Loading...
HomeMy WebLinkAboutPM 2005-15 - Conditions of Approval - 4/11/2006 FINAL PARCEL MAP CHECKLIST PARCEL MAP NO. 2005 - 15/UCM A PLANNED DEVELOPMENT ctty of FRP--..amu ---m PLANNING AND DEVELOPMENT DEPARTMENT 2600 Fresno Street • Third Floor Nick P.Yovino Fresno, California 93721-3604 Director (559) 621-8722 FAX (559) 498-1020 September 29, 2005 Please reply to: Paul Bernal (559) 621-8073 Lars Andersen & Associates, Inc. Attention: Robert Croeni 4630 West Jacquelyn Avenue, Suite 119 Fresno, California 93722 Dear Applicant: SUBJECT: NOTICE OF CONDITIONAL APPROVAL OF VESTING TENTATIVE PARCEL MAP NO. 2005-15 DATED JULY 20, 2005, PROPOSEING A FIVE LOT PLANNED DEVLEOPMENT PARCEL MAP FOR PROPERTY LOCATED ON THE WEST SIDE OF SOUTH WEST AVENUE BETWEEN WEST DAN RONQUILLO AND WEST NIELSEN AVENUES (APN: 458-060-46, 458-060-48) The City of Fresno Planning Division has completed its review of the subject parcel map dated July 20, 2005. Pursuant to the Fresno Municipal Code FMC Section 12-1205, this letter is written to advise that the conditions of approval dated September 26, 2005, are as noted on the attached document. If you have any questions regarding the conditions notify me at 621-8073 no later than October 14, 2005, to request a review of the conditions. Otherwise, the stipulated conditions of approval are in effect as of that date. No further notice will be sent. Appeal: The divider or any aggrieved person may file an appeal regarding the conditions of approval within fifteen (15) days from the date of approval. To protest the Director's decision regarding the conditions of approval, you must appeal by filing a written appeal with the Director of the Planning and Development Department. The appeal must include the appellant's interest in/or relationship to the subject property, the decision or action appealed, and specific reasons why the appellant believes the decision or action appealed from should not be upheld. Appeals must be submitted to the Director of the Planning and Development Department prior to 5 p.m. on October 14, 2005. EXPIRATION: The conditional approval of Vesting Tentative Parcel Map No. 2005-15 expires two years from the date of approval. The expiration shall terminate all proceedings and a final Parcel Map my not be filed without first processing a new Tentative Parcel Map. • Lars Andersen & Associates Inc. Vesting Tentative Parcel Map No. 2005-15 September 29, 2005 Page 2 Modification of a Vesting Tentative Parcel Map after approval or conditional approval does not extend the two year time limit. EXTENSION: The divider may request an extension of the tentative map expiration date by filing a written application together with the fee set forth in the Master Fee Schedule at the time of the request with the Director of the Planning and Development Department at least thirty days before the expiration date of the map. The applicant must state the reasons requesting the extension. New conditions may be imposed if an extension is granted. An extension may not exceed an aggregate of five years. If you wish additional information please contact the City of Fresno Planning and Development Department, Planning Division, 2600 Fresno Street, Third Floor, Fresno, California 93721-3604; phone, 621-8722. Your inquiry should be directed to Paul Bernal. Sincerely, PLANNING DIVISION r- Paul Bernal Planner III Current Planning Enclosures: Vesting Tentative Parcel Map No. 2005-15 dated July 20, 2005 Conditions of Approval dated September 26, 2005 Conditions of Approval for Site Plan Review Application No. S-04-190 dated November 4, 2004 Letter from the Planning and Development Department dated November 4, 2005 Letters from the Department of Public Works dated August 10, 2005, Public Utilities dated August 1, 2005, and Fresno Metropolitan Flood Control District dated August 3, 2005 ti CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL SEPTEMBER 26, 2005 VESTING TENTATIVE PARCEL MAP No. 2005-15 West side of South West Avenue between Dan Ronquillo and West Nielsen Avenues NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code 66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. Upon conditional approval of Tentative Parcel Map No.2005-15,dated July 20,2005,the subdivider may prepare a Final Parcel Map in accordance with the approved tentative map. Note that a final parcel map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 12-1207 of the FMC,the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 12-1207.2 of the FMC. Concurrent with the filing of a final map and when the provisions of Section 66436 of the Subdivision Map Act apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed final map, together with a copy of SMA Section 66436(a)(3)(A), to any public entity or public utility which has previously acquired a right-of-way easement. LEGAL STATUS OF SITE TO BE SUBDIVIDED 1. The parcel map site was legally created. PLAN CONSISTENCY 2. The subject site is located within the jurisdiction of the Fresno-Chandler Downtown Airport Master and Environs Specific Plan,the Roeding Business Park Plan,the Edison Community Plan and the 2025 Fresno General Plan. The Roeding Business Park Plan, the Edison Community Plan and the 2025 Fresno General Plan designate the parcel map for development with light industrial planned land uses. The Fresno-Chandler Downtown Airport Master and Environs Specific Plan defers designated planned land uses to the underlying community and general plans. However,the Fresno-Chandler Downtown Airport Master and Environs Specific Plan regulates uses and restricts the height of structures within its plan area. The Zoning District Consistency Table of the Fresno Municipal Code identifies light industrial planned land uses as consistent with the M-1 (Light Manufacturing District) zone district. y Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 2 ZONING 3. Comply with provision of the State of California Government Code Sections 66410-66499.58 (the Subdivision Map Act) and the City of Fresno Municipal Code Chapter 12, Article 10 (Subdivision of Real Property). 4. Proposed parcels A, B, C, D, and E are consistent with the M-1/UGM (Light Manufacturing DistricbUrban Growth) zone district. MODIFICATIONS TO PROEPRTY DEVELOPMENT STANDARDS 5. Proposed parcels must be consistent with the M-1 zone district for the parcel map site in terms of lot depth and area subject to approval of a special permit for a planned development project. All parcels must provide access to public street rights-of-way under a planned development special permit. 6. Site Plan Review Application No. S-04-190, which was approved on September 9, 2004, > $ authorized the construction of one commercial building. Site Plan Review No. S-04-190 shall be revised to include the property lines as proposed pursuant to Vesting Tentative Parcel Map fj --- No.2005-15,dated,July 20,2005 thereby authorizing the creation of the commercial planned development. Contact the Planning and Development Department(559-621-8277)for further information regarding the submittal of the revised site plan. 7. Submit draft copies of Covenants,Conditions and Restrictions/Owners Association documents (CC&R's)for review and approval. Final,executed and notarized document are to be located with the parcel map. CC & R's shall conform with the provisions of Section 12-1026 of the Fresno Municipal Code and address ingress, egress, sewer and water service maintenance and access, fire protection, solid waste service, storm drainage, parking and landscaping as follows: i. Cross Access for ingress/egress ii. Cross Drainage as indicated per Fresno Metropolitan Flood Control District iii. Covenant for Shared Parking iv. Covenant to maintain sewer, water and all other utilities V. Covenant for fire protection underground water supplies and Covenant to access buildings vi. Covenant to maintain all landscaping within the limits of this map vii. Covenant for shared solid waste facilities viii. Provide Covenant Agreement for access to land locked parcels ix. Provide Covenant Agreement for maintenance of fire suppression water system 8. The placement of a parcel line in close proximity to any existing and/or proposed structures requires that the structure be found in compliance with the fire resistive standards of the Uniformed Building Code, Chapter 5. In the event the structures do not comply they must be modified so as to meet the requirement. Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 3 9. The proposed structure(s) on the site may be affected due to the location of the proposed parcel lines. Compliance with the prevailing Uniform Building Code as it relates to exterior wall protection, allowable area, etc. (as applicable to new parcel line locations) must be demonstrated prior to final map submittal. Contact the Planning and Development Department, Building and Safety Services Division at (559) 621-8200. GENERAL CONDITIONS 10. All off-site and public improvements shall be constructed in accordance with the Public Works Department Standards, Specifications and Policies. Engineered construction plans and _ estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. 11. Any existing utilities,including but not limited to,street lights,traffic signals,fire hydrants,poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction with the construction of these off-site improvement requirements,shall be the responsibility and at the expense of the subdivider. 12. All existing overhead utilities, including but not limited to, electrical systems, communication systems and street lighting systems shall be placed underground in accordance with the provisions of Section 12-1011, and Section 8-801 of the Fresno Municipal Code, Resolution No. 78-522/88-229, and the policies of the Public Works Department. 13. When streettsafety lighting installations are required,street lighting plans shall be submitted for review and approval by the Traffic Engineer prior to the issuance of permits for the work. Services to street lighting installations shall be separated from the electrical service(s) serving the development. The type,location and service for street lighting installations shall be as determined by the Traffic Engineer. Street lighting installations shall be dedicated to the City upon completion and acceptance of the installations. 14. Sidewalks(including wheelchair ramp landings)and driveway approaches,for undeveloped parcels of this parcel map, shall be required and constructed at the time of site development. 15. Whenever covenants or agreements are required, they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and _ agreements must be approved by the City Attorneys Office and shall be recorded with the final parcel map. 16. Telephone, cable, and other public utilities which propose above-ground facilities (such as cabinets) determined by the Planning and Development Director to be oversized shall be located in an additional easement area outside of the required landscape strip. 17. All work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings(City Council Resolution No.70-36 and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the Public Works Standards. Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 4 18. The subdivider shall dedicate and construct public easements to facilitate the construction of curbs, gutters, sidewalks with street tree wells and irrigation systems (when applicable), permanent pavement, street/safety lighting, bus bays, right turn lanes, bike lanes, bike paths, multi-purpose trail,wheelchair ramps and public utilities in accordance with City plans, ordinances, resolutions and policies, and the Standard Specifications of the Public Works Department within the limits of the parcel map. 19. Existing improvements that are not to the planned alignment shall be removed and required improvements installed to the new street alignment and grade. Existing improvements to remain in place shall be repaired if determined to be damaged and/or off grade by the City Engineer. Existing driveway approaches not identified for current or future utilization shall be removed and sidewalk(when applicable),curb and gutter shall be installed to match existing or proposed street line and grade as determined by the City Engineer. 20. A minimum four foot wide clear path of travel is required along the public sidewalk on all frontages of the property as required by Title 24 of the California Administration Code as determined by the City Engineer. An on-site pedestrian easement and construction of a path may be required if Title 24 provisions cannot be met within the public rights-of-way. All such public easements shall be identified and dedicated with the processing and recordation of the Final Parcel Map and/or at the time of Special Permit review for the proposed development of the parcel(s). 21. All required signing and striping shall be done and paid for by the developer/owner. The signing and striping plans shall be done per the current CalTrans standards and shall be submitted as a part of the street construction plans for this tentative map to the Public Works Department for review and approval. 22. The subdivider may either construct the required off-site improvements,when required,prior to the approval of the final parcel map; or enter into an agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the approval of the final parcel map. SPECIFIC CONDITIONS FIRE SERVICE 23. The Fresno Fire Department requires that covenants for the following: L Covenant for fire protection, and water supply for all parcels inclusive of Vesting Tentative Parcel Map No. 2005-15. STREETS AND RIGHTS-OF-WAY Frontage Improvements (All Streets): 24. Underground all existing offsite overhead utilities within the limits of this map in accordance with Fresno Municipal Code Section 12-1011, 8-801 and Resolution No. 78-522/88-229. Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 5 25. Repair or replace all existing damaged and/or off-grade offsite concrete improvements in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. 26. Install commercial sidewalks along the frontages of Parcels C, and E, per Public Works Standards P-5. 27. Comply with all conditions issued under Site Plan Review Application No. S-04-190 dated August 27, 2004 and the Planning and Development Department letter dated November 4, 2004. 28. Vesting Tentative Parcel Map No. 2005-15 is located within Urban Growth Management (UGM) major street zone E-3. 29. Dedicate ingress/egress easements from proposed landlocked parcels to South West Avenue or West Don Ronquillo Avenue. 30. Comply with the Department of Public Works, Engineering Division memorandum dated August 10, 2005. Sanitary Sewer Service 31. The project developer should contact Wastewater Management Division/Environmental Services (559) 621-5100 regarding conditions of service for special users. 32. Separate sewer house branches are required for each lot. Water Service 33. Separate water services with meter boxes shall be provided to each lot. 34. Installation(s) of public fire hydrant(s) is/are required in accordance with City Standards. FRENSO-CHANDLER DOWNTOWN AIRPORT MASTER AND ENVIRONS PLAN 35. The record property owner shall grant an avigation easement to the City of Fresno. 36. The maximum allowable intensity of use (people per acre) for nonresidential uses is 50 people as defined in Table D-2 (Safety Compatibility Criteria) of the Fresno-Chandler Downtown Airport Master and Environs Plan. Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 6 PLANNING AND DEVELOPMENT DEPARTMENT BUILDING AND SAFETY SERVICE DIVISION 37. The Building and Safety Service Division has indicated that proposed Parcels C and E will jeopardize the integrity of the industrial building pursuant to the California Building Code. The Building and Safety Services Division is requesting the removal of the property line between proposed Parcels C and E. Contact Matt Lopez with the Building and Safety Services Division at (559) 621-8084 for further information. FLOOD CONTROL AND DRAINAGE 38. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District(FMFCD)for the subdivision or any amendments or modifications to those requirements, which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the attached District's letter to the Planning and Development Department dated August 3, 2005. FRESNO IRRIGATION DISTRICT 39. FID has indicated that they do not own, operate, or maintain any facilities located on the subject property. DEVELOPMENT FEES AND CHARGES This project is subject to the following development fees and charges: Fresno Metropolitan Flood Control District FEE/RATE a. Metropolitan Flood Control District Fee $0.00 SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth) c. Oversize Charge* $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charger N/A Service Area: e. Wastewater Facilities Charge. S.T.E.P.♦ f. Copper Avenue Sewer Lift Station Charge* N/A g. Fowler Trunk Sewer Interim Fee Surety* N/A h. House Branch Sewer Charger N/A Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 7 i. Millbrook Overlay Sewer* N/A WATER CONNECTION CHARGES FEE RATE j. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. k. Frontage Charge* $6.50/lineal foot I. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross acres or more) m. Transmission Grid Main Bond Debt Service Charge w► $243/gross acre (parcels 5 gross acres or more) n. UGM Water Supply Feet $371/11ving unit equivalent Service Area: 401 s o. Well Head Treatment Feet $31/living unit equivalent Service Area: 401 p. Recharge Feet $0/living unit equivalent Service Area: 401 q. 1994 Bond Debt Service* $0/living unit equivalent Service Area: 401 DEVELOPMENT IMPACT FEE FEE RATE r. Northeast Fresno Policing Area. N/A r. Traffic Signal Charge* $0.29/sq.ft t URBAN GROWTH MANAGEMENT FEE RATE t. UGM Fire Station Capital Fee* $1600/gross acre Service Area: undesignated u. UGM Park Fee* $858/gross acre Service Area: 3 v. Major Street Charge* $4053/adj. acre Service Area: E-3 Conditions of Approval Vesting Tentative Parcel Map No. 2005-15 September 26, 2005 Page 8 w. Major Street Bridge Charge* $232/adj. acre Service Area: E-3 x. UGM Grade Separation Fee* N/A Service Area: y. UGM Trunk Sewer Charge* N/A Service Area: Herndon z. Street Acquisition/Construction Charger N/A Notes: ♦ Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program(STEP)as determined by the Department of Public Utilities,Wastewater Division,Environmental Services Section(559-621- 5153). 4 Due at time of development �► Deferrable through Fee Deferral Covenant. r Due at time of subdivision. t Building areas to be calculated to the nearest square foot. Subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. KAMaster Files-Parcel Maps\Parcel Maps 2005\TPM 2005-15 West side of S West Ave btw W Neilsen&W Don Ronquillo--PB\Conditions of Approval 9-26-05 TPM-2005-15.doc City of M 1iI PLANNING AND DEVELOPMENT DEPARTMENT DATE: September 29, 2005 TO: NICK P. YOVINO, Director Planning and Development Departmen THROUGH: GILBERT J. HARO, Planning Mana Planning Division FROM: PAUL BERNAL, Planner Illy Planning Division SUBJECT: REQUIRED FINDINGS AND APPROVAL OF VESTING TENTATIVE PARCEL MAP NO. 2005-15, WHICH PROPOSES TO CREATE FIVE PARCEL PLANNED DEVELOPMENT FOR PROPERTY LOCATED ON THE WEST SIDE OF SOUTH WEST AVENUES BETWEEN WEST DAN RONOUILLO AND WEST NIELSEN AVENUES BACKGROUND Vesting Tentative Parcel Map No. 2005-15 filed by Lars Andersen &Associates Inc., on behalf of Horizon Enterprises,and accepted for processing on July 20,2005,proposes to create a five parcel industrial planned development for approximately 9.52 acres of M-1/UGM (Light Manufacturing Districf/Urban Growth Managemeno zoned property located on the west side of South West Avenue between West Dan Ronquillo and West Nielsen Avenues. The property is within the jurisdiction of the Fresno-Chandler Downtown Airport Master and Environs Plan, the Roeding Business Park Redevelopment Plan,the Edison Community Plan and the 2025 Fresno General Plan. The Roeding Business Park Redevelopment Plan, the Edison Community Plan and the 2025 Fresno General Plan designate the subject property for light industrial planned land uses. The Fresno-Chandler Downtown Airport Master and Environs Specific Plan defers designated planned land uses to the underlying community and general plans. However,the Fresno-Chandler Downtown Airport Master and Environs Specific Plan regulates uses and restricts the height of structures within its plan area. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan the M-1 zone district is consistent with the planned land use designation of light industrial. Site Plan Review Application No.S-04-190,which was approved by the Planning and Development Department Director on September 9,2004,proposed to develop 3.03 acres of the overall 9.52 acre site with a 51,720 square foot industrial building with three future industrial building pads. The applicant, at that time, indicated the building was to be used for warehousing. During the construction of the industrial building the property owner filed Vesting Tentative Parcel Map No. 2005-15 requesting to subdivide the 9.52 acres into a five lot parcel map planned development. Vesting Tentative Parcel Map No. 2005-15 is proposing to create parcels that deviate from the property development standards of the M-1 zone district. The parcels proposed do not abut a public street or right-of-way. Pursuant to Section 12-407.5 of the Fresno Municipal Code (FMC) the Director may modify property development standards of the underlying zone district subject to the filing of a single unified project,which is covered entirely by a site plan review(S-04-190). Staff will require that the applicant revise Site Plan Review Application No. S-04-190 depicting the property Lars Andersen &Associates, Inc. Vesting Tentative Parcel Map No.2005-15 September 29, 2005 Page 2 lines as proposed pursuant to Vesting Tentative Parcel Map No.2005-15. These conditions,as well other responding agencies conditions have been incorporated into the Conditions of Approval dated September 26, 2005, for Vesting Tentative Parcel Map No. 2005-15. REQUIRED FINDINGS The initial study prepared for Environmental Assessment No.TPM No.2005-15 considered potential environmental impacts associated with the parcel map. The study indicates that the project, if approved, would conform to the land se designation and land use policies of the 2025 Fresno General Plan and is within the scopeof the Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding,, of conformity to the 2025 Fresno General Plan Master Environmental Impact Report(MEIR No. 10130)dated September 29,2005,which incorporates a MEIR Mitigation Monitoring Checklist. STATE SUBDIVISION MAP ACT The Subdivision Map Act (Californiaovernment Code Section 66410 et. seq.) requires that a proposed parcel map not be approved unless the map,together with its design and improvement,is found to be consistent with the General',Plan and any applicable specific plan(Finding No. 1 below). State law further provides that the proposed parcel map be denied approval if any one of the Finding Nos. 2-5, below, is made in the negative. 1. The proposed parcel map,toga her with its design and improvements is consistent with the City's Fresno-Chandler Downto n Airport Master and Environs Plan,the Roeding Business Park Redevelopment Plan,the dison Community Plan and the 2025 Fresno General Plan. The Roeding Business Park R development Plan, the Edison Community Plan and the 2025 Fresno General Plan des! nate the site for light industrial planned land uses which is consistent with the M-1 zone d strict as identified in Table 2 of the 2025 Fresno General Plan. 2. The site is physically suitable for the proposed development because of the flat terrain of the site and adequate access and drainage on and off the site. The Fresno Metropolitan Flood Control District will require that,,the drainage from the site be diverted to the Master Plan Inlets. 3. The proposed parcel map design and improvements are not likely to cause substantial and considerable damage to the natural environment,including fish,wildlife or their habitat.The site is located in an area that is fully developed with industrial uses. The area does not and would not provide value for wildlife. 4. The proposed parcel map design and improvements are not likely to cause serious public health and safety problems,because the conditions of approval have shown and will insure that the subdivision conforms with City health and safety standards. In addition, during the entitlement process,staff will ensure that the conditions of zoning will be applied accordingly. 5. The proposed parcel map design will not conflict with pubic easements within or through the site because conditions of approval will assure noninterference with any existing or proposed public easements. i Lars Andersen &Associates, Inc. Vesting Tentative Parcel Map No. 2005-15 September 29, 2005 Page 3 Staff, based on its own analysis, has determined that the parcel map,subject to the recommended conditions of approval,otherwise complies with the design and property development standards of the Zoning Ordinance and local Parcel Map Ordinance and recommends the approval of the parcel map. DIRECTOR DETERMINATION 1. Based upon the above analysis,the Planning and Development Director finds that Tentative Parcel Map No. 2005-15 dated July 20, 2005, is consistent with the applicable plans and policies of the City of Fresno. 2. The Planning and Development Director hereby grants approval of Vesting Tentative Parcel Map No. 2005-15 dated July 20, 2005, subject to the conditions of approval dated September 26, 2005, and to become effective on September 29, 2005. 