibit children's schools, large day care centers, hospitals, nursing homes In addition any permanent or temporary object that penetrates a 100:1 slope from runway I IR-29L of the Fresno Yosemite International Airport would require Form 7460 to be filed with the FAA as per the Part 77 Objects Affecting Navigable Airspace. TENTATIVE PARCEL MAP NO. 2007-12 GOVERNMENT CODE §66020(d)(1) A protest filed pursuant to subdivision (a) shall be filed at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations, or other exactions to be imposed on a development project. Each local agency shall provide to the project applicant a notice in writing at the time of the approval of the project or at the time of the imposition of the fees, dedications, reservations, or other exactions, a statement of the amount of the fees or a description of the dedications, reservations, or other exactions, and notification that the 90-day approval period in which the applicant may protest has begun. Improvements and payments shall not be required on or in front of any undeveloped portion of a net acreage of ten acres or more which exists after the division of land. All improvements and payments to be completed with development. SEWER CONNECTION CHARGES FEE RATE a. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth) b. Oversize Charge► $0.05/sq. ft. (to 100' depth) c. Trunk Sewer Charge N/A Service Area: d. Wastewater Facilities Charge S.T.E.P.♦ e. Copper Avenue Sewer Lift Station Charge► N/A f. Fowler Trunk Sewer Interim Fee Surety► N/A g. House Branch Sewer Chargee N/A h. Millbrook Overlay Sewer* N/A WATER CONNECTION CHARGES FEE RATE i. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. j. Frontage Charge* $6.50/lineal foot k. Transmission Grid Main Charge* $804/net acre (parcels under 5 gross acres) I. Transmission Grid Main Bond Debt Service Charge w► $304/net acre (parcels under 5 gross acres) m. UGM Water Supply Feev N/A Service Area: n. Well Head Treatment Feev N/A Service Area: o. Recharge Feev N/A Service Area: 201 q. 1994 Bond Debt Service* N/A Service Area: 201 CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE q. Fire Facilities Impact Fee - Citywide$" $150/1000sq.ft t r. Park Facility Impact Fee - Citywidef** N/A s. Quimby Parkland Dedication Feev'* N/A t. Police Facilities Impact Fee - Citywidef $442/1000sq.ft t u. Traffic Signal Charge* $41.47/ADT t URBAN GROWTH MANAGEMENT FEE RATE v. Major Street Charge* N/A Service Area: w. Major Street Bridge Charge* N/A Service Area: x. UGM Grade Separation Fee* N/A Service Area: y. UGM Trunk Sewer Charge* N/A Service Area: z. Street Acquisition/Construction Chargee N/A Notes: Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.6 Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit Equivalents. " Fee applicable to all maps accepted for filing after August 30,2005 ♦ Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). 4 Due at time of development A► Deferrable through Fee Deferral Covenant. T Due at time of subdivision. f Due at occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. Street Name Review TPM-2007-12 6-14-07 Street Name Status Required Change East Ashlan Avenue Good North Barton Avenue Good CITY OF FRESNO MITIGATED NEGATIVE DECLARATION Initial Stud is on file in the Planning and Environmental L 20 Y 9 Development Department, City Hall Assessment Number: 2600 Fresno Street, Fresno, California 93721 R-07-33/S-07-921TPM- JUL 3 0 2007 559 621-8277 2007-12 APPLICANT: Richard & Marian Holm Assessor' ')/RES NO COUNT( CLERK 2054 Lester AvenueParcel Number(s): Clovis, CA 93619 438-021-09 & 21 PROJECT DESCRIPTION AND LOCATION: BMY Construction Group, Filed with: The Vernal Group and Rabe Engineering, Inc., on behalf of Richard and Fresno County Clerk Marian Holm, property owners, have filed Rezone Application No. R-07-33, 2221 Kern Street Site Plan Review Application No. S-07-92 and Vesting Tentative Parcel Map Fresno, CA 93721 No. 2007-12 pertaining to approximately 2.01 acres of property located on the southeast corner of the intersection of East Ashlan and North Barton Avenues. Rezone Application No. R-07-33 proposes to rezone the subject property from the M-1/cz (Light Manufacturing/with conditions of zoning) zone district to the M-1 (Light Manufacturing) zone district. Vesting Tentative Parcel Map No. 2007-12 and Site Plan Review Application No. S-07-92 propose a four-lot integrated industrial development on the subject property comprised of an 8,178 square-foot