SUBJECT: NOTICE OF APPROVAL OF VESTING TENTATIVE PARCEL MAP NO. 2006-46
DATED JANUARY 26,2007, PROPOSING A 2-LOT RESIDENTIAL PARCEL MAP
FOR PROPERTY LOCATED ON THE NORTHWEST CORNER OF THE
INTERSECTION OF WEST ALMY AND SOUTH CLARA AVENUES.
(APN: 329-161-16)
The City of Fresno Planning Division has completed its review of the subject parcel map dated
January 26, 2007. Pursuant to Section 12-1205 of the Fresno Municipal Code,this letter is written
to advise you that the Conditions of Approval dated June 22, 2007, are as noted on the attached
document.
Appeal: The divider or any aggrieved person may file an appeal regarding to conditions of approval
within fifteen (15) days from the date of approval.
To protest the Director's decision regarding the conditions of approval, you must appeal by filing a
written appeal with the Director of the Planning & Development Department. Appeal must include
the appellant's interest in/or relationship to the subject property,the decision or action appealed,and
specific reasons why the appellant believes the decision or action appealed should not be upheld.
Appeals must be submitted to the Director of the Planning and Development Department prior to 5
p.m. on July 09, 2007.
EXPIRATION: The approval or conditional approval of this tentative Parcel Map expires two years
from the date of approval. The expiration shall terminate all proceedings and a final Parcel Map
may not be filed without first processing a new Tentative Parcel Map.
Modification of a Tentative Parcel Map after approval or conditional approval does not extend the
two year time limit.
EXTENSION: The divider may request an extension of the tentative map expiration date by filing a
written application together with the fee set forth in the Master Fee Schedule at the time of the
request with the Director of the Planning & Development Department at least thirty days before the
expiration date of the map. The applicant must state the reasons for requesting the extension. New
conditions may be imposed if an extension is granted.
A.K.J. Properties, Inc.
Tentative Parcel Map No. 2006-46
June 22, 2007
Page 2
An extension may not exceed an aggregate of five years.
If you wish additional information, please contact the City of Fresno, Planning and Development
Department, Planning Division, 2600 Fresno Street, Fresno, California 93721-3604; phone, (559)
621-8277. Your inquiry should be directed to either Rick Sommerville(engineering or improvements
issues) or Will Tackett (planning or zoning issues).
Should you have any questions regarding the conditions you must notify either Rick Sommerville at
(559) 621-8277 or Will Tackett at (559) 621-8063 by July 09, 2007, to request a review of the
conditions. Otherwise,the stipulated conditions of approval are in effect as of that date. No further
notice will be sent.
Sincerely,
PLANNIN VISION
Will kett, Planner
PI ni g and Development Depa m
Enclosures: Vesting Tentative Parcel Map No. 2006-46 dated January 26, 2007
Conditions of Approval dated June 22, 2007
City of
PLANNING AND DEVELOPMENT DEPARTMENT
DATE: June LZ , 2007
TO: Keith Bergthold, Assistant Director
Planning and Development Department
THROUGH: DARRELL UNRUH, Planning Manager
Planning Division
FROM: WILL TACKETT, Planner III
Planning Division
SUBJECT: REQUIRED FINDINGS AND CONDITIONAL APPROVAL OF VESTING
TENTATIVE PARCEL MAP NO. 2006-46, DATED JANUARY 26, 2007, FOR
PROPERTY LOCATED ON THE NORTHWEST CORNER OF THE
INTERSECTION OF WEST ALMY AND SOUTH CLARA AVENUES.
(APN: 329-161-16)
BACKGROUND
Vesting Tentative Parcel Map No. 2006-46, filed by the Lonnie Schardt, on behalf of A.K.J.
Properties, Inc., and accepted for processing on January 26, 2007, proposes to subdivide
approximately 0.39 acres of property into two parcels located on the northwest corner of the
intersection of West Almy and South Clara Avenues. The subject site is located within the
jurisdiction of the Southwest Fresno General Neighborhood Renewal Area Redevelopment
Plan, Edison Community Plan and the 2025 Fresno General Plan. The Southwest Fresno
General Neighborhood Renewal Area Redevelopment Plan, Edison Community Plan and the
2025 Fresno General Plan designate the subject site for medium density residential planned
land uses. The existing R-1 (Single Family Residential) zone district is consistent with the
planned land use designation of medium density residential as identified in Table 2 (Planned
Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and applied
within all community plans.
The parcel map is proposing to create two parcels which meet the property development
standards of the R-1 zone district as identified in Section 12-211.5 of the Fresno Municipal
Code. The site is currently vacant and it is the applicant's intent to develop the property with
two single family residences once the parcel map records. Approval of a tentative parcel map is
subject to the Planning and Development Department Director finding the map is consistent with
the officially adopted plans and policies of the City of Fresno. Staff has reviewed the proposed
design and improvement of Vesting Tentative Parcel Map No. 2006-46 and has determined that
the map is consistent with adopted policies as described below.