47'28-c-7'S 7aaips k P. Yovino, Director Date K:\Master Res-Parcel Maps\Parcel 2005\TPM 2005-15 West side o1 S West Ave btw W Neilsen&W Don Ronquillo—PB\Director Memorandum 9-26-05 TPM-2005.15.doc 00962 7 FINDING OF CONFORMITY UNDIER MEIR NO. 10130: NOTICE IS HEREBY GIVEN THAT pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act) the projects described below have been determined to be within, the scope of the Master Environmental Impact Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan. EA No. R-05-22/T-5449: Valley Pack Builders, Inc., has filed Rezone Application No. R-05-22 and Tentative Tract Mop No. 5449 for approximately 35.8 gross acres of property located on the north side of East Butler Avenue between South Peach and South Minnewawa Avenues. Rezone Application No. R-05-22 proposes to rezone the subject property from the AL-20 (Limited Twenty Acre Agriculture, County of Fresno) zone district to the R-1 (Single Falmily Residential) zone district. The tentative tract map proposes to subdivide the subject property into 111-lot single family residential subdivision with one remainder lot with an overall density of 4.45 units per acre. The project also includes the detachment of the subject property from the Fresno County Fire Protection District and the Kings River Conservation District for which the Fresno County Local Agency Formation Commission (LAFCO) is the responsible agency. EA No. R-05-43/T-5456: Granite Bay Capital Group has filed Rezone Application No. R-05-43 and Vesting Tentative Tract Map No. 5456 regarding approximately 51.41 acres located on the northeast comer of West Madison and South Valentine Avenues. The rezone application proposes to amend the zoning from AL-20 (Limited 20 Acre Agricultural, Fresno County) to 1,R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone district. The Vesting tentative tract map proposes to subdivide the subject property for a 214-lot single family residential subdivision and a 4.25 acre remainder parcel. The project also includes the detachment of the subject property from the North Central Fire Protection 'District and the Kings River Conservation District for which the Fresno County Local Agency Formation Commission (LAFCO) is the responsible agency. EA No. TPM 2005-15: Horizon Enterprises has filed Vesting Tentative Parcel Map No. 2005-15 pertaining to approximately 9.52 acres of M-1/UGM (Light Manufacturing Dishict/Urban Growth Management) zoned property located on the west side of South West Avenue between West Dan konquillo and West Nielsen Avenues. The parcel map is proposing to subdivide the subjlect site into a five lot industrial planned development parcel map. EA No. Byrd-Clovis No. 1: Spencer Enterprises has filed the Byrd-Clovis No. 1 Reorganization which proposes the detachment of approximately 12 acres on the northeast comer of South Clovis and East Byrd Avenues from the Fresno County Fire Protection District and the Kings River Conservation District and annexation to the City of Fresno. EA No. Heaton-Buraan No. 113: Centex Homes has filed the Heaton-Burgan No. 113 Reorganization which proposes the detachment of approximately 2.2 acres east of the northeast corner of South Burgan and East Heaton (alignment) Avenues from the Fresno County Fire Protection District and the Kings River Conservation District and annexation to the City of Fresno. EA No. R-05-50: Fancher Creek Properties has filed rezone Application No. R-05-50 regarding 49 acres of property located on the northeast and southwest corners of South Clovis Avenue and the East Tulare Avenue alignment. The rezone application is requesting a rezone from the AE-5 (Five Acre Agriculture Exclusive) zone district to the C-3/UGM/cz (Regional Commercial/Urban Growth Management/conditions of zoning) zone district to facilitate the development of a regional shopping center as part of the Fancher Creek Development Project. Pursuant to Section 21157.1 of CEQA, it may be determined that a subsequent project falls within the scope of a MEIR provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Since the projects do not change the land use indicated for the subject properties by the 2025 Fresno General Plan and will not generate significant effects not previously identified by the MEIR staff has determined that the subject applications are within the scope of the MEIR and, as such, shall be subject to the appropriate mitigation measures contained therein as required by Section 15177 of the CEQA Guidelines. In addition, the project was part of Environmental Impact Report No. 10133 prepared for the Fancher Creek Development project, which was certified by the City Council on May 17, 2005. This project shall be subject to all mitigation measures as stipulated in EIR No. 10133. Pursuant to Section 21157.1 of CEQA, it may be determined that a subsequent project falls within the scope of a MEIR provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Since the projects do not change the land use indicated for the subject properties by the 2025 Fresno General Plan and will not generate significant effects not previously identified by the MEIR staff has determined that the subject applications are within the scope of the MEIR and, as such, shall be subject to the appropriate mitigation measures contained therein as required by Section 15177 of the CEQA Guidelines. No additional specific mitigation measures will be required of the projects. ANY INTERESTED PERSON may comment on the environmental conformity finding findings to the Fresno City Planning Commission, Fresno City Hall, 2600 Fresno Street, Fresno, California 93721-3604. Public hearings have been tentatively scheduled before the City of Fresno Planning Commission on Wednesday, October 19, 2005, beginning at 6:00 p.m. A comment must be in writing and must state (1) the appellant's name and address, (2) the appellant's interest in or relationship to the project, (3) the decision being appealed, and (4) the specific reason(s) why such decision should not be upheld. Any comment must be submitted on or before October 19, 2005. Your remarks are welcomed and will be considered in the final decision. Additional information on the proposed projects, including copies of the environmental finding, may be obtained from the City of Fresno Planning and Development Department, City Hall, 2600 Fresno Street, Room 3043, Fresno, California, or contact Dawn Marple at (559) 621-8058 for EA No. R-05-22/T-5449, Bruce Barnes at (559) 621-8047 for EA No. R-05-43(T-5456, Paul Bernal at (559) 621-8073 EA No. TPM 2005-15, Shelby Chamberlain at (559) 621-8042 for EA No. Byrd-Clovis No. 1 EA No. Heaton-Burgan No. 1B or Mike Sanchez (559) 621- 8040 for EA No. R-05-50 Do Not Publish Sign-Off and Identification Below This Line r tanning and Development Depa4 t City of Fresno PUBLICATION DATE: September 29, 2005 CITY OF FRESNO—ENVIRONMENTAL ASSESSMENT/INITIAL STUDY FINDING OF CONFORMITY/MSIR NO. 10130 Pursuant to Section 21157.1 of the California Public Resource Code DATE RECEIV*"ED 14 F (California Environmental Quality Act) the project described below is r� determined to be within the scope of the Master Environmental Impact Report � `c (MSIR) No. 10130 prepared for the 2025 Fresno General Plan 50 0A p Initial study is on file in the Planning and Development Department, City Hall, y 2600 Fresno Street, Fresno, California 93721 0 (559) 621-8277 Applicant: Initial Study Prepared By: Horizon Enterprises Paul Bernal, Planner III 586 West Barstow Avenue September 29, 2005 Fresno, California 93704 Environmental Assessment Number: Project Location (including APN): Vesting Tentative Parcel Map No. 2005-15 West side of South West Avenue between West Dan Ronquillo and West Nielsen Avenues (APN: 458-060-46, 458-060-48) Project Description: The applicant, Horizon Enterprises, has filed Vesting Tentative Parcel Map No. 2005-15 pertaining to approximately 9.52 acres of M-1/UGM (Light Manufacturing District/Urban Growth Management] zoned property located on the west side of South West Avenue between West Dan Ronquillo and West Nielsen Avenues. Vesting Tentative Parcel Map No. 2005-15 is proposing to subdivide the subject site into a five lot industrial planned development parcel map. The property is within the jurisdictions of the Fresno-Chandler Downtown Airport Master and Environs Plan, the Roeding Business Park Redevelopment Plan, the Edison Community Plan and the 2025 Fresno General Plan. The Roeding Business Park Redevelopment Plan, the Edison Community Plan and the 2025 Fresno General Plan designate the subject site for light industrial planned land uses which is consistent with the M-1 zone district. The Fresno-Chandler Downtown Airport Master and Environs Specific Plan defers designated planned land uses to the underlying community and general plans. However, the Fresno-Chandler Downtown Airport Master and Environs Specific Plan regulates uses and restricts the height of structures within its plan area. The subject property is currently developed with one industrial building and is