Abby animal hospital and shelter; and, 16,469 square feet of shell industrial building space within three buildings proposed for future office, warehouse, and retail purposes. The proposed project has been evaluated with respect to each item on the attached environmental checklist. This completed checklist reflects comments of any applicable responsible agencies and research and analysis conducted to examine the interrelationship between the proposed project and the physical environment. The information contained in the Environmental Assessment Application, the checklist, and any attachments to the checklist, combine to form a record indicating that an initial study has been completed in compliance with the State CEQA Guidelines and the California Environmental Quality Act. Any rating of "2" on the checklist indicates that a specific adverse environmental effect has been identified in a category which is of sufficient magnitude to be of concern. Such an effect may be inherent in the nature and magnitude of the project or may be related to the design and characteristics of the individual project. Effects rated in this manner are not sufficient in themselves to require the preparation of an Environmental Impact Report and/or have been mitigated to the extent feasible. All new development activity and many non-physical projects contribute directly or indirectly toward a cumulative impact on the physical environment. The incremental effect contributed by this project toward such a cumulative effect is not considered substantial in itself. The proposed project is not expected to result in any significant adverse effects in terms of the factors considered on the environmental checklist, including any such factors for which minor effects have been identified. Cumulative effects of a significant nature are also not expected. The proposed project will not result in any adverse effects which fall within the "Mandatory Findings of Significance" contained in Section 15065 of the State CEQA Guidelines. The finding is therefore made that the proposed project will clearly not have a significant adverse effect on the environment. This Mitigated Negative Declaration will be deemed final and effective if no appeal is filed in the manner specified by Section 12-505 of the Fresno Municipal Code. INITIAL STUDY PREPARED BY: Will Tackett SUBMITTED BY: Planner Drw.egP6'(4 DATE: July 27, 2007 Darrell Unruh, Planning Manager PLANNING AND DEVELOPMENT DEPARTMENT ENVIRONMENTAL ASSESSMENT(EA) CHECKLIST POTENTIAL ENVIRONMENTAL EFFECTS EA NO. R-07-33/S-07-92/TPM-2007-12 1.0 TOPOGRAPHIC, SOIL,GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities(on or 1 2.1 Substantial indirect source of pollution off site) 1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas 1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation 1 2.4 Generation of dust except during construction 1 2.5 Adverse local climatic changes 12.0 HAZARDS 1 12.1 Risk of explosion or release of hazardous 3.0 WATER substances 1 3.1 Insufficient ground water available for long-term project 1 12.2 Site subject to flooding use 1 12.3 Adverse change in course of flow of flood waters 1 3.2 Use of large quantities of ground water 2 12.4 Potential hazards from aircraft accidents 1 3.3 Wasteful use of ground water 1 12.5 Potential hazards from landfill and/or toxic waste 1 3.4 Pollution of surface or ground water supplies sites 1 3.5 Reduction in ground water recharge 13.0 AESTHETICS 4_0 PLANT LIFE 1 13.1 Obstruction to public or scenic vista or view 1 4.1 Reduction of the numbers of any unique, rare or 1 13.2 Creation of aesthetically offensive conditions endangered species 1 13.3 Removal of street trees or other valuable 1 4.2 Reduction in acreage of agricultural crop vegetation 1 4.3 Premature or unnecessary conversion of prime 1 13.4 Architectural incompatibility with surrounding area agricultural land 14.0 HISTORICAL/ARCHAEOLOGICAL 5_0 ANIMAL LIFE 1 14.1 Removal of historic building, disruption of 1 5.1 Reduction in the numbers of any rare, unique or archaeological site endangered species 1 14.2 Construction or activity incompatible with adjacent 1 5.2 Deterioration or displacement of valuable wildlife habitat historic site 6_0 HUMAN HEALTH 15.0 ENERGY 1 15.1 Use of substantial amounts of energy or fuel 7_0 NOISE 1 15.2 Substantial increase in demand upon existing 1 7.1 Increases in existing noise levels sources of energy 1 7.2 Exposure to high noise levels 1 15.3 Wasteful use of energy 8.0 LIGHT AND GLARE EXPLANATION OF RATINGS 1 8.1 Production of glare which will adversely affect "0" Insufficient Information residential areas Insufficient information is available to determine the 1 8.2 Exposure of residences to high levels of glare potential environmental effects which may result from the 9.0 LAND USE proposed project in this category. 