Planning and Developmen, —epartment
Vesting Tentative Parcel Map No. 2006-46
Page 2
REQUIRED FINDINGS
The initial study prepared for Environmental Assessment No. TPM No. 2006-46 considered
potential environmental impacts associated with the tentative parcel map. The environmental
assessment resulted in a Class 15 Categorical Exemption (Section 15315/Minor Land Division
of the California Environmental Quality Act), which was filed on June Z1, 2007, with the County
Clerk. Staff determined that a Class 15 Categorical Exemption was appropriate given that the
proposed project is located within the R-1 zone district, which is consistent with the general plan
land use designation of medium density residential planned land uses; the division consists of
dividing land into four or fewer parcels; no variances or exceptions are required; all services and
access to the proposed parcel is to local standards; the division of land is not involved in a
division of a larger parcel within the previous 2 years; and the parcels do not have an average
slope greater than 20 percent.
STATE SUBDIVISION MAP ACT
The Subdivision Map Act (California Government Code Section 66410 et. seq.) requires that a
proposed parcel map not be approved unless the map, together with its design and
improvements is found to be consistent with the General Plan and any applicable specific plan
(Finding No. 1 below). State law further provides that the proposed parcel map be denied
approval if any one of the Findings Nos. 2-5, below, is made in the negative.
1. The proposed parcel map, together with its design and improvements is consistent with
the Southwest Fresno General Neighborhood Renewal Area Redevelopment Plan,
Edison Community Plan and the 2025 Fresno General Plan which designate the site for
medium density residential planned land uses which is consistent with the R-1 zone
district.
2. The site is physically suitable for the proposed development because of the flat terrain of
the site and adequate access and drainage on and off the site. The Fresno Metropolitan
Flood Control District will require that the drainage from the site be diverted to the future
Master Plan Facilities.
3. The proposed parcel map design and improvements are not likely to cause substantial
and considerable damage to the natural environment, including fish, wildlife, or their
habitat, because of the urbanized nature of the area in which the site is located.
4. The proposed parcel map design and improvements are not likely to cause serious
public health and safety problems, because the conditions of approval have shown and
will insure that the subdivision conforms with City health and safety standards.
5. The proposed parcel map design will not conflict with pubic easements within or through
the site because conditions of approval will assure noninterference with any existing or
proposed public easements.
Staff, based on its own analysis, has determined that the parcel map, subject to the
recommended conditions of approval, otherwise complies with the design and property
development standards of the Zoning Ordinance and local Parcel Map Ordinance and
recommends the approval of the parcel map.
Planning and Developmer% —epartment
Vesting Tentative Parcel Map No. 2006-46
Page 3
DIRECTOR DETERMINATION
1. Based upon the above analysis, the Planning and Development Department Director
finds that Vesting Tentative Parcel Map No. 2006-46 dated January 26, 2007, is
consistent with the applicable plans and policies of the City of Fresno.
2. The Planning and Development Department Director hereby grants approval of Vesting
Tentative Parcel Map No. 2006-46 subject to the conditions of approval dated June ZZ,
2007.
Keith Bergthold, Assistant Director Date
LEGAL DESCRIPTION: Ifs
The South half of the East Y$1 feet of the South 224 feet
of the North 474 feet of the WesiJ261 feet of Lot 96 of
Central California County,in the City of Fresno,County
of Fresno,State of California,according to the Map
thereof recorded in Book 2,Page 1 of Plats,Fresno
K-I
25 County Records.
Single Family Residence A.P.N.:329-161-16
Power Pole w/ z
Street Light W ZONE DISTRICT:R-1
Q SOURCE OF DATA:
Recorded Mapping,Assessors Records,Fresno City Public
\ir Works Dept.and Field Measurements
.tipl z c Zs'-' RECORD OWNER:
155.00' 0 A.K.J.Properties,Inc.
CIP/
75.00' 80.00' 14' �'''!^""c r.[�er�R F"�'i�-._ Orlonzo Hedrington,Owner
- 765 W.Barstow Avenue
Fresno,CA 93706
P3'- (559)451-0405
U ENERGY CONSERVATION:
New construction shall utilize roof overhangs,dual etas.
O = low-E windows and landscape tree planting to minimize
(✓ energy consumption.
�i Existing 3/4'0
R-I
$ Parcel B o Parcel A = C)Water service
Single Family Kesldence 8400 s,�. ft. N 8960 so. ft.