single-family residence and is surrounded by industrial and rural residential uses to the north, and vacant property to the east, south and west. Conformance to Master Environmental Impact Report(MEIR NO. 10130): The recently adopted 2025 Fresno General Plan, Roeding Business Park Redevelopment Plan and the Edison Community Plan designate the subject site for light industrial planned land uses. The M-1/UGM zone district of the subject property conforms to the light industrial planned land use designation pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan. The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated the proposed tentative parcel map in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report (MEIR) No. 10130. The subject property is developed with one industrial building and is planned to have three more additional buildings which will be constructed at a future time. The site would be developed at an intensity and scale that is permitted by the planned land use designation and zoning for the subject site. Thus, the parcel map will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned land use designation. Moreover, it is not expected that the future development will adversely impact existing city service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). LA. x x x W 51 NQ n c r � MA *iPG O w t lF �'Y+ a L 'exy W r9 m tt tNYf� � > 7 at <.ti IL Z a I I p W W IL V G o E W a LL. a RE C ,� o .; a.: � > CL CL CL CL �o C z G E W `om ZZ �> � m Z W_ Iu Q v Q Q f= J31Wmmm c � � � s9 CL �yy tQ CL a IL C W DI JZ Z S W� c 9 ° m -5� r W > 2g y` aao moo � � m m m p ft Lt�so c m W W m o 1= � �s cm �� ' 9 LL �a � y'CA4 Ia s � M� m� � ;3 � L • � R ° me ' so a C U Qs 3� m -S g azaar ��� c E ago m Q ZO N m `O W eZI- 0 W o� W ° t0 1FS 3C 11 N U A o o _ a m ° $ o U C ao :g m m n $ m c ao Q 0 IL 4f D m 3 1 rn Zi ` -� &-a WO m E"� ao .� $ �w C W my m m E� • i.n = ao a► t m ao u ` cc W � � � o N � a o m m a� � m m � m� 19 g l mig 0 cc m' m c�4.1�J : .1� c d5 e anm o� 3' T I u. fa I a ocmi _a we Co �o � � � goaa Jac Baa> N e tso cc C E m !I E4o.c `9 mWAs m `� mW � m m m ° �C aO c : 3•:y O o S � �� ° m Amo -9� 0 8.00 in 9 > m1$ I I C �.Q C C CJS I ° C ° fp- � e,.S� -C ca d m > m m E i EA�� m C m > IA m�< m 3 a m LA < QEmmy E > o � � o ZCC d o �nmc J4o �°c39 20, 56 � 8LU 2 CC -- ° «. a OD O J m m O.cm > i0 m� m C > m � 7 at m v m a� E m o E� m e-2 a m > c m a m m 3 5 O r o m m m w E N �d m e m ao e?�et � �� 0. IL LU 2 m 0 o.mM ° — 40 0 o.o .�+-a E m 8 Pim a :66.A � - x W X X X X D N D E N o 4c, 8 CL m O aZ C LLI W W cm— cp ocacmE° om tacc mcaoE E mo s uoE aa15 a = cd Camta 0 ° c' LCm o o �> � 0 > 30 >Q a c m a C m a C m a c m p O W _c m co _ St m cow c m c 0 St m co ,- `" V > Bccac� a '� � �� � �c� cm � oa � c m �� c m M m M � - c m CL CL m o d- m o CL a- go CL rL m o Z _ o W m o` W F- 7a 3 i0 °o Q CA Z y W >W 0 := o> o> c$ c 0 I- a = 2 amc aycc acm c oa 3 � 2m o� Ec ao � a a - z a = c � ��2 � � o o a . 93. o o.- " Lu C.) m acdc$ Goma a` aE c VZ L m p y O i0 fn m m � O m = c mmCi Vcmm3mm 3C N`ms �yc m ' cd LU � d � m m mato ' m ° moEimm maoc� cd a c e u, Q c•y IL 2Z O a ��m Lo3� cmc sm E' o = L -cc cd p w cI W E :>%cm I-- cc O a( -:r (D o '0 >cc 0 m o Zm coOm - y `m m0mm � "LWy tA m _ V F- io �► m m m m fn m m p a �.cp ip cc Q.- cm m Z �:. o m c mu; EmW " rmt rom � O N a o c o m o,m m m c t o m m `0 a m c m ac i gym• vic " m >,� o� m . Eo ymm co _v (aC Uo 13 " aim >, crocc > 3 E " ac obm3a mp cin m . � N ' o . i > m.19 mEo � poo� mg . -W CL Tc3 Q. v i� m _oEo- Q. - " -�. Q 1QOW- cm oE �cQ ao mmrico ~m yc a°mmm m W cc E mEm c = ° vm w > mm ' m c� w N 3 m 0O,E �m -ac a�co EE o o ` ca � -W W - " aCaEc mm `- ocUm2Em mmc yU > ` cm m m mOm - aj E `Z o oul CL.- 0. - mi W qwt` SCM �y 1k Nr w t i 7F„i P1r j EE:, \' > r-1.xI .ah+ Y �l+.s j`ix1.,x i�r }.erA.U� +,1 i 4 Ra`�t#S r„. ,K`�; T N a r F � t � = rte' , STt a � �Fi� t `i`�J1� ` �� * > >p�r: w,n# � o�:.\�,e�.ykJ.•y�xe 3 Av a r �\�ST ��r N>i .1l` rl.�'�.�,\l1 p�R ^�M1 G` M 6A Q�L `� i.N TC YI• �♦ ow eua�. m az p W W LL LU cis IL a ME 0 O LU > o� ; W X X X X Ln N p , E aN. m X x a # S a +P FAN `F P; y \ •,. P Fm.YI.^ M �� d ' Q A aZ p W co S2 I I Q p w a a.C > > > p _a a a a W Oa Ea 0 � c � c � c vo o `0 `0 c� oc c Amo � m � cmc cmc c c c � Q rymr y °c_'or c0 a) co 0c°oE Ey my Ey O 0W co-maco cc cmm Emm cmco c- r rgm rm > a= -0a a_ c > a c > c > a Cmco co_ co;- cc > a a_ a_ a_ m - c m (1) m m m co m m co m m m m m m.. mom. m .. aoo aoo a.00 aoo 0 -3 Z W W I- g� ww c c c s c s c co 0 o O o 0 W c c c c Ci Ci Q � Y = c c c c c pa 3 _j 0 0 0 0 0 0 0 CL r a ° ° m Q Q c W C c Z y � _ _ 4C LU 0 aC3 cc m� m � ca ca m m ` c_0 E E c cc or t 2 3 ra o - ° m m c>i m C- w y m O 1 O m L O gC c r�tEr � m cm > �� Q o m wiov c3 = Om � o � �m j y OC y a U m .0 .�7. •L 0 m t m co.(a m 7 m` U a 0 C! J Z -0 0 c m c m m o y m c > m a m 7 7 72 -a a Q aN C � 0Ec � mc°n CL � c 0 � y moiny cmc � m oC cm I- W 0 'a m m m m� C = m � m CD'o g E co c � Z � t � 0 io m ` - Z c t 3 7 t c M m m o m .E Con-a c c o � W LO m y « > Co U C a > C Co m C O m m 0 mg Ln of mccmy cc Baca >.L � m c '�'EL ma`oE C.) 0E any N ZO ca (D 3y 'm t m L m m `° aC �Er. mr � m o C fO 3 y o 7 .. � m :: v y o` o E m m-om >% m = m 0N y `o= m -0 o ni� 0 m c mcg La> aC C•F- I I m o co m C V C o j = 7 m 0 cm m N O ._. U O.m a C m U O j o c yam : E E y 7 c m E �v y °- E m e `a m o 7 � co c � y � 0 7 � O E C � Q O m a 0 cp 'a c m•>� y m ` m m ` m - Z m a mat y y m U 7 0 m 'C ... _ O m - m cc m .e is O)V W = m cam¢ c ¢ m v E > y >- m > 3 -- -0 o t � S m .- m 7 3 � as _ y U to C 0 Q W 0mcoa E _ c3 o '� m ° o aioc o o memo `° m > 3 '0 m v W ¢ cc C - C m > m O E m M .0 = m m O C 3 io co m m Q y y y 1- p o m m m m 0 io - mt c m $ c E —S 2 0 3 m c m m pm (!1 N Ego-> 3 � t c� L > v y E 0 a cx c Co c m0 CDo m � 3, m a W CX oNOmmm mmy ° �cn c � � o � m > � c-° U � 3umi� $ y � m V N - m ic = in C CL w W C m A -e A m r X U O Q 0 7 C ` 7 Z yt m 3 o V m O cc �a .3 '� ca >m ` C E m m y Cmo m m m o m C '0 L C - m m m Z 0 m y M Cr Cf m co 0 ° c o O ` C C cc m .y. Q O C io m m m t O ?L L m o m " C co co C'C m t`A 7 y c0 3 C 7 -0 c 0 0� y m ca co fA C �o._ m ` y O T - C« y y 0 m c0 a m (n 7 0 Cl 3 m 0-0 - m io co m !n I_' C C - 7 U m C lL a m C Q y 3 fn y C m O y y V 7 a m m 7 m 3y E OLS c m c 0 0 m m e 0 C2 c E 5 -a �-o a 0_ t E- U > o' 6c`n° � 7 0 `�° Lm.o-0 E am m E - a N o m CD a0 m :s - .. o m y 3 am E c� 0 E - 0 m12 t M m C!- 0 O �' Z.7 t y C'L C cot y L O O m t 0 m U m m V Cm C 0 to m C t > y E m c m c y 7 7 V -3 m v C!D co Co 7 U O 0 Z t O r m m N -0 3 m m -0 m U t y C m c m 'C m ` C'y C C 0 m O • ic E C O m m � 0 mCD Y � 3ca � 3 � � � vim cca mac- 'comms .0 Em` c CL ca - y C 0 �, w O a m O 7 y a� m m y m m O - E E ,C E O m m 0 0 - m U a� a cc° �ocm�t Eco 3oco m ro y M t m > m y Cm a 0 - m c3c c m y 7 m E m v > m � co a y O -C p ioa�� mTD amism= t Q m o aom mC Ct co mcc a > 7 `mM UEc I I L C co E= t C m m C m > L m c 2 y m L 7 y O 'd m y o - 3 0 m Q m Z y co m m co L O y _ Cl L y L L co _m_ c m y c 7 o m m y as Et >, O°E a 0 a� CO a> U x m aE =o Q >� m c>.ia y �y umi E o m U L m m m V U - 0 -- n U m° a U p io v m r m m v w V L 7 a m C O t m L _ m m` m t E C N $ m j m V O C t C L 7 Q ~ c ,� ~ M :3 ~ v co s FL- m ~,`_c0 m3s a ~� c o` F- 'a° o =OM ~ cU U n -m am civ c �� o m ui °fes m � ti aE ao c mam aim = baa a G `o 3 m 'mC G cc°� G mt w C =° m C m co md 6 a c m m C aye C m GNm IL X X X W X ti t x X b X9�w X 4 1 8"N' X $ Z �} 6 ,r2 4v RIP mit s�� .`•fit' "�{: Y . rf �e a.Z r Q W I 1 WtL C)CL m LL ME mmm ° — ''� cc arc a a CD WX13 a w > m 'm m m 3 O Moo a0a !CL aa Z Z W M W Ws 5 0 cm O a 3 J o ' o 0' O L u v CL_ W co cm 0 0 31 Zcc � � a m ao V mE cm� $ 3 to p -2 1 1 cc N 2 t o E � $ °cm 0 a $ 31 3 1 9!0 CM I I o $ 0 Ccc 71 jog ass CL Wcm $ � 0.8 51 m �m m ; tea m m ° Ea � m E m ca � a$ m �' ° ° 0 � 2 �� 0 coo 0 cd cco V CL c o N � • 0 0 0`t m E coo m m aaco a= E = m c m CIA i I -§ z . _� $ am � $� aom �o '� aoc 4 m c 1 'ao .c � m m � I t C a H m fic 9 60 3 • ao +W� taa o c s 0 ao c m m m y $ a oz� o c t- c— ' rm 0 m o � $ $ tm � 1 � � C c $adoc 0m y� aom c0 ¢ c 3 ° m ~ Z06 rE4 r L r a0 • N o0 v? Ot i7 �jE rmo i° 0 � c a W E O W V W V 3 _ a0 .6 C7 - m tL ao c 3 fi V IL _ 1 LL x x t S W X X X X LC) Nm N a O X ¢ 7, �LCD v W {ntla U a. a co coIn a C ii W m co 5 ma V w LL. Z � m m mmm m oai Q p a E QQ m o,o n o Wa .0 CL .0 0 ,0 - if O aa a � mm a jCm -0 E cm cm �- c° E mE m E i9 E Co) � � `o v, `o00 `oy CL ma- o co ao 4 O W mo m 'm C m 0 m C m C m r � a_ a= -0 a= ci C > 'C a> C > > V mr mr Cm mr � m comm - m m inD mo 0-5 LL. aO a. 00 ao CL Z W ° j o > > W Z 0) oc C o 0 0 0 -0 2,0 2 ZZ c •- mmo c � c Z ae WW a- Eco ao 0 0 0` cis o� cm �om� 3i� c 0 c c c -' a._ a._ ao c c ao c C CL j = 3a aom � a0 o` o` oom� o'om W Q O as O c c 2 c aa a �'aa•a CC m i° OU On Ommm Occmm VZ L m C -0-0 m m Z m my m m m mt m 0 aim wU W L m m C C a 0 - U m >, 0 m .