2 9.1 Incompatibility with adopted plans and policies 1 9.2 Acceleration of growth rate "1" No significant Environmental Effect 1 9.3 Induces unplanned growth The proposed project will not have an adverse 1 9.4 Adverse change in existing or planned area environmental effect in this category, or any such effect is characteristics not substantially unusual or of undesirable magnitude. This rating is also utilized in cases where the category is 10.0 TRANSPORTATION AND CIRCULATION not applicable to the particular project under consideration. 1 10.1 Generation of vehicle traffic sufficient to cause capacity `•2" Moderate Environmental Effect deficiencies on existing street system The proposed project will have an adverse environmental 1 10.2 Cumulative increase in traffic on a major street for which capacity deficiencies are projected effect in this category, which is of sufficient magnitude to 1 10.3 Specific traffic hazard to motorists, bicyclists, be of specific concern. However, this effect is not pedestrians substantial enough in itself to require the preparation of an 1 10.4 Routing of non-residential traffic through residential area Environmental Impact Report, and is mitigable through 1 10.5 Insufficient or poorly located parking project changes and conditions. 1 10.6 Substantial increase in rail and/or air traffic "Y' Significant Adverse Environmental Effect The environmental effect identified in this category substantiates in itself or contributes towards a finding that the proposed project has a potentially significant adverse effect on the environment sufficient to require the preparation of an Environmental Impact Report. o LL. X X X 0 N W N � m 0 a: Li � a a) m T� U _a `o °- Q r ca ° aZ I I W �_ �_ �_ w LL Um ° me ° me ° 0'c m m m Q D n o c E U) o c E c c E W ,� a ,� ca a Y :. ca a o a � o ��( 1-- --h or a) T- bac ° aca) � o..5a) C) QW .2 Cc/)- � U) cM � cnc0 � r (� ro n a � � -0 a � � -0 a O a_ CL cca0 0- CL cco0 a- - a cca0 Z C W oaa) oa) oaa) a ZZ > a- Ei > 2 > m W W o o o am o am co a) o aaa)i o CL -i CD a) o � J oc0 oc .0 .2 U) ate) o C0a W o �c a ° c a •° c n m -0 . r — ca ca ca ca o F— W _C a ;L o _ _ _ V Z �� C -. z ° o w a) c a) O ° O C rc ; C ° 0 a) N o 'C O T (n T QW O a) :E w = wcU) = wco •OmEcu ° O m ma) m ° c ++ > ai - ca N w (n D) O) d U OX .. w coa) N ° p3 � `° T� Uarn as > (n cc 0 moa) ZIL ° O O C L O (n O C U U a)C13 ca o co 5 O c 7 C 0 C a) ° c o ca -- a) (n . J � car- - c o oro Q N O ca c > U 3 m c0 um) v U c 2 a) c ° W 'O c - I— W O CO c-a caaE ui a) Fa iar a,CL mom `= u°iU) c°3 c Z LCL ea c � a ca � o o a) m U m o 'er c ai � c ui ao. N no c U c � c a3ir N � - c aa� � � U o c � c Eia qtr Z o cac� a) o � w �� Nw ca E O . ° w ° m me 0) I I O N g ° U c (D a) O a) L ° a m 2 c � (n'c (D CtS � ZC o c� c � oEy � c `nUca0 � c- > -0 mn >,� UD C N = ca O d p ca O C O U O � W m U C C (a cM > co o ° o.a o o � °� as cL c - ° a ca c w m ° W � '� � > c Cc �� (D00 c E3 E 3 m ami arm ow O cm W a)fn a) a) E J a7 a) > to Y cc m r (n C ca ` W Z a`niN a Ir c a)0 `n c c c a) - o -oay c ac) La a Arno c 1— a a) U ca C7- a) o o).E ca C7 a a O as C'3 .c a) c ooca (� N - £ N fA Q. a) a) O •W to °- a) E c a a) co CO > N a ti .72 � o LU 00 -o ° _ '- a)0 (DE 0 -° a) 0CC c � a� O E0c_c o 3 �N ° c ° E 3 �� � ° > in cc MMrn - "fc = _Tw Z c -0 o c `° '5 c � -a -0w .0 o cwt o� cL, (D a a) m a) IL Y T� v� f- U) -o (D -0 c c � -0 COc0 3 (n ° co- Lo " a� �C777 U C a)— C fa .-. .— C N — _J C C C a) a) '� O O Q) Q) Q ° O U > o a O O l7) a) -- r U a _>, U a� U or U aL ccaia a) U aas c Uw oN ° (D F- cscQ � ronca c`ac3 " � oQ � c ° a -_ EN E o ami 0 ca E o `a � 0 ro E LO w a) c ca E c o oo 3a> 'E m � E cv g 0)(13 - ) ca � o)o o � c` te a'- U ca u) a) o C 'c 7 a) N a) ca �, 0L-. Y L "d C� E CO N a) y co T c a) o N c 3 F- a U U) 0 -° U) d U ._ a is ca) aa)) � 'ccm 0-c ma) w-0 aa') � a�oiu u) a) o g E r E o y� u) o ca c°) 'o� U) o o N o ycA 3 ° Ep v ° cg _0) u°) a`� c ay U a) - Cl p -+ caa ° p_1N .0 > � a) o I � � C7 o(a c o Y ° o oho = O 0 - Qm Q .E w E co m a) a) a) s ' is Q) ca > m w a) co L] N '3 Q. L N ID Z a) d > E2 E Ea E - �� QE ¢ E ° EO fl EQ o C E � > o CL Q Z o c c > 3 o c c c ° o c c o c o .. (n c m O ca 0 L c a) o ca u) o ca a) o a)- Co = iso 0 tTE ° w mc `° EN0E a) cca °) r- Ec a) c `a � co 76 V c C -° D O E ._ a) 0 o E (n ° D o E c > O a) E O 3 c a) lii m > o LZ c'ca a) a) a m •O 0 - 1--O ~ r C t a).O a) O N c c ~' c I'4 ri c t o) (n C L' O C 'p O a) a) w E O a) C 2 (D ' O a) a) s U fl LL W ca z m U CL U) �._ m U ao - -a E m U o_ (n H ... ._ t` LL 0 0 N ti W X X N � ❑ X X cEd � m 0 N IL CU U Q o C- Q X X X X r ¢ m o a- z I I W W LL m e �- C'c n' C'c �- C'c Z ❑ oc � m a) a)oc '� m oc 'Em cn o cn o cn o cn o Q W i :� m n ik o a i :- � EC o n c J roa o roa O mEL o ma M aW � oo> > � om> � oo>> � orn > n� m n-C m n.0 m n9 m O OW .2cnc ❑ � � cnc0 ,; cnc0 � (nc0 > a CL � mo � rorocm5C: m m a ro0 a m0 CL a. m ❑ aa. coo Z p _ W 0ao-6aa) o ., W Z Z >a) > > 0) ° Z W m *-� W o _ o 000 .� to J Y W am0 amcc n� a) c o cdmmo m ,M � O Oa V SJ otocaa 0 Eidoocn Q1 ♦7. 7 U c m U m W Q U �_ o = n D O (0 m 1= d m omni a. nEF- W o U Z i m N O •ul p td m 0 td O a) Y -C > m c U m c N tOii >+ C m e m U" m e nm >.� cn _ > m a) 0 " m � 0 � .� c o rn � O O g (D a) c .2o �= `a '6 '& cca� m � L_ mm � Q J Z o c E '0 � m ro ca:r L S L c m �_ °�� m 'U CL Q W �' a' cco a� E m 3 •g'— o �� m > co o m cn m c H O ro > cn > .- � _ = m macro MCa oc ZL *• cn U) 'aoo � m � C%S .cm. m ° boa .00 (D CD rnCL 2 � � � iocv'i � U) En m � roo Z, co ca CES � � N O m C N N E mCL " N U L a) '= L O ON ao oio cmm ° T) o :o oLEo cn cnfnn wom >-o ca�- I I '0 v a-0 m > EL o m mew > 3 E U 0)c o cn �n 3 0 > m �_ aE 0 m > mc -0 v o - -0 p.o 0 0 N >o mY U > > Z cn ❑ vi � Nm mmscco `o Eo n _mo oC "' .0m CL U W cc Qo aim c �L= ro > E � mo -0 oc0 co coed m O -O 0 >•L W � m E � E CO) > aa) m U m c-0 Uva m m U m m 0 o U) m m 'i ro m 'o yd= a .. 0 c i ma N N fn 3 � ro moa`- � n cn m a' o c �n a) � '� 0 3 'a � E a -0 E cn -0 c � o m' U) c 0 � ` (n W m ti � � Com m � � 0 U '3 v m m no cL cn O U m � E 5 U c o o c m n - co ago c c m 0)m •U U.o V m a) n� Ccc, o .L - - E � m m m O d •C N N O 0 0 � � 0 E: — m cti r a cn y nm m m .ro CL � � o °� m c m ca m U IL H ` .o 0)CIS 00 +Lr, oL aEi ro E cn 0.¢ cL o o CB C a.0 o {.. Q U0 ccocn o > m mcn 00 (ao_ c c � mm m ,fid +. O m u) a? c O C .••' n' = ca (n id C E n Y m -_< E d N U U m-0 0) v oo nm 0 m mL c 0),o m— Ute ¢ o L .� o) o cco c a3 E E oho m U U: = � b m > c CD m c o.c mom _ m co3 p c C. C '- X c c o E E m `m c m ca o cn m — .. a 0 = w° mcoocn �m Ccn 00) — mE cn m N U O ca C C V O a= a) .C' m a5 cd m U ' cd C m - >+ m 0 m -o m cn c ca o o00 Co�� i `d E m 0 ;nom E � m �• o c o c ao ao E nro C-N w ca •U m 0 > U c d p U (n 0 d.0 cz ❑' C cn C c d -p U rn 0 m m m moN m e QE o c m m ai o m o m e c O N 0' C U m v m 0 Q C ` m N E y n c m n 0 m -0 :O •0 E a) 0 t e m OL '0 — co -0 O C a) E E O CL o = ro >> — I I 7 > L 0O Y C U ro 0-.- O Cc O m n O m m Tce ro m 0 — a) O -O o c co n0) nm Q O m L 0 O > CL m- c = Li C C -0 (ZLa N C C m _0 c•C O Z iia c m m o C m 0� m > a ° >,E = -C (D m C ro m O m on- Q L E o= m(6 0 m C 'V •� > m 3 . - c m m U E •- O C W m ' c c 3 (D o E m c n0 c E� m 3 ° ? r > m o cd m v roc No > 'Z � Eme �.Y0 � E_ aro � Z � ) ca ccnna) N m E °� cmn c o o .c ma ` U ' n 0 . m c C � ( ` 0 v 76ca �i c n� tD o 0 0 r; � : 0 c IL tumid ai -6mov, o , mUUE mem� cdE 0 LL 0 N rl W X X N ❑ X X m O ca U a) -o m m U a o � a x x � ¢ ro O ILz ro ro I I W r � _ W � Zm CL �c � 1, a> U ca ❑ Q C3 W a> v W � c ca yE - a'c CD a � � � � a) oro CV) CL � a_E ¢ ` m � E O Q W -E � m � � � o � m T U > >maai �� > O m ❑❑ LL ❑ cca0 Z W W F- �` FC— Q •r—n WW m Z c 0)Z 2 0) m m a. av J O O O O a as a� wQ U o cr. cr. � — o VZ i (D -0 -O c W O E 'O C C C N a) +: o `O Qj M to T LLJ a) — C U a) a CS O c a) c �' O E ro ro E E Z L �' ro ¢ a O O m0 cu o m E '� m a� 9 ro a m T m ¢ m a Q — Z m �' � m a� a� a aa) a>i iri ami E o f o CO o o c ro Q W ¢ 3 0. a0 CCD L ro ay c y c' a c>i ca ro a. � � o o cn - H �z LL T O a E c a > o � c m c ca a) cn � a. C uj ca a) roL UEro aciaci Ncroa oa oCD c gU ami � uci N w O a) me E E m c v cz v o cn roro n a) E o ac o CC Z O E o o a C 0. o L U a) ro o -p — U w a I N ca 0 c a a' M E ai a>i �7FD CO (D y 'cC c caa �) o y Z> E U ❑ .0 c cn C o ca L a ca o �.. U m a) a C o o a) o .