(Under Construction) _ = Power Pole m
E.North Avenue
basting Sewer Service 6
u
m E.Almy Avenue
C
C
d
6 PROJECT PARCEL
6"0 Sewer Line
75.00' 80.00' /�:
2' Proposed I"0 Proposed Sewer Service8'0 SLine
Water 5ervice ewer �� VICINITY MAP
5 5 5 5 5 5 ° 5 5 Sewer Manhole
40'KIN — — — — — — — — — — — 3
Existing Road Surfacing
14,
W W W W W W W W Power Pole w/
-----_Powe�Pae-- ------------- ---------- Street Light
8"Water Lne EAST ALMY AVENUE
VESTING TENTATIVE
Vacant i Single Family Residence PARCEL MAP
No. 2006-46
MAP PREPARED BY:
r�E Lonnie Schardt
Civil Engineer
s 4948 W.Bluff Avenue
SCALE:1'=20'-0' Fresno,CA 93722
(559)275-3169
P/en,w P--*e�jc„w.P 12-26-2006
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
JUNE 2212007
VESTING TENTATIVE PARCEL MAP No. 2006-46
Northwest corner of the intersection of West Almy and South Clara Avenues
NOTICE TO PROJECT APPLICANT
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act(SMA),
Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The
following specific conditions are applicable to this tentative map.
In accordance with the provisions of Government Code Section§66020(d)(1),the imposition of fees,
dedications, reservations or exactions for this project are subject to protest by the project applicant
at the time of approval or conditional approval of the development or within 90 days after the date of
the imposition of the fees, dedications, reservations or exactions imposed on the development
project.
Upon conditional approval of Vesting Tentative Parcel Map No. 2006-46, dated January 26, 2007,
the subdivider may prepare a Final Parcel Map in accordance with the approved tentative map.
Note that a final parcel map may not be filed until the appeal period has expired. Should an appeal
be filed pursuant to Section 12-1207 of -the FMC, the application will be scheduled to be heard
before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant
to Section 12-1207.2 of the FMC.
Concurrent with the filing of a final map and when 'the provisions of Section §66436 of the SMA
apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed final map,
together with a copy of SMA Section §66436(a)(3)(A), to any public entity or public utility which has
previously acquired a right-of-way easement.
LEGAL STATUS OF SITE TO BE SUBDIVIDED
1. The parcel map site was legally created as the South half of the East 155 feet of the South
224 feet of the North 474 feet of the West 1261 feet of Lot 96 of Central California Colony, in
the City of Fresno, County of Fresno, State of California, according to the Map thereof
recorded in Book 2, Page 1 of Plats, Fresno County Records.
PLAN CONSISTENCY
2. The 2025 Fresno General Plan, Edison Community Plan and the Southwest Fresno General
Neighborhood Renewal Area Redevelopment Plan designate the parcel map for
development with medium density residential planned land use. The Zoning District
Consistency Table of the FMC iden'ti'fies the R-1 (Single Family Residential)zone district as
consistent with the medium density residential planned land use designation.
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 2
ZONING
3. Comply with the provisions of the State of California Government Code Sections §66410 -
66499.58 of the SMA and the City of Fresno Municipal Code Chapter 12, Article 10
(Subdivision of Real Property).
4. Proposed Parcels "A" and "B" are consistent with the R-1 zone district in terms of parcel
area, width and depth. In addition, both parcels have access to a public right-of-way
(i.e., West Almy and South Clara Avenues).
SETBACKS
5. Building setbacks shall be in accordance with the R-1 zone district as follows:
Parcel A
Front Yard: 20 feet from the front property line.
Street Side Yard: 15 feet from the street side property line.
Interior Side Yard: 5 feet from interior side property line.
Rear Yard: 20 feet from rear property line.
Parcel B
Front Yard: 20 feet from the front property line.
Interior Side Yards: 5 feet from interior side property line.
Rear Yard: 20 feet from rear property line.
STREET NAMES
6. The following street names shall be corrected on final parcel map:
Street Name Status Required Change
East Almy Avenue Change West Almy Avenue
GENERAL CONDITIONS
7. All off-site and public improvements shall be constructed in accordance with the Public
Works Department Standards, Specifications and Policies. Engineered construction plans
and estimates for all or part of the required work shall be required prior to the issuance of
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 3
Street Work Permits unless otherwise determined by the City Engineer. The cost for such
plan preparation, review and construction inspection shall be at the subdivider's expense.
• NOTE: Engineered construction plans shall be submitted to the Planning and
Development Department for approval concurrent with the final map.
8. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants,
poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction
with the construction of these off-site improvement requirements,shall be the responsibility
and at the expense of the subdivider.
9. All existing overhead utilities, including but not limited to, electrical systems,communication
systems and street lighting systems shall be placed underground in accordance with the
provisions of Section 12-1011 of the FMC, Resolution No.78-522/88-229,and the policies of
the Public Works Department.
10. When street/safety lighting installations are required, street lighting plans shall be submitted
for review and approval by the Traffic Engineer prior to the issuance of permits for the work.
Services to street lighting installations shall be separated from the electrical service(s)
serving the development. The type, location and service for street lighting installations shall
be as determined by the Traffic Engineer. Street lighting installations shall be dedicated to
the City upon completion and acceptance of the installations.
11. Sidewalks and driveway approaches, for undeveloped parcels of this parcel map, shall be
required and constructed at the time of site development.
a) Curb ramps are required at all corners within the limits of this parcel map.