= U uJ l� .a M � p C U m m m w >+ CL w M3:cc- ° oL (a m � v, 'a '' m m w >%0 O � m� o cm c � O C c E �aIn cl. ura cocU c cm aE mi°vic a 'ocaa corn Z O � �tA m c c E M av ° 3 m Ejv c > Dam 0. a` Q JN c0r� c� `° mcc c cm � .. > > > mmm m = 1° c > c Q C mum -- ca0Mc � m ° cow " ac � Etca > CcM cn I- W O co m - > U" m 3a onm m Cm rn m ur WLL (n ° m c E o c° m r cmi o ; m m �� 0a C m am c c o p °aZ`ccar m�m e aE o 3 �� m a c � = °-o cis E E o CM CL � ctsE ' aC� > � E m c 0 m c 0 o m v m e n m ci r= iq C ZN cammEOmc 1- - mcoio 16m C = ow cm _ c m m E c o � vim Coo O m c m av 0 o am 6 0 0 m M ioC7 m m urs 0 UD ctccCD _ mm> iyy9ccw `ID o .E yo � m � � � � � °� m mtm- cE- E ul r0 CJ m cc ca S E m (n a U m a N m C C C m L y '� C m — y Z. .. � ra ._ j;- M c Co oar m u, m c 3.0_ W 5D - C. C - mwv m m0 0 � 0 � cc-�_m mmim �o - _ . ... W c 000 •- m mbeco 0 o m m ._ E =0 cCm Q = $ ma�m� � mm � � am ma tm. � � moc 3m N0 W 1D - 3 am rn am c C - ° ° o m -- o c- m E- N m CD m cnm mQ� ? m m X y mL5 m v cc v m m c > m m Q W � � E °mv� ~moo � c m� u, m cmi � m CD nL m > Ern � ¢� E > m >. m c m .. vmE ca m3 foo gym $ 3 ,°-4 ` � m° o maw ao mmmm CEO =Z Z c'E m °cc= m y m m m al o y yo y m Er O m c0 E= c U Y p (n m . m U L C t c0 _ m` cn H m03moE`� ` ;m 3ymc mo cm Eo fi° oc� m x c - ca w o ° co 0 Q o ¢ m am mt -- 'o � v myQ 0 0 0 _._ m > Cy � 0Lo a t3 c � 5mamm m - m c - mm ma g� mm mi9 Lh H 0 m CIS Cc c m � m a ni c `� mL a m co 0 3Ut m - ; a o O > m rn- W 0 a m m m E a° > m vi m e m Ct m y > or m c 0 3 C C t m °C 'a t uJ j y o 0 m y U m >. o — c0 _ � - - c0 N a.m y m 3 C a 10 a'Z.- cp Co0. 1] m uJ O C a1 m 0 y m � EUU c° o ` 0ma � c ° E mCo mm00 Eomwem t°m Z mo oy mo0 > E ��0 In Ey vcis Eca COL $_ m'M.e acs UC p m m m C t`°j W a'(j > l0-•U W i m m O` o -0 m C.l y m m y F.. m O m a0 C w U C m m cc a c O a- wcA,' '> ¢ E c m 0cc> m m 'C min m > O m m y m E3 m� m aCO° m`� m 0 co m o -' mLt m m o cn �, co r 0 E= m E ¢ m t ¢ mas i = tom Lto m m> > >.r ._ .0Cc cd -aEmyom Z m m m m o m w mL y '0in > E '� = m m umi = E 3 m occ ° m c m Q �.3 -- vm = mm � C W- n. cIScIS -0 a� 4 �.m � - 0 mom > c m - c C O 0 W (� o co m m m m C7 � t U �¢ m y m 4 o o� m m ur m� +� mV� c Emo mvo m o mC= mo m ..� - m m amo N HoEm3oa� gym � 5nmc to ° m mew ° m >� `� Lmamamo O m m m= a °af°a CJ o m� m a o� m � 'C rno m ,. cim0 .0 > cc vom Mi > •- cm mavo - U 7 0 mt > U C ` m •- aac a. N C E CL LLU. mm3-0mm LL. aE LL. m;sm cz aL 2Q _ mcom mwy3m LL. X : X X X rt LU 8 Q ���MlP c 1{'j ti �� � x:� 1 t MP a - ,�i...,{ '-f r r .� Yy ""'°'Rr•t4 �t N K-; + \\ a. `N n Try; +�� ' ,v �'.{<xr y tr�a ui a a `I�^ 'i+t \tIW v h. ryvS f: gat, l�id1'i �i +S\K1. ­-T�+ 1 ^33� "k5 'wu^ e`t` e"e Q I W W IL � m o :3Wcm Q p p Cok W o m 2 m V > ' o m m ark ac a ac ac cm cm cm W $ h- � S .� aa .. o .. c a c a`o c c to c LU 5 13901 L -J IL e U < a aQ �C m , o m o �m W 0c cc cm coo cc 0 UA cd ao C mr�`o m � m m Z m d 00 > m a ul 0 0 ZmO _ � `m ISO � � $ V cm °u� caorm .9 $ moa �� m o m cm 00 2 PL 73 y W a VL0, 3 z �F� tog I a m c m$$. co � cd F- mca $ m ° m � mcsI m 1 `0 j 273 CL 73 0 o ° � m X12 I .S23� C-C a m o omo $mm ° �. m _ Fes- $ sg ,- E �> ° mC cE m m3 I I z t 3$ mU m am a �� Z c m c � m W °Das-0 c c w c c - m m m � 'A � am c ge mOC a0 ° 2 2m.2 � z $ Hca = m mC � �� C � m 3a� mm w ' ° 3 0 ° m" = $ = 1ae0 -0 � � 0 ��. m mem �� aha . roc <tAmUi3 < ao 1 m LL X :_ W X X X X 3 Lo E 4 a, N A. o CL U ` U•a `o o- X `., X O � Z � 1 I D LU � o � o W1L V m m m mt: m m m m m ZD a az :° az a a a a — 42y J W c m C m 0 c C m y 13 c m C co m cd cc C m a - 1 -6 m a � Con. CM CL. aiaa 0'cc n. 0'cd a 0'a 0'n. � � co So.S2•- .9O-C So — 0 � o So T— OW cm c0 E cCCmo cm cm am cm r (> > co m m N E m m N r0 m m m m as aaxU a.a=rn as as as as Z CD c G o � W � c '0 ` CJ QJ Y W aa� mc �' Crn c 0cocm SO - a ovy c a � r 3 � �E � 0 0 0 = mom ° W4 a 0 OE O. �c c IC cc Ocymm °D a Q W O U C t m m r.0 O t CD ° m m ° NO y L F y 7 cd `p pd'0 0 " m m V aC3 = moo cpa '-•o � mt m E m �' N ° m m z E y c m > c E as `vim O c a c cL z - c Y m � : .0 3 y a •-0 c ° a ° ZQ O mCD m p � corn m3 — > rf. �' vm >. _ icm :3 aQ JZ EL co 0 y ..�U E m y m C N c m 3 C m y o c c m Q {N L E L > m C d N C m �l N y (p cC'O CDco m y O m m O C F- Q O c _ co �j co (A yc LL my E F� m � 0 m o E 0 ° c (� LL a p mC — L ZC c 0 0- m y C = yC co OF O L Y . _(' co CL � D1 " Et f° o E o 0 3 m o '0 >. 0 c %6 -0 m � • ` CL(a Ov m � N myy >.Eio �� y3ci 0 m 3 m a OE-jW 3 z or cm �o= Z y m O m m C O m y U W Z y 0 0 N am c .0 E - -C y m m aL .-. E oZU E cL m y 1 1 O y ` cn O O �L m m ci e m �> CD U C CD ` Z'c m W -- C.) my U n•U c m e o ' a v 0 CtsEL- > Y CL "E o o c c 31 m2 Ua co — ,—. m 'E � - a. > y m > U cy mcm o ° ram '0 mcdEcd 3m co mm ,_ o _ -- _.. ° m m m C c0 ° _ m C > O- O _ y. m C C W n.E E a 0 m m � o -� m m C= m L c y m m CC o 0 Q W me c 0- (a = yo u Co c mc nm �°1 '0 Cd � � cCEm Q oo 0 Udo.0 c w Q . -- -- — ;a y C9 IL co ni c m '- - o > n -> CD 0m— ac5 CIS y cc ilC Q yo �— E � m— Cto m c� co L Cl f— (n O CoQ! C a — m m 0=y > `L. N O. O co m > m y m O � mYZ y Lcop � ` of _ C °'LO Ea 'Cca > C n. E0C a a m y y y m E y n O 7 C C 0 C N m N U m m d Cl p O W m a m Oma E '- CD m � ro ._ m-0m mEcoa vio m c scot o m E 2 'o c a °tom = o m �' c cC 0' E o c" CD 0 Z C C m0 � -:S "•y rn i m in y m E m Q p`p c '0 m U U p C •y 7 V m m Z O U O y co N C CD U p rl rl m m y m coy a c� x C O 0vtc ci0EE -a _ �F ° 0 m � m coni v vi 0 Lm. c ° � cn � Cm0 m ` co c � Emm mm `° c m � pa•V, aim m E cpOm mcn - 0EU m Q L m m co S p t N co O= U pl — m E �_ cp m m m co y a ^p — y E 0 U 7'C min y p co p 0 0 O m o E 0 C L L C O � y y c > 0 m o L O c W O c y a U d E 3 E 'a 0 — m m `� c y cOp y C a �..� y y co m C CISC" U y m D 0 •` y L y y y C Co p C F m C or m ..+ co m "' J V m C Q co co r y O.= 0 al p y m >— O O m m t y U: C E N m am E - Z— m � St � aE o 0 > E p Qm � 0 m m m Q v E y O = °= C p O C O C O_O_ 7 N `m 0 L m m E U L L y F m G v, o � o ° C > N mommom m `om ° o cc � > U a �3ch,c � 3mm �a om m > m m y co c co ° rD m W > Z C L m C N y y y co , ip Gf O.to Z 3 m �0 U 'cp U - y 7 y V y 1) ID y Q U m rA C m co m t c y L C O 9 _ CL Uin 0 m � O a y p .r y a fo y O. E m cc m m y p =E o O 7 p r- Y y m c0 O F C - O .- C+0 C F- v C E 'c uai mQ c c o'm — : C a v C T'- mn to V E — C c_ o a a= o �o aims •- m co0 =mE — a Cococa = Nm tv � � mco0mU Qao ° m m � moc Emc� � ma -o -o cc m w y c "� E y m Z m3 � m m ..� (a LmLm.. y °'ID cc 0 m a � m C co 31 Z.oo w Q � yY co _ �oL 0 m O-C m o o �.S a acc E c c ai _ c m c '0 os Q c = mL m TZ E s CD CLm c Cr car- c Co m (.U � y � c°� V c E W L � m _ Q .. C O O > U a covcn > LmLco -O3co �cCm CD a(j0= 3va ` 3itcot_ m cm m Q E•N c = te— cdr E o m m m ' t0 ~ `� Q c m m N m m ~ 0 0 m Q c m mcB O ° m C° co y y u9 m y v U 7 O.v co N m= .. �f '0 c0 CO �i O m Q1 r Cm N m y O L Y y E C r 7 a y O > a m � . OU 0 � orna,- � Y ai YLL ma P E . . . Y5 :° m -j co m E 0 m f 7y� � W cm N V .' CL F E m II 3 az p ii W m �' tit LL. LL 09a ac O Q W • r V > > $ Z Q WCL W W 3LU � 00. p� W (,� i 2; $a R cc W to 3 c Oo L Z $ • n.a �W � � s CN Y cc o m lu 3 or Lo a a N z �� •� g� X12 <m � m a � im vE �E City of r�11C�i:�i►�` PUBLIC WORKS DEPARTMENT City Hall•(5591,321-8800 Mike T.Kim Fresno 2600 Fresno Street Interim Directornd nmcacm Fresno, California 93721-3615 t�I 111 www.fresno.gov 3000 November 8, 2004 Keith A. Harris Span Construction and Engineering, Inc. 1841 Howard Road Madera, Ca. 93637 SUBJECT: REQUEST FOR A SIDEWALK WAIVER AT 186 SOUTH WEST AVENUE Dear Mr. Harris: Your request for a waiver of the requirement to construct sidewalk and a handicapped ramp on the aforementioned property is granted because the subject property is zoned M -1 and your request meets the requirements of the Fresno Municipal Code section 11-208 (17)(1)(1). Additionally, the requirement to dedicate pedestrian easements is waived being as sidewalks are not being installed. Please call Gary Witzel at 621-8681 if you have any questions. Sincerely, y V- Z- ��F Mike T. Kirn Interim Director MK/GW/Hams C:S-04-190 Dawn Marple,planner II RECEIVED NOV 1 2 2004 SPAN CONST. &ENG, INC. K City of DATE: August 10, 2005 TO: Paul Bernal, Planner II Development Department, Planning Division THROUGH: >PLouise Monroe, Traffic Planning Supervisor Public Works Department, Engineering Division / P 9 9 FROM: Gregory A. Jenness, Senior Engineering Technicia Public Works Department, Engineering Division SUBJECT: Tentative Parcel Map 2005-15 Public Works Conditions of Approval Location: Northwest corner of South West Avenue and West Dan Ronquillo Owner: Steve Weil / Horizon Enterprises The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. Offsite improvements shall be installed or an executed, secured written agreement to improve the required offsite improvements is required, prior to acceptance and approval of the final subdivision map by Council. General Conditions: • All survey monuments within the area of construction shall be preserved or reset by a person licensed to practice Land Surveying in the State of California. • Repair or replace all existing damaged and/or off-grade offsite concrete improvements in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. • Additional offsite improvements will be required at the time of future site plan review. • Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. Frontage Improvement Requirements: 1. Install commercial sidewalks along the frontages of Parcels "C" & "E", per Public Works Standard P- 5. Specific Requirements: 1. This parcel map will generate 68 a.m./65 p.m. peak hour trips and generate a daily count of 468 V.T.D., therefore a Traffic Impact Study (TIS) is not required. 