� c o E cm a C o v m a) o Z ca ro roo ccnCa vi oa O C ro a) o m W U) ca ro a> c ❑ t o ca > a> n cn ro U a> s is °� _ CO a> W y E �a E o �' am a-- r iia o m > > U � FW— Eccco <o o � ro oma' a> > ro E vi n ro c � o ¢ - > a o c cn ca T a7 a� ro Cr N N Q � > " ui � aai C (D 3(j Lc O cc`c$ 0a) co � a0 y ro Q a� m 3 _ ti W cLD t ccn ;c� ro c -0L m - aZ - c � F- �o o mU rood. a) o > � ro cccaca " N E ca a> 0 -o co ca cca O C3) Ca c0 Ca - � o a3 C: ro o a) ro co CD ro - sa N Z ro a? a' c m o a ro E E cn a> °' ro U c � o c a C'3Y �°� C cn mr am m e c C £ C 'cu n it c CL `" � � a m a� N � aCn mi CL H � o E � a Ems `mom s �n E o � 0 CD � m Q o � E o C ro 0 - a) aa) 5 co ro x C E U) - CL- :3 cv- -- Ca row a Q! U ro ro a) L C cn '6 E U W C�C L ca ro O O O 'O - O F_ Z CD o > c °� — C O p a� ro o c c o ocn Ca <~ yin �� >,Ca aciccav� c '= = Q 'n a) o � -a oy > ro oaci 5 � m -o U � m- oro a� .0 c ca - ro o - a) ro � N aeric rom mai - ca C.) EEC rooC o�� ro ca. � maw ro � a� n = % o `a) ro c oa n� � a c - iin E •° o � aEivoi E 'er om 0 M L v�N ca 0. , E c o cc c c ro o c ca a ro ro _ ro aro oc � oro c a) .0 � � c � 3 � ro oa� ai E cn Emro o ' U � o0 CL ro flQ c°> a) a-oo ° mro Oro c0 v a.� ca ca � 'c a. cg coc«ca c � � o co o Eoo m `o Ecca cro o00 00 Lcn ¢ (n- I I O ga> U 'o � � mao-m rocl ya -0T cu mid- a. o � cn �_ m om ¢m C a � o .. c c C m - . a� � •- Z t` _ C ro C r roCIS a) c 0 O ro C O D1 O ro ro to - L y ro Q n� � no coo aa) �a 3EaciUc� cU � o � � s 0. m � aUWa _- r +� 0='@ > c � ro � � E� c� E s o aai ro m.N c ro ro � ` :3 -0 N � cs .m > ca aEi Two0 oEo HE a> o o (D -o ,c o.- F- H sod_ cn ❑ 'cc N U (D U ro U , m m U N ~ O (n Q T a) CL 002 ro .o ci C U cn ro ci a U :o N D E c F7 LLx x x 0 W x X X X X N ❑ X X � m 0 N a- U X X X m m � U -Q ca o az I I U D1 U U U U W LL W } L •� L L L L U m 7 c 7 7 7 7 Z d Co N a a a a _Q W o � Q� o oc D c � ° 0 0 0 J C -0 O C C C m c C m c c a) C C m c C C C C) p. a a) cma) m as a) coEa) mEa) `aEm m m m CV) 2F ai >> E Em °c_)par 0) cm, oma �o� � m Ew rm CD O W ca • ❑ ca m °' c a) ca E a) CO c a) ca c cu cam cN a� CO •a) U > d w c a) a)aai � a) a) m N a)CL aa)i a) a)aa)) a) 'I)N a) 4)N O 0 as ❑ 0 a ❑ ❑ a_ ❑ ❑ a_ ❑❑ 0 ❑ -5 M 0 Z cr- ❑ W H m «� Z Z m m LLJ 0) m c m m 0) 0) I- Q N = m � 0) C) m 0) 0) 0) 0) o) oa � -j 0 0 0 0 0 0 0 0 0 °' a m wa V cc - o UW _ _ Z •i m � � � ) cc c m �, c > m E c as m cLi - L ° o v cnU W O C - c m ca 7 y m o as co m y •- 3 .. o .. m a`)) U Q = a) a7 m o w m ami L v) c C C'3 a3 um CO m > U o is Y � � "' O m0) a) � 0 0 � c U)ca c w `ate CD o 'C 2 cmi a`)) Y w CLa) m a) mU a � Q Z � o � C n 7 > cco mo m > � > 3 •°_-)-' ma' '0 � c C � J (q �' '> o c o a `a m e °) m m v ca Q C C'3 E Cc m cn as -0 c _ 7 _ p v Ecn C � = O � u7 � � � � o r3 cLm. c � co � � o � coc CC � c Wa a) 0E > �� oc°�ac 3m a c a°i p � L C CL mccaoE iia EE rna Ln C1 a) cu ° m C m a� > vi ai m m c c maw ° m ca m Z O = �c o aye a) co m o 7 .. - o woo EL AD a)aw 0 � oC pN 07 U yo — a) -a (1) oho m ac) a) o � m " aa>i aC �f— I I .0 -= m o m m o m ° 7� i m o °) > . N 0 o 7 -0 2 m U ❑ m m o - ca m a ro m a 7 .. m U o cinm .2 E u) c E p in E c L � o o m 2 c m ;r ca — - 77to oEc ° p ao ca cm > to - ca m` o CD C) m — _0 7 — ° 7 o c`a c m — > 0 `c$= - a co -e ia � ca Z m a CO CO 0 m N U m m fa — Z L a) U d as W -0vimc umm E > vi >> E > 3t� o w p m .. •ca37 3c sa W —_ as cm m m ° "x C o o c o m m a`) > -0 ca U c ° m ca ca E cp 3 o CO m m om am m o o .0 o c 3 c m m m N N W Em w w g co � •m Dm H C-4 N o � m � °: � � WCo cC Cc L0) o0a) o w camc �� cc Clc � D � � m Q r Q g N m U C C �cU (D . to ._ O C C -0 0 ".' m > V m U ccc0 3- ° y - u m 7 �a in W U is in c a W L C cc '� L L ,Lm. N a) ° co co O �' C C � " 3 y . no as o � � '3 '6a m > c � � E _c = c c a) � a cin ° w Z � L a) a) O m n in [[ DI � ca o 7 e c o c E = ca 3.- C14 � c c N m c mZ m m _ asm m m " - s (apm as ca ._ 0cmi 7 cn o � cy � O oc3m msm o E � > �,cE 3 � m ca ° 7m > u°) cX oc m v Ca `" 3 oa.Q -- ca -a c as oD-> _ •a) m om E CL F' o �_ e m m C 3 C ca -0 o•-o `m ca o m .- _U m e c o CNCV Q cca 3 U)) cr o c in 7 - a�iin m 5 o m 3 a) m o -0c m Za caCL U O .- C 7 7 .0 L o c m p 7 m L 7 m co to 0 ca a a 3 to O -0 U S 0 ° mC LL E pmo cn cnc m mo Hca a) c o ti -0 E ro Zia ti m m E `-To � w3 � � y -° CCo fl iia E a `o C CD c a� ca a m $ _ = as - m >> ° m E m c -C E L E a) e N m ��coi o £ Z _ ac c c`or co ° 0 rr, = 00 0)a) c°a a)- 0 o S E c Co ° Ch Lm- a) O E L U N m -0 3 ccaa .`m. -00 m .0 r !L!1 c ca C tun '0 Q) '` c '- C co m � p = ° � M a) -0 0 o . .m E a ° ,` � ca C Zr 3 . N m ca a c m Uc_ _ .