12. Whenever covenants or agreements are required, they shall be prepared by the city upon
receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and
agreements must be approved by the City Attorney's Office and shall be recorded with the
final parcel map.
13. Telephone, cable, and other public utilities which propose above-ground facilities (such as
cabinets) determined by the Planning and Development Director to be oversized shall be
located in an additional easement area outside of the required landscape strip.
14. All work and engineered plans for public improvements shall conform to the 2002 Edition of
the City of Fresno Standard Specifications and Drawings(City Council Resolution No. 70-36
and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the
"Public Works Standards."
15. The subdivider shall dedicate and construct public easements to facilitate the construction of
curbs, gutters, sidewalks with street tree wells and irrigation systems (when applicable),
permanent pavement, street/safety lighting, bus bays, right turn lanes, bike lanes, bike
paths, multi-purpose trail,wheelchair ramps and public utilities in accordance with City plans,
ordinances, resolutions and policies, and the Standard Specifications of the Public Works
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 4
Department within the limits of the parcel map.
16. Existing improvements that are not to the planned alignment shall be removed and required
improvements installed to the new street alignment and grade. Existing improvements to
remain in place shall be repaired if determined to be damaged and/or off grade by the City
Engineer. Existing driveway approaches not identified for current or future utilization shall be
removed and sidewalk(when applicable), curb and gutter shall be installed to match existing
or proposed street line and grade as determined by the City Engineer.
17. A minimum four foot wide clear path of travel is required along the public sidewalk on all
frontages of the property as required by Title 24 of the California Administration Code as
determined by the City Engineer. An on-site pedestrian easement and construction of a path
may be required if Title 24 provisions cannot be met within the public rights-of-way. All such
public easements shall be identified and dedicated with the processing and recordation of
the Final Parcel Map and/or at the time of Special Permit review for 'the proposed
development of the parcel(s).
18. All required signing and striping shall be done and paid for by the developer/owner. The
signing and striping plans shall be done per the current Caltrans standards and shall be
submitted as a part of the street construction plans for this tentative map to the Public Works
Department for review and approval.
19. The subdivider may either construct the required off-site improvements,when required, prior
to the approval of the final parcel map; or enter into an agreement with the City of Fresno
providing for the construction of the required improvements and sufficient security prior to
the approval of the final parcel map.
SPECIFIC CONDITIONS
STREETS AND RIGHTS-OF-WAY
LOCAL STREETS
South Clara Avenue (55-Foot Local):
20. Dedicate a corner cut for public street purposes at the intersection of South Clara Avenue
and West Almy Avenue for a standard P-28 curb ramp.
21. Construct concrete curb and gutter, built to a 10-foot pattern, in accordance with Public
Works Standard P-5.
22. Construct 20 feet, from face of curb, of permanent asphalt concrete paving in accordance
with Public works Standard P-50.
23. Construct concrete 16-foot return with a P-28 wheel chair ramp, in accordance with Public
Works Standard P-5 and P-27.
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 5
West Almy Avenue (40-Foot Local):
24. Construct concrete curb and gutter, built to a four-foot six-inch pattern, in accordance with
Public Works Standard P-5 and API-3.
25. Construct 15 feet six inches, from face of curb, (or to the center of the street, whichever is
greater) of permanent asphalt concrete paving in accordance with Public Works Standard
P-50.
26. Install"No Parking Anytime"signs on the north side of West Almy Avenue, if not existing on
the south side.
27. Comply with all of the requirements of the Department of Public Works, Engineering Division
memorandum dated May 01, 2007.
SANITARY SEWER SERVICE
The nearest sanitary sewer mains to serve the proposed project are an eight-inch sewer main
located in West Almy Avenue and a six-inch sewer main located in South Clara Avenue.
Sanitary sewer facilities will be available to provide service to the site subject to the following
requirements:
28. Separate sewer house branches are required for each lot.
29. Abandon all existing on-site private sanitary sewer systems.
30. Comply with all of the requirements of the Department of Public Utilities, Planning and
Engineering Division memorandum dated February 23, 2007.
Sanitary Sewer Fees:
31. The following Sewer Connection Charges are due and shall be paid for the project:
a) Sewer Lateral Charge
b) Oversize Sewer Charge
c) Trunk Sewer Charge
d) Sewer Facility Charge
WATER SERVICE
The following conditions are required to provide water service to the development:
32. Separate water services with meter boxes shall be provided for each lot.
33. Seal and abandon existing on-site well(s) in compliance with the State of California Well
Standards, Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno standards.
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 6
34. All public water facilities shall be constructed in accordance with Public Works Department
standards, specifications, and policies.
35. Comply with all of the requirements of the Department of Public Utilities, Water Division
memorandum dated February 13, 2007.
FIRE SERVICE
36. The Fresno Fire Department has no requirements at this time for Vesting Tentative Parcel
Map No. 2006-46.