2. Comply with all conditions of S-04-190. 3. Dedicate ingress-egress easement from proposed landlocked Parcels "B"to South West Avenue or West Don Ronquillo Avenue. Show easements on this Map. UGM Requirements: This Map is in UGM major street zone E-3. Page 1 of 1 0AParcel Maps\TentPM200515 Ronquillo&West.doc City of DEPARTMENT OF PUBLIC UTILITIES Date: August 01, 2005 To: PAUL BERNAL, Planner III Planning and Development Department, Current Planning From: DOUG HECKER, Supervising Engineering Technician Public Utilities Department, Planning and Engineering Division Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR PM-2005-15 General PM-2005-1 5 located on the West side of South West Avenue between Dan Ronquillo and West Nielsen Avenues. Environmental Recommendations ANEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environment Impact Report. Sanitary Sewer Requirements Sanitary sewer facilities are available to provide service to the site subject to the following requirements: The project developer should contact Wastewater Management Division/Environmental Services(5 59) 621-5100 regarding conditions of service for special users. Separate sewer house branches are required for each lot. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: Sewer Lateral Charge Oversize Sewer Charge Sewer Facility Charge(Non-Residential) Upon connection of this Project to the City Sewer System the owner shall be subject to payment of Seger Facility charges per Fresno Municipal Code Section 9-505.1 and 9-505.2. Sewer Facility Charges consist of two components, a Wastewater Facilities Charge and Trunk Sewer Charge where applicable. Sewer Facility Charges are collected after occupancy on a bi-monthly basis over time based on metered (water or sewer effluent) usage. The developer may contact the Department of Public Utilities (559) 621-8554 to receive an estimated cost of the Sewer Facility Charges applicable to the project (based on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. Sanitary Sewer Comments Trunk Service Basin Marks Water Requirements Water facilities are available to provide service to the site subject to the following requirements: Separate water services with meter boxes shall be provided to each lot. Installation(s) of public fire hydrant(s) is/are required in accordance with City Standards. Water Fees Payment for installation of water service(s) and/or meter(s) is required. Water Connection Charges are due and shall be paid for the Project. File No.210.411 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager HORIZON ENTERPRISES Planning & Development Department 586 W. BARSTO W AVE. City of Fresno FRESNO, CA 2600 Fresno Street - Fresno, CA 93721 MAP NO. 2005-015 PRELIMINARY FEE(S) (See below) DRAINAGE AREA(S) It RR it DRAINAGE AREA " RR " $0.00 DATE B— 3 _p S DRAINAGE AREA - - TOTAL FEE $0.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The O District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee O indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. O Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. O b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 2005.015 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall be directed to Adjacent Roadways b. Grading and drainage patterns shall be as identified on Exhibit No. 1 // 2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". X None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: Grading Plan Storm Drain Plan Final Map Street Plan Water& Sewer Plan Other 4. Availability of drainage facilities: X a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: X Appears to be located within a X 500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy Does not appear to be located within a flood prone area. 2005-015 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Z Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections,train employees O in permit compliance, and complete an annual certification of compliance. ■ O b. State General Permit for Storm Water Discharges Associated with Industrial Activities, O April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; O recycling; and waste and hazardous waste management. Specific exemptions exist for ML manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 2005-015 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 8. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendations and requirements. Gerald E. Lakeman, roject Engineer: Joshua S. L. Mehr District Engineer C: LARS ANDERSEN 4630 W. JACQUELYN #119 FRESNO, CA zoos-ois 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document OTHER REQUIREMENTS EXHIBIT NO. 2 In an effort to improve storm water runoff quality, outdoor storage areas shall be constructed and maintained such that material which generates contaminants will not be conveyed by runoff into the storm drain system. The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities, product, or merchandise come into contact with and may contaminate storm water must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing is to be required unless such wash water can be directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas that directly connect to the District's system will not be permitted. Loading docks,depressed areas,and areas servicing or fueling vehicles are specifically subject to these requirements. The District's policy governing said industrial site NPDES program requirements are attached. Development No. TPM 2005-015 engr\perm it\exh ibiC\city-tpm0005U005-0150sm) FLOOD PLAIN POLICY Primary Flood Plains Because of the relatively high velocities and volumes of flood flow associated with primary flood plains, and because the primary flood plain is responsible for passing the greatest percentage of the flood event,development located in such flood plains is subject to substantial risk,both to itself and to others as a result of the potential for blockage and diversion of flood waters. In view of these factors, the following policy statement is proposed: Policy 1) All proposed development activity shall be the subject of a detailed hydrological flood hazard investigation to determine the relationship of the proposed development to the secondary flood plain and the primary flood plain; and,further, to identify the estimated high water elevation of the 100- year flood event. 2) All development and/or permanent improvement activity which, if located within the primary floodway, may unduly impede, retard, or change the direction of flow of water either, by itself, or by the catching or collecting of other debris or is placed where the flow of water would carry such obstruction downstream to the damage or detriment of either life or property, should not be permitted. Secondary Flood Plains Because development within secondary flood plains is subject to inundation,but without the threat of increased velocities of flood waters, and because the excessive development:of the secondary flood plain can result in increased water surface elevations through displacement of flood waters, the following policy statement is suggested: Policy I) Development in secondary flood plains is generally acceptable when a detailed hydrological flood hazard investigation report had been prepared indicating that the area proposed for development is located within a secondary as opposed to a primary flood plain. 2) The development must be properly flood proofed below the estimated high water elevation of the 100-year flood event. 