� to C o c n -0 (D ma°i ° 7 � (nfl caacicmn m o0EE cE0 a°i c00 CD c m - m ac 3 o C o e m `n Es w m m > m m ca � � cc ca acn o � c c � m trica ° L ° 7C aa3 mCD w is a) coo E .5 a) c m ° cca I I O ca m� m am cu cu c° - L c 0)� ca > r a) c o) caL as is o� cc ca � � •3 0 ¢ m m C L to L a) Z cn coy m m o cO cca w we ca w c ° m o co (1) m w E rn a =- � EL > cmcn v ° � .S Q'� X m � n E c o 7 m � •- m Z-` co >,ccc U cn C j �) m W ac m (� m Um 7 � iE aw r) a) mr -� mecn m +1- m j 7 O u L Lm ro L m c� aci c cm�a m u L m 7 0 m m D O L aci a) V L °- m ._ L m H L m c .� O c m 7 L u L m O C = U L ~ c U y F- m ° m 7 0 U) m H CD ca c U ca Ca a H m o ° ~ o - coi Uj tCp 7 to c 7 U � E .Q •> 0) y � o f— O N 'IT CL d> U O.O 'D is Lq m m a E aD p a in Qf - CT M 7 r a O `o 3 m me ♦� 7 U ❑ °) r m ❑ -= ❑ ca as ti ❑ c ca ❑ Q'� � G o m Ocvm ti LL X X X X X 0 0 N f` W X N � ❑ X m 0 � d m ,co (U .a o n ca 0 dZ I I W } c' w w Zm cm: ac) ❑ U E U U Q a a a y a Y a JW caa)ic caa)ic C0 -r cic CL oa) > > O G. LL 0Eo ca a) c° Em 0Em nca m m CO) 2 c' o� C: _co)o Ec .�o r `o m a) � o cn o cn O LV C a� as c a) ca C a) ca C a� CO m p a) a) T U aa)) aa) CU aa)) aa) cz a' Cl) a) ca a>i ani aai ani aai ani O IL0 ❑ d ❑ ❑ m ❑ 0 m ❑ ❑ 0 ca ❑ 0 ❑ 0 Z W W ZZI— c c c c c c Z LLI Lij CF) ) � � 0 0 0 0 0 0 0 CL Lu co c Uw Z L Loco U) _0 Eo jai <a 0 (D � m Lnoi >1 QW O oo'a(nc � Z6 ca ` � � N c wU) roan) is ch aC7 o o m roCM Ln a) c _U Ca , o c co aaQ J Z ca � p C a ca 0 r ca co a s 0 0 0 ca ca o Y � c a) Q N -2 2N c — c 'c cn 0 0 a) o acne C 0 > g a) m 'o '0 a) C .0 LLIca o� o `n � cL � = o >, a`°i v � ma ro -0a) c - Eca a mo WLL o �_ cn � •� o o m c a) c E m3 �� o " U) _a' U) LO of o m c o c la L ca � o ca a) ca ) — E a o CDc cn E cay o o C -- N o 0. o 'N m a) °� c 2m Z o = c a) a) o U - 0 L a) vi o,o o 0 x ca a) a) c ca ON a, a) cao a, cL �Co � a) 3 C c 6 asn (n oO � oE a3: N U ❑ L `) C w N U C a 0 '00 cd o co j 0 c)o a 0 CO L 0I 3 0 C 3 L •o U a c d 0 p 0 —V �' ca E u)co c ao c � L as � -00 � a`a) Z > 0 C ca c ca — C a) d o ca U , N C a) — W w 'as U as o c C: O o a) U :E m a`) c 3 > 0 o 0 E oa _ W � � �ra � yc � � C: a & o oa ` c0n � a? Ua) tea) ac) �"• > co . cCa ? cap ccy � � m o ao ca cE 'nc �a oa) aa) N N Q ax cn c `—' w E a«� o n o is o c c 0 cn ca Q r n En Ca mCm C c �' � 210 0 3o ca �` W cc # E ca aa) a� E coo v m caa)) E CD > 0aUia� -0 ca CZ 0 CD C asmo o � 70 ccaac� moa) a��i o cn � aaa)) � (n cam N Z > c Q c a) cd c (D .0 ca a a) ac) ate) a) c � ca a� ooas Eoc o � � L cn = a) cn O '0Ecn3a ocC v a ca w a� L o C °) O Ca O > Q ac� C > c a) � crn — 3 cn 30 En ooa`) ocaa nca aci o E > o U) oacn axi ca ca C 63cacn O E CA � o. a is c c ao a) a) c Ev) c o w _0 3 vEC m c a� >,cn c oacn � °� > o cc—a o c H c is is coon a) -0ca > 'mc — 0a c c 3 � � n c v ca cnn a •- o > ca m o ca ccn o o E O c ca o •- ca cn a) c co w a) E o o c c a) c v o a N :3 — 0) � � � 0c00) iaa� E in m fl � s E co c' � o o `a E5-0 c a� _ a) c .- :3 =3 cZEo CD in` mac3 � � O O c a� ro c � > 0 cam ' mE n CO Cl) O >'� O c a) c o cn 0 0 3 C w n 0 O a c C -0 0 O ._ _ a) O U C oI ~ O a) 0 0 0 N fl- a, rn E O N C 0 -0 OI t C a U E O 0 E 0 -0 C Oc ca = O r cn _ ca _0 Q) a) C fa >' _ C ca : ~o LL X X X X 0 N h W X N E � o) ai a U X a) m T cc U a o a Q X •c Q ca o X IL Z CL c I 1 LLI a) ° W LL � C -CL CL ANm E a)Z ❑ ca a) Q U Ln O ❑ a: EJW : -0oc � � aci a: Ca) � � CDP O. W a � � � a) � aroE � cCaE roE roE T- CCo vi o cn a>> � o cn aai c°) 0 �a o .OL � o �o o QW . .a) a) ❑ ro . ,a) ❑ 'cm cn . Z c c c Y c c a= a_ W a)a= o > a > > > 0 0 -3 ❑ -5 50 0 iia ❑ a ❑ ❑ W ❑ a. ❑ Z CC W O c 0 > cn WH `o_ c c o 0 0 o O 0 -0 0 -0 Z N W W a- E c °- ° O` `o_ `o- o _� O LAO a) U � i C C c c — c � a 2 a.- a o � o LZ W 0 is=- o c �U �- �- Oa V � J O LAoaciCL ro LAo co co c > Eia c > Eta a d O. c co o 0 - CL '3 22 .2 poa) � m Q U Oa O c0 c0 ma•!a cQ•� Q ro Er a: — c0 OU OU 0000 Oro0ro c VW Z i c°� a ° �% aim 0 cn � > -0 � s 6 m c°) a) a) � cn a GQ. C'3 -LLI 0 �� ro o ro ° L ro a) ro cU � � v ca aci a >u o a� cca cn aa)i a) (1) c E c m ""' a ro C C N a E a) ro (n c U ,2 co a ro o LA � 0 C00 � , cn °' OocE 2 -a .- mom co `-' o a�iE � O � � p> acn e. � Q J N G 'V Co L C ca m ro O C L •V U 7 > 'O E L > ro m Q C rom •- rooa) c � cn - c .� •- oa) C- C c c - W m - ro � >Uw m > a crc a) a•, m ca c� -0 0 LAO m c o c ~ C m c E o ro a) -= i 0 0 3 m LAc o. S am 2- z LL O � cca cmc aE o3 .- C � ° c wCroo •° cmaEE ° _mc W aro � :ti ' ° 0 0 m � c _ n' U 3 0 0 cn � � vEmna) � - � -0ca mco �' 0 Dani vca) c � ro � En � � ZO = -0a " co Edam m ` � EOO c � o � 30 � o uia) - cXao U ❑ Q N cc$ c ro o a) c � U ui o amc o o m � %C� ro ro a)-0 E U mm -0 � ... wm om c v 0 ° cn mLc C a) >� Co o f a) o E $ me c m � .. CIS (1) m E � mim Em oma L) -0 Ina) � c cNL � mom '- y Z is .