PARK SERVICE
37. Pay appropriate park facilities fee and/or dedicate lands for park and recreation purposes
pursuant to Ordinance Nos.2005-112 and 2005-113 adopted by the Fresno City Council on
September 27, 2005.
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT (FMFCD)
38. The subdivider shall be required to comply with the specific requirements imposed by the
FMFCD for the subdivision or any amendments or modifications to those requirements
which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the
FMC. These requirements are identified in the attached District's letter to the Planning and
Development Department dated January 29, 2007.
DEVELOPMENT FEES AND CHARGES
This project is subject to the following development fees and charges:
Fresno Metropolitan Flood Control District FEE/RATE
a. Metropolitan Flood Control District Fee $ 5,186.00
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth)
c. Oversize Charge* $0.05/sq. ft. (to 100' depth)
d. Trunk Sewer Chargee N/A
Service Area:
e. Wastewater Facilities Charge* $2,119/living unit
f. House Branch Sewer Chargee N/A
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 7
WATER CONNECTION CHARGES FEE RATE
g. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by owner;
fee for service(s) and Meter(s)
established by the Master Fee
Schedule.
h. Frontage Charge► $6.50/lineal foot
i. Transmission Grid Main Charge► $804/net acre
(parcels under 5 gross acres)
j. Transmission Grid Main Bond $304/net acre
Debt Service Charge► (parcels under 5 gross acres)
k. UGM Water Supply Feet N/A
Service Area:
I. Well Head Treatment Feet N/A
Service Area:
m. Recharge Feet N/A
Service Area:
n. 1994 Bond Debt Service► N/A
Service Area:
DEVELOPMENT IMPACT FEE FEE RATE
o. Fire Facilities Impact Fee - Citywide*`* $539/living unit
p. Park Facility Impact Fee - Citywide+" $3,398/living unit
q. *Quimby Parkland Dedication Feet"' N/A
r. Police Facilities Impact Fee - Citywide+"' $624/living unit
s. Traffic Signal Charge► $414.69/living unit
URBAN GROWTH MANAGEMENT FEE RATE
t. Major Street Charge► N/A
Service Area:
u. Major Street Bridge Charge► N/A
Conditions of Approval
Vesting Tentative Parcel Map No. 2006-46
June 22, 2007
Page 8
Service Area:
v. UGM Grade Separation Fee* N/A
Service Area:
w. UGM Trunk Sewer Charge* N/A
Service Area:
x. Street Acquisition/Construc[ion Chargew N/A
Notes:
"This amount if paid is creditable against the Park Facility Impact Fee.
"* Fee applicable to all maps accepted for filing after August 30, 2005
V Due at time of subdivision.
a• Due at time of development.
♦ Due at occupancy.
.6 Deferrable through Fee Deferral Covenant.
City of
tmC��l���i�
f" u VAI��
DEPARTMENT OF PUBLIC UTILITIES
Date: February 23, 2007
To: PAUL BERNAL, Planner III
Planning and Development Department
From: ROBERT A. DIAZ, Senior Engineering Technician
Department of Public Utilities, Planning and Engineering
Subject: SANITARY SEWER REQUIREMENTS FOR PM-2006-46
General
PM-2006-46 proposes approximately a 0.40-acre of property located on the northwest corner of South
Clara and West Almy Avenues.
Environmental Recommendations
A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts
can be mitigated without further study or are not serious enough to warrant an Environment Impact
Report.
Sanitary Sewer Requirements
The nearest sanitary sewer mains to serve the proposed project are an 8-inch sewer main located in West
Almy Avenue and a 6-inch sewer main located in South Clara Avenue. Sanitary sewer facilities will be
available to provide service to the site subject to the following requirements:
1. Separate sewer house branches are required for each lot.
2. Abandon all existing on-site private sanitary septic systems.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge
2. Oversize Sewer Charge
3. Trunk Sewer Charge
4. Sewer Facility Charge
City of
DEPARTMENT OF PUBLIC UTILITIES
Date: February 02, 2007
To: PAUL BERNAL, Planner III
Planning and Development Department, Current Planning
From: CHRIS WEIBERT, Management Analyst II
Public Utilities Department, Administration
Subject: PM-2006-46 for approximately 0.40 acre of property located on the northwest corner of South
Clara and West Almy Avenues.
Does Project Affect Your Agency/Jurisdiction
No - Project does not directly affect Solid Waste Division
Recommended Conditions of All-proval
None.
Page 1 of 1
City of
r FIk U VA
WATER DIVISION
Date: February 13, 2007
To: DOUG HECKER, Supervising Engineering Technician
Department of Public Utilities, Administration
From: MICHAEL CARBAJAL, Supervising Engineering Technician
Department of Public Utilities, Water Division
Subject: WATER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2006-46
The following conditions are required to provide water service to the development.
1. Separate water services with meters shall be provided to each parcel.
2. Seal and abandon existing on-site well(s) in compliance with the State of California Well
Standards, Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno standards.
3. All public water facilities shall be constructed in accordance with Public Works
Department standards, specifications, and policies.