3) The development is accomplished in such a way as to prohibit the displacement of any and all flood waters from that portion of the flood plain to be developed. engr\engrform\floodplain policy-form STATE OF CALIFORNIA—BUSINESS.TRANSPORTAT ND HOUSING AGENCY ARNOLD SCHWARZENEGGER,Governor DEPARTMENT OF TRANSPORTATION 1352 WEST OLIVE AVENUE P.O.BOX 12616 FRESNO,CA 93778-2616 PHONE (559)445-6666 _ Flex your power! FAX (559)488-4088 Be energy efficient! TTY (559)488-4066 . CITY Ci= July 26, 2005 2131-IGR/CEQA 6-FRE-180-55.5+/- TPM 2005-15 Mr. Paul Bernal City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Bernal: We have completed our review of the parcel map proposing to divide a 393,380 square-foot parcel into 5 parcels. The subject parcel is located on the west side of South West Avenue between Dan Ronquillo and West Nielsen Avenues. Caltrans has the following comments: There is insufficient information contained in the application to determine this project's impacts to the transportation/circulation system. Per the ITE Trip Generation Handbook, Seventh Edition, using the square footage remaining after deducting for setbacks, etc., along with the zoning, this project may generate more than 100 peak hour trips. It is Caltrans' understanding that the 2025 General Plan MEIR requires projects that will produce 100 or more peak-hour trips to evaluate the project's contribution to increased peak- hour vehicle delay at major street intersections adjacent or proximate to the project site (Mitigation Measure B-4). Caltrans recommends that the applicant conduct a Traffic Impact Study(TIS) at this, the parcel map stage, in order to fully assess the project-related impacts to the State Highway System and the pro-rata fair share towards area-wide circulation improvements. As per the City's policy, please have the preparer of the traffic study reference the Caltrans Guide for the Preparation of Traffic Impact Studies, dated December 2002, and send the scope of the TIS to Caltrans before the traffic study is conducted. Caltrans Guide,while advisory, contains Best Practices and gives insight into Caltrans' expectations when reviewing a traffic study. If the traffic consultant has any issues or concerns regarding the use of the Guide or its interpretation, please contact us so resolution can be reached. Caltrans also requests that we be provided an opportunity to review specific development proposals for these parcels. We request that this letter be made part of the permanent record for this project and that a copy of our letter be included in the staff reports for both the City Council and the Planning Commission. "Caltrans improves mobility across California" Mr. Paul Bernal July 26, 2005 Page 2 This will provide the decision-making body and the general public with a complete and accurate environmental evaluation for the project. If you have any questions, please call me at (559) 445-6666. Sincerely, MOSES STITES Office of Transportation Planning District 6 C: Ms. Barbara Goodwin, Executive Director, Council of Fresno County Governments "Caltrans improves mobility across California" OFFICES OF PHONE(559)233-7181 FAX(559)23,-8227 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725-2218 Your Most Valuable Resource-Water July 25, 2005 Mr. Paul Bernal City of Fresno Planning and Development Dept. 2600 Fresno Street, 3rd Floor Fresno, CA 93721-3604 RE: VTPM No. 2005-15 Dear Mr. Bernal: FID's comments and requests are as follows: 1. FID does not own, operate or maintain any facilities located on the applicants property. 2. FID expects no adverse impacts from the approval of the subject proposal. Thank you for submitting this for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 317 or bjohnson@fresnoirrigation.com. Sincerely, Bret Johnson Engineering Technician I Agencies\City\PM2005-15 BOARD OF President JACOB ANDRESEN, Vice-President JEFFERY G. BOSWELL DIRECTORS JEFF NEELY,EDDIE NIEDERFRANK,STEVEN G.BALLS, General Manager GARY SERRATO Street Name Review TPM-2005-15 7-21-05 Street Name Status Required Change West Nielson Avenue Chane West Nielsen Avenue Don Ron uillo Avenue Chane West Dan Ron uillo Drive South West Avenue Good City of ICI�IL�Iii►���I/� Planning & Development Department 2600 Fresno Street • Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559)621-8277 FAX(559)488-1020 July 5, 2005 Please reply to: Paul Bernal (559)621-8073 Lars Andersen & Associates, Inc. 4630 West Jacquelyn Avenue, Suite 119 Fresno, California 93722 SUBJECT: VERIFICATION OF APPLICATION DOCUMENT FOR TENTATIVE PARCEL MAP NO. 2005-15 FOR PROPERTY LOCATED ON THE WEST SIDE OF SOUTH WEST AVENUE BETWEEN WEST DON RONQUILLO AND WEST NIELSON AVENUES. In accordance with Section 12-1005 of the Fresno Municipal Code, the above-noted tentative parcel map application, has been reviewed for completeness of form and content. The map, as submitted does not provide all of the information necessary to consider the application as complete. The attached checklist and marked-up copy of the tentative parcel map indicate the information that must be added or modified in order to render the tentative parcel map complete and acceptable for processing. Please refer to all items on the check list with this symbol. Prior to submittal, please submit two copies of the revised tentative parcel map for pre-filing review. When the tentative map is correct and acceptable for processing your submission should consist of 25 copies (provide one 11"x 17" in addition) of the tentative parcel map. Should you have any questions or require additional information please contact me at the number listed above. Sincerely, PLANNING DIVISION Paul Bernal Planner III Enclosures: Verification Checklist for Tentative Parcel Map No. 2005-15 Tentative Parcel Map No. 2005-15 y City of Planning & Development Department Planning Division oftE.M11IM, 2600 Fresno Street Fresno, CA 93721-3604 Phone (559)621-8277 VERIFICATION CHECKLIST Tentative Parcel Map No. 2005-15 Reviewed by. Paul Bernal Date: July 5, 2005 FORM AND CONTENT OF TENTATIVE PARCEL MAPS AND RELATED APPLICATIONS (Pursuant to Fresno Municipal Code Section 12-1205) Form Updated November 22,2004 Legend: ok— Item appears satisfactory or complete as shown. NA— Item is not applicable * - Item needs to be noted, corrected and/or clarified DSL 1) A preliminary parcel map shall be filed with the Director.The preliminary map shall be submitted on a sheet 18 by 26 inches or 460 by 660 millimeters. A marginal line shall be drawn completely around each sheet, leaving an entirely blank margin of one inch or .025 millimeters. The map shall be legibly drawn on tracing paper, suitable for reproduction to a scale and in a manner to best illustrate the proposed division. A marginal line shall be drawn completely around the sheet leaving an entirely blank margin of one inch. The following information shall be shown on the map: 2) The boundary lines of the entire parcel including the area to be divided, with dimensions, based on existing survey data or property descriptions. 3) The proposed division lines with dimensions. 4) Identification of each parcel with a letter designation. 5) All existing buildings and structures located on the land to be divided, together with their major exterior dimensions and distance from said buildings and structures to the boundary lines of the parcels which are to be created by the proposed land division. 6) The location of existing wells, septic tanks, leaching fields, and house branch sewer lines and water lines. 7) The location and names of all abutting streets, alleys, and easements. 8) The location and widths of any streets, alleys, and easements proposed by the subdivider. 9) Source of data from which the map was drawn. - Vesting Tentative Parcel Map No.�,_,.,j5-15 July 5,2005 Page 2 10) Name, address, and telephone number of the person preparing the map and any record owner of the land. 11) For residential parcel maps, a statement indicating how the parcel map design provides, to the extent feasible, for passive and natural heating or cooling opportunities and for other measures that conserve nonrenewable energy resources. 12) Such additional information as the Director deems necessary, including but not limited to the information required by Sections 12-1004 and 12-1009 of the Fresno Municipal Code (Additional information is listed below). 13) A"vesting tentative parcel map"shall have clearly printed on its face the words vesting tentative parcel map. FORM AND CONTENT OF RELATED APPLIcATIONs Applications related to a tentative parcel map that are submitted prior to or concurrently with a tentative parcel map shall contain clear, legible and accurate information. Such applications may include the following: ,L(,t 14) Environmental Assessment Application 15) Rezone Application 16) Urban Growth Management Application 17) Special Permit Application 18) Request for Modification of Standards-creating lots that do not comply with