- 0 is X — Z ° U L c cti 0 •- v c cn m c—Ca a) 3 � c W m ccn � cc •— CD CO m m ° O U coli Um -0o W c •— _o o m CO m in -° ro U o a) a) E c c L a) «- W m = ' 0 am o) aaa)i C c —_ o Z `o `0 a) -- o C o f a) D cuc ro - j ro U ro ro ro m ,C m CO _0 LA m m > m C N N N Q (DC)m CD (D m �m d aN 0 m ( m c > E 0) c ¢ �E > Q I` W mCEa� m •- o c0 - � C % � � a°i � � � � 'E mm3 m T ooC o roc ai -- . m as ro m ° 3 N a) row- o aca ao m ro aa) a) E o - Z N Z 0m > CES y °) ro a) 0)� o carn co � � ❑ � wmEs � E m ca c •v m �c cn N ro U L c L ° ro -6 -= a) ) 0 � cavE 'amro0 C - T roto > c In .2 ma) moi` � cn 0m 0 F.. ca � 3woE � oca - 3: *R (D C «- c % roaio -0 � � oC� °) Q `0 OC c ;� a� a) a) > =L m FU � c ° O ro 0 c ro > o m - o C7 o cMroLTsca aa) roa45 LA aoa) ro c > � o � 3CL Us Eco O F_ m ro � � � o � ro 'c ° E > m tri > c is cs N > 00Y N c CO _ _ - Qaa) aa)) 3:6) ca -X �? .o � � � c°a � � 45 o o•c° c m oro ate) In <n • E ro0 � o mo > m c - � c C- m �a) m � ca -o mroX EL ' ro ro o v CC COE a) m a) mco Eo ° om M w m to U U ro m O Y L > a cmn a C' ro O C 7 ata c� ° � o0cn ` `o mom a) o0 > E � 7 cm oEca 0 0Co - O � '° •� cn c O C O ro m r U O � � `0 " U)i ❑ c0 � � > FzZU) oa) a) 0 -0a) 0cn N inr •° N C � C `� ..- .-. .0. O � c i= ro O U) a) L cn > CC E C ca 7 > 0 ro -0 c (a fn a) > - m •0)m 3 ac) ca 0 _ m m m CL 8- 0 c m 0 cL£ (D 0 m -ow C I I O s � uoi m� •� - cz L o s � °) 0 cd ai o C aroi ro roY '� ca EiaL o CD a: Qm Z N ro a) o ro o m y O In 7 •- U = C .0 Y E 3 m >O ca ° U) Y C m O — m a) cn �, U a) O m Us N (a r C N Q• -0 a m �, C (4 C M • o W 000cacamaa)) cc C) Uroca: m m � Co� ro m ro00o p to N ° a) "O 0 m p) E p m s p O U L E . aa. L m cn L Cc ai C � t (D. c [n co ro � aV; am Co •� M a) U 0 (Na > L > �i O ro ui U.cn .0 'C �- YO m r CO CL r a) a•C N «- C �' E CL ti. L m R i a cn a) 1L a E LL 2 co m C) a� 2 [C E _ co m ro s ca w N 3 'cn CD LL x x x x 0 N rl W N 27 E 0) 0 d a- U m m > m U "Q 0 0- Q x •c W 0 IL Z II W > u1 LL Z � o 0 0 0 0 QW � c '0c � c � c ac C aa.CV) . caE `° E caE caE `° E rn m 0) o)CL C=) O W E ao) � a ca C a ca r U > � a>, m � ccua tea ) Baa)) O 0. 0 a_ 0 CL0 IL0 IL0 Z o) m 0) rn a) (D � c a) W LLI ' a O 0 -a 0 - O -0 O -a Z Z c c c c cu c Z N WW 0- -5 oc oc° (ac off° me `o- - oc - - Fa�. J r ocoo co LZ 15 .0 a0cano c J • •o ' 'oa>O co o > Eoc > Ei a 'oo ) 00 ) 0a) 00a) 0ooa) 0 mN ma � aoraoCCW Q c rcnocao Oaao aOa � s0 Omcaa Ommc) U Oaamca0 a) cama o VW _ Z i ca >, ca m ami Q a)c .0 0 c - r a) c w umi cn ti U) >. QW O ca 76 mecca mm -a3 � 3 ,ro 0 m m mmc 76: — ca x a ca aa) m E o o r o c E m c c'�ac_a3: moo C C 3m — O E a 0 O O m w c m c E o a) ca Mz ca .0ami c •o cis m o) > a) a Q W = U 0 L U ro m a � � m a) V a cO a) >."O U j � cO N F- O cmcncnca mfl•0 ca +- oEm 0 - c `2 $ m - c Z ;_. m .0 ca jZ a O � w o m CO a C n) O WV- cC E - o m co- m mcg `n0 �> iia «- � c °� v _� vai N 0L m � m 0 � cLO ca cn a) a a)or E E c c � - � in E m o `o � oC Z o CL ca mL m cn o L �a is o � o ami c ,c � m � cr- N N v0i :F o 0 > > to cd m O U) - O cu o vi ) U D Z -0 Lia ca .o a 0 c L a ca a m o m E E O O L U W 0 o 00 Nam' a) a.3 0EEUaci m m � � 0 cr W macic° Fm � � > as ro O a� � co m > U) W mE `° mo m 0 mcnE � � m cn -0 a) `) 0 m CD o � � (D ca o m m cam > m c > a UN N o 'a= acts o 0. aa) 2aca f E 'E '0 3cwa) aa) a) v cn m Q W > ms .0ca `� a .0a) c L) ccmo a) a m s p 0 o � E c m0 — .0 .— . = Oavi > a oY m O 'a = a) c is - c 7 c 3 L O U L a) ca c ca — m > I- N L — O a-a = a) O O rn U 0 _ N Z I— a m0 ca L Y E c a) cn s c c °' M := N m m a) m ' ' O m CO'Oa) C N m •(A 0. m L O i cn m 0ca _ - ` - L O c0 0 a F- m cLn o m a 0 o 0• o ca 8 .� o c aa)) c cLn c) 3 o n) c`ai `0 0 m �-> coLc a) a) o = - o `o me as(D 0yo -c (n E o � E a _ O m m rn (22A m O Q m U U ._ 0 0 N Q = > a) a) •- a) N O 'cn a U O w > C a) U U `� CC > m O O L 0 0 O .., -ttla c ~ L m c 7 `7 m cn m m Q .-. U a c -a N m C '` ca O as 0 _0 ca m >0 « cn O O ca a) .0 cu o m O !pE ca C C Q U U m C C m c m > a3 N m m m = ° L � a• ca c m E m rnm � � as ro m m as S o 0 - C9 L ca N U p c — � aT 7 U O o 7 D - m O (nL a ` m -a 'E ai = m .. a O m >.0 c c .L. CD-0 0 .� O 0) m «. m L m U N rn U m 0 C ca — 0 0 a) m U "a U !' p o c c0 a cn m = rn a m ao 0 m o >+ .0 0 c 0 -0 c� m c � 0 m = m � mU amcn_ as =3 o0(D 0 ca - comco0 E .--a m 'acca � Sa) c0a� ac) C: cn >o a� o ¢ m p m o cn_ m a) Z m _ a 0 o 0'Z5 O O m 0 me 0 Z 30cEUm m caE C: (D 3 "0 � � � a) cu o)ac cd � 0 icy aa) Q C S N C a c m O m m rn ca O N 0 m c) O U cI N W co mom 0 ca - E n. 0 a v moc ca in a) .0 0Lm ca o = ° camp a) '— (D Zvi 0rr L > g 3 a) m x -- O `n o U = a Q a E m cU9 c U U > v d J� > E > Luc m ai a Q c:° m a) a Qcn a) U m Q ca m 0 vi aa) a' aa)) et s c0 d ui O` a) c lG 0 c r U cu vOi .N a. — c0E(n . 30 .. . a > as . °' m 025 aid 6 -6 ai r` W X X 0 0 N ti W X X X N 5 rn 0 U m CuCu U a o a m O a Z I I W O O w U- ZQ c6 w d'� Q a d d 0 0 0 z �° 0 0 0 0 0 Q W a C -O C U7 c -p C c a c a c -p c J - C O C m T p C m N C m C O C U C m o O. I ' E c" Ea 'N �E � � E ca o,E cu � � co Co` � co0 = o = o _co co O OW cm EasoE Eaa `o � Cm Cm r— C > c > w0 cco > in (a cco > cca > � > � > U cam m ._ o a) m m m m O � 0 0- 0 =U a. 0 = cn EL0 IL C) a0 a0 Z m m W c : o _. ui N o a Z Z m m m � �aci ..o 0)Qa aa) 0 J = W m CL ac oa c s , os o 16 osa cc ' Q O O =aO OD. � ar aaim CL '30aiU O OW - ° 0 - CL M UcNcc � 0 ) asm o W UZ L cn � -C a) ms .8 cc ° `m ( N aa))-0 �' cA = ia mao o n co ui > Q W 0 N •�.-• U •i ,-• = O «. O E i6 N N 7 w •° = tLn O O .N •io p) c CLCD o o R ma ro mL m E m m ZEN E � '> ° E as �m ca c cc, � c .c = Y mom= -0 3 •L � cU aim 20 O ca m p E as cn m 3 - > �- v m a � � � •5 as Z E L ca U Q N ' m0 C7 E w m C N C � 3 S 0 O C m 7 m C C 'D QW C Lom � ? maa) a� C7co `m o' n � N ca � aacam 7N � coaso ocn n F- � O - io c_aU NL N � %i m ' E oLM p °a o E m .2 c W m L cc Z m C O O '3 m e C = « m 'p H O L_ - .0 ' c .— cn LO � `SEs cn p m0 a > cc U � m -i U +3 a) m Ol = IE N N > E m cII � N ° m as Q o E �w E - Z O aa) N cTo E o m N m a° L_ �' � E U oZZ E N °a� I I N c .0 i O co c `> � caac 0 a) ch a) o c � `t > a) Lo c m N ca m .5 UO i) — ca : U a0 — c -o — a o aaa >Y % o(D 0p c — N o � Zp C C13 m e o cos a m a%s a ca E io 3 U c°n V o W a) a) � `o � ca .0 Co cera) Lo c `) a) `ao � coo W m E ocnm > = � " rn 0- a) m � tT ETXE u) c E •N o o O U - .o c � _0 - ._ - =U) 0 as a - ii m e _ C o '> io o a) U) c 3 = 2L N ca � LLO ca o ¢ CCa � .� 0 <a is m N (n .� C C as 6 m m p to +•� N a Ca m > cn 0) Q Z N ° i a o E a c > c 0 aE o c r Q m m E cLrs a C m m C N m N U a) m d U O ti W oYa�� � iucaoi oaa) Eo '3m � v .� .in -om asEcoccm» ia o Q, o m o cCos o a) E E o c a °t am - .o m ui m ro o Mn c_o " O a c ° � osmCn E ca N Ca E m E ° p c a U o p c O m m m m CZ ° j ca V O E C .N CU " C ` w O a a ca N as N N N m as co .••� N co G O_ o -oL c m E ma ` � o � •c U .0 � Qa' ro o � ,o .c � N E o 0 CL a) cuL � is as L O N Ca OLS .- N - a) E •c-' 2m a)m •cu E m �, m N N m N -0 _ .� � vNioro � Uoc NLL •p ° o c � p`a� n E � E mo 0 0 - a � co _ Ncn c d C1 cn ca 'm o m cOsc m N - 'a " oc o m > caNim � cam ° 0aa) o H cn _ � ) ca y m a� a 0) c c N c.- ca a p o m 2L N LU - c E co a N � � asp cLL o � E p ro a) > E 0 a) �' o m o a) r a O a> > O O ° m 0 0 O Ca as O m as E O _ L m m m ° � C 0.a ..0 a) m O L a) UL ... a.� cl N O U O L ° m f m p Ca Q) O m ro m Q 0 ° a U 7 - L C O m N 0 0 m C7 m > CO ca c ca U mm m v ai cCZ c c s > c N .N io cis ro ais Ch ui co c cca U N co Q U m c 2 cam L L C p os N as a >- m E '- m � c 1 d CCa a a) j Y U m Q O `'O -- ° 0 c N 0 U O ca co U N 4? N O Z E U ° O p O 2 rcn -0 m Co U H Co C io CC C ._ � cEc °co `sQom boas = = Caa ° c > � � mU c — c � � � aroia I i 'ED m ° ._ N a) ca U - _ co C - ] co co V 2 N m m L 'D` •- U CD Ca U U p ° m m m maa) Ca E c a , ._ ca0- a � o •o Co r m cnmo .� 2 NN m ¢.m comN LQ, m c a) c a� QCUy o m r- ca > a .a m L . cn c n co E c m C c m N m L Z Ca - m . Cu � ° m o` moo Y.E > ca s c " Co it c: o � E Q i cc$ ro L >.Z O N C - IZ 0-76 c N c . r CM•'= m i C CU .-• �„ U O o m - Q0 Loo > (U N � Uc3 as o y m L co a ds m m ca m •° d m 'Q m c ca >, m am cn V c C (D Z6 a) Z �•� m L n c0 E N -2 a) :: o o � Q osE m oa d ¢ oNo coc°o m m 3 ~ Qcas m lA m m io _a cn O m E 'os' c c o Ern LO ° T c cv o L .m �? of E c T" '� Q oo Cu �;' � L = �? E o 00 rn m (OD) N Q. coi— U � ._ .= Cu U mdr � Y Yw cad H E • • • Y m -j co E v co o LL 0 04 1- w x q 5 0 x \ � c � / k ) \ / m � § O ' \ 0 Ez LU ± z z E E < S0 0 = £ = f D ( c" / co / :o o L Lu \ � / \ c; CL IE Z . cr- � w uj Z o 0 QZ2 � \ O � _j0 Lu a 0 2 a w Q cr- cr - 0 W E � 2 s = mo G) Cl) LLI 0 e c = c � a) o _ o & CL o - $ f ° � \ E O / / 2 � C ¢ 2 e2 ® _ ° ® ' §* Q � 2 � @ [ \ / \ \ § z L 2 §0 -6� k L k \ 9 - maw 7co Ln : = f \ § $ 'in- 0 k ƒ 2 0 � p C 0M .2 Oo � a / /@ _ @ § � @ @ w 2 / c U) ca - 7c w aCD w22 - w cc 0cn. / � CL 0 i\ -0 _ « a) @ 'sem § LU r - 3 ® C 2 a) > � _ � _ kC '% / CL @ \ 2aac 0 C 7 ca 2 � / t : \ - / -\ CD �eCL a = % = 2 = CO) \\ k \\ � �k PL SI $ a -0 S9 2 � § .0 .- U) 7 & 2cam < E k \& 5N2 % - m � os0 CD c: 0s a) LU 0 » 2m 2220 0 ® � � k2 § . w� 2 ( \\ a zS 6EcaE