TAPROJMWEMConditions of ApprovallPM 2006-46 021307.doc
City of
DEPARTMENT OF PUBLIC UTILITIES
Date: February 23, 2007
To: PAUL BERNAL, Planner IIC
Planning and Development Department
From: ROBERT A. DIAZ, Senior Engineering Technician
Department of Public Utilities, Planning and Engineering
Subject: SANITARY SEWER REQUIREMENTS FOR PM-2006-46
General
PM-2006-46 proposes approximately a 0.40-acre of property located on the northwest corner of South
Clara and West Almy Avenues.
Environmental Recommendations
A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts
can be mitigated without further study or are not serious enough to warrant an Environment Impact
Report.
Sanitary Sewer Requirements
The nearest sanitary sewer mains to serve the proposed project are an 8-inch sewer main located in West
Almy Avenue and a 6-inch sewer main located in South Clara Avenue. Sanitary sewer facilities will be
available to provide service to the site subject to the following requirements:
1. Separate sewer house branches are required for each lot.
2. Abandon all existing on-site private sanitary septic systems.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge
2. Oversize Sewer Charge
3. Trunk Sewer Charge
4. Sewer Facility Charge
City of
DATE: May 1, 2007
TO: Will Tackett, Planner II
Development Department, Planning Division, C rent Planning
THROUGH: Louise Gilio, Traffic Planning Supervisor
Public Works Department, Engineering Divisio
FROM: Gregory A. Jenness, Senior Engineering Technicia
Public Works Department, Engineering Division
SUBJECT: Tentative Parcel Map 2006-46, Public Works Conditions of Approval
Location: Northwest corner of South Clara Avenue and West Almy Avenue
Owner: A. K. J. Properties, Inc.
STREET IMPROVEMENT REQUIREMENTS
The Public Works Department, Traffic Planning Section, has completed its review and the following
requirements are to be placed on this tentative map as a condition of approval by the Public Works
Department.
Construct or install the required improvements, or contact Gary Witzel at (559) 621-8725 to enter
into a bonded secured agreement for these improvements. This must be executedrp for to
perfection of this parcel map.
General Conditions
• Submittal of engineered construction plans to the Planning and Development Department for
approval must be made prior to the final map.
• All required signing and striping shall be installed and paid for by the developer/ owner. The
signing and striping plans shall comply with the current Caltrans standards and be submitted as
a part of the street improvement plans.
• Additional offsite improvements will be required at the time of future site plan review.
• Curb ramps are required at all corners within the limits of this parcel map.
• Underground all existing offsite overhead utilities with the limits of this map in accordance with
Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229.
Streets:
South Clara Avenue: Local (55')
1. Dedicate a corner cut for public street purposes at the intersection of South Clara Avenue and West
Almy Avenue for a standard P-28 curb ramp.
2. Construct concrete curb and gutter, built to a 10' pattern, in accordance with Public Works Standard
P-5.
Page 1 of 2
T:\TRAFFIC ENGINEERING\Traffic Planning\Parcel Maps\CONDITIONS OF APPROVAL FOR PARCEL MAPS\TentPM2006-46 Almy&
Clara.doc
3. Construct 20', from face of curb, of permanent asphalt concrete paving in accordance with Public
Works Standard P-50.
4. Construct concrete 16' return with a P-28 wheel chair ramp, in accordance with Public Works
Standard P-5 and P-27.
West Almy Avenue: Local (401
1. Construct concrete curb and gutter, built to a 4'-6" pattern, in accordance with Public Works
Standard P-5 and API-3.
2. Construct 15'-6", from face of curb, (or to the center of the street, whichever is greater) of
permanent asphalt concrete paving in accordance with Public Works Standard P-50.
Install "No Parking Anytime" signs on the north side of West Almy Avenue, if not existing on the
south side.
Page 2of2
TATRAFFIC ENG I NEER I NG\Traffic Planning\Parcel Maps\CONDITIONS OF APPROVAL FOR PARCEL MAPS\TentPM200646 Almy&
Clara.doc
File No.210.411
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER Eq
Mr. Gil Haro, Planning Manager A.K.J. PROPERTIES, INC.
Planning& Development Department 765 W. BARSTOW AVE.
City of Fresno FRESNO, CA. 93706 3
2600 Fresno Street -
Fresno, CA 93721
MAP NO. 2006-046 PRELIMINARY FEE(S) (See below)
DRAINAG AREAS) " CQ - DRAINAGE AREA " CQ " $5,186.00
DATE 2 ��07 DRAINAGE AREA - if -
TOTAL FEE $5,186.00
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the Z
California Environmental Quality Act and the National Environmental Policy Act. The O
District in cooperation with the City and County has developed and adopted the Storm
Drainage and Flood Control Master Plan. Compliance with and implementation of this
Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact
of the project mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance
prior to approval of the final map at the rates in effect at the time of such approval. The fee O
indicated above is based on the tentative map. Contact the FMFCD project engineer prior to
approval of the final map for the fee. O
Considerations which may affect the fee obligation(s) or the timing or form of fee payment:
a) Fees related to undeveloped or phased portions of the project may be deferrable. O
b) Fees may be calculated based on the actual percentage of runoff if different than
that typical for the zone district under which the development is being undertaken
and if permanent provisions are made to assure that the site remains in that
c) Master Plan storm drainage facilities may be constructed, or required to be
constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
2006-046 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO ME'i..JPOLITAN FLOOD CONTROL DIS_AICT
NOTICE OF REQUIREMENTS
Page 2 of 4
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation, reimbursement will be made for the excess costs from
future fees collected by the District from other development.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
1. X a. Drainage from the site shall be directed to adjacent roadways.
b. Grading and drainage patterns shall be as identified on Exhibit No. 1 // 2
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan
Facilities to be constructed by Developer".
X None required.
3. The following final improvement plans shall be submitted to the District for review prior to
final development approval:
Grading Plan Storm Drain Plan Final Map
Street Plan Water& Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify
to the satisfaction of the City of Fresno that runoff can be safely conveyed
to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No. 2 hereof will
provide permanent drainage service.
X c. Permanent drainage service will not be available. The District
recommends temporary facilities until permanent service is available.
d. See Exhibit No. 2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District, necessitating appropriate
floodplain management action. (See attached Floodplain Policy.)
2006-046 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO Mt,.ROPOLITAN FLOOD CONTROL D.,CRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
Appears to be located within a 500 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District.
X Does not appear to be located within a flood prone area.
6. The subject site contains a portion of a canal or pipeline that is used to manage 3
recharge, storm water, and/or flood flows. The existing capacity must be preserved
as part of site development. Additionally, site development may not interfere with
the ability to operate and maintain the canal or pipeline.
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities (State General Permits)require
developers of construction projects disturbing one or more acres, and discharges associated with
industrial activity not otherwise exempt from National Pollutant Discharge Elimination System
(NPDES)permitting, to implement controls to reduce pollutants, prohibit the discharge of waters
other than storm water to the municipal storm drain system, and meet water quality standards. Z
These requirements apply both to pollutants generated during construction, and to those which O
may be generated by operations at the development after construction.
■
a• State General Permit for Storm Water Discharges Associated with Construction
Activities, approved August 1999, (modified December 2002.) A State General
Construction Permit is required for all clearing, grading, and disturbances to the
ground that result in soil disturbance of at least one acre (or less than one acre if part of O
a larger common plan of development or sale). Permittees are required to: submit a
Notice of Intent to be covered and must pay a permit fee to the State Water Resources
Control Board (State Board), develop and implement a storm water pollution
prevention plan, eliminate non-storm water discharges, conduct routine site '
inspections, train employees in permit compliance, and complete an annual O
certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April, 1997 (available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification (SIC) code. The following categories of industries
are generally required to secure an industrial permit: manufacturing; trucking;
recycling; and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board, develop and implement a storm water pollution prevention
plan, eliminate non-storm water discharges, conduct routine site inspections, train
employees in permit compliance, sample storm water runoff and test it for pollutant
indicators, and annually submit a report to the State Board.
2006-046 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO ME1._JPOLITAN FLOOD CONTROL DIS_AICT
NOTICE OF REQUIREMENTS
Page 4 of 4
C. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines (available at the District Office) to
meet the requirements of the State General Permits, eliminate the potential for non-
storm water to enter the municipal storm drain system, and where possible minimize
contact with materials which may contaminate storm water runoff.
8. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
10. X See Exhibit No. 2 for additional comments, recommendations and requirements.
Gerald E. Lakema , Project Engineer: Rick Lyo s
District Engineer
C: LONNIE SCHARDT
4948 W. BLUFF AVE.
FRESNO, CA. 93722
2006.046 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
OTHER REQUIREMENTS
EXHIBIT NO. 2
The following paragraphs only apply towards development of the individual parcels and are not
conditions for the recording of the map.
In an effort to improve storm water runoff quality, outdoor storage areas shall be
constructed and maintained such that material which generates contaminants will not
be conveyed by runoff into the storm drain system.
The District encourages, but does not require that roof drains from non-residential
development be constructed such that they are directed onto and through a
landscaped grassy swale area to filter out pollutants from roof runoff.
Runoff from areas where industrial activities, product, or merchandise come into
contact with and may contaminate storm water must be directed through landscaped
areas or otherwise treated before discharging it off-site or into a storm drain. Roofs
covering such areas are recommended. Cleaning of such areas by sweeping instead
of washing is to be required unless such wash water can be directed to the sanitary
sewer system. Storm drains receiving untreated runoff from such areas that directly
connect to the District's system will not be permitted. Loading docks, depressed
areas, and areas servicing or fueling vehicles are specifically subject to these
requirements. The District's policy governing said industrial site NPDES program
requirements are available. Contract the District's Environmental Department for
further information regarding these policies related to industrial site requirements.
Development No. TPM 2006-046
engr\perm it\exhibit2\city-tpm\2006\2006-046(rl)
TENTATIVE PARCEL vwAP NO. 2006-46
GOVERNMENT CODE§66020(d)(1)
A protest filed pursuant to subdivision (a) shall be filed at the time of approval or
conditional approval of the development or within 90 days after the date of the
imposition of the fees, dedications, reservations, or other exactions to be imposed on a
development project. Each local agency shall provide to the project applicant a notice
in writing at the time of the approval of the project or at the time of the imposition of the
fees, dedications, reservations, or other exactions, a statement of the amount of the
fees or a description of the dedications, reservations, or other exactions, and notification
that the 90-day approval period in which the applicant may protest has begun.
Improvements and payments shall not be required on or in front of any undeveloped
portion of a net acreage of ten acres or more which exists after the division of land. All
improvements and payments to be completed with development.
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth)
c. Oversize Charge* $0.05/sq, ft. (to 100' depth)
d. Trunk Sewer Charger N/A
Service Area:
e. Wastewater Facilities Charge.6 $2,119/living unit
f. House Branch Sewer Charger N/A
WATER CONNECTION CHARGES FEE RATE
g. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by owner;
fee for service(s) and Meter(s)
established by the Master Fee
Schedule.
h. Frontage Charge* $6.50/lineal foot
i. Transmission Grid Main Charge* $804/net acre (parcels under 5 gross
acres)
j. Transmission Grid Main Bond Debt Service Charge* $304/net acre (parcels under 5 gross
acres)
k. UGM Water Supply Feer N/A
Service Area:
I. Well Head Treatment Feer N/A
Service Area:
m. Recharge Feer N/A
Service Area:
n. 1994 Bond Debt Service* N/A
Service Area:
DEVELOPMENT IMPACT FEE FEE RATE
o. Fire Facilities Impact Fee - Citywide*** $539/living unit
p. Park Facility Impact Fee - Citywide+** $3398/living unit
q. *Quimby Parkland Dedication Feet" N/A
r. Police Facilities Impact Fee - Citywide♦** $624/living unit
s. Traffic Signal Charge* $414.69/living unit
URBAN GROWTH MANAGEMENT FEE RATE
t. Major Street Charge► N/A
Service Area:
u. Major Street Bridge Charge► N/A
Service Area:
v. UGM Grade Separation Fee.► N/A
Service Area:
w. UGM Trunk Sewer Charge* N/A
Service Area:
x. Street Acquisition/Construction Charger N/A
Notes:
*This amount if paid is creditable against the Park Facility Impact Fee.
** Fee applicable to all maps accepted for filing after August 30, 2005
r Due at time of subdivision.
4. Due at time of development.
♦ Due at occupancy.
* Deferrable through Fee Deferral Covenant.
Street Name Review
TPM-2006-46 2-20-07
Street Name Status Required Change
East Almy Avenue Chane West Alm Avenue
South Clara Avenue Good
CITY OF FRESNO E200710000354
CATEGORICAL EXEMPTION
ENVIRONMENTAL ASSESSMENT NO. TPM-2006-46
THE PROJECT DESCRIBED HEREIN IS DETERMINED TO BE CATEGORICALLY
EXEMPT FROM THE PREPARATION OF ENVIRONMENTAL DOCUMENTS
PURSUANT TO ARTICLE 19 OF THE STATE CEQA GUIDELINES.
APPLICANT: A.K.J Properties, Inc.
765 West Barstow Avenue
Fresno, California 93706
PROJECT LOCATION: Northwest corner of the intersection of West Almy and South Clara
Avenues
(APN: 329-161-16)
PROJECT DESCRIPTION: Vesting Tentative Parcel Map No. 2006-46 is a request to subdivide
approximately 0.39 acre of R-1 (Single Family Residential) zoned property
into two parcels. The proposed subdivision is consistent with the planned
land use designation of the Southwest Fresno General Neighborhood
Renewal Area Redevelopment Plan, Edison Community Plan and the 2025
Fresno General Plan.
This project is exempt under Section 15315 (Class 15/Minor Land Divisions) of the California
Environmental Quality Act (CEQA) Guidelines.
EXPLANATION: Section 15315 (Class 15/Minor Land Divisions), allows for the division of
property in urbanized areas zoned for residential, commercial, or industrial
uses into four or fewer parcels when the division is in conformance with the
General Plan and zoning, no variances or exceptions are required, all
services and access to the proposed parcels to local standards are
available, the parcel was not involved in a division of a larger parcel within
the previous 2 years, and the parcel does not have an average slope
greater than 20 percent.
Date: June 15, 2007
Prepared By: Will Tackett, Planner III
Submitted by: njy4Z (i ;,,J
Darrell Unruh
L � Planning Manager
D
City of Fresno
JUN 21 2007 Planning and Development Department
(559) 621-8277
FRESNO COUNTY CLERK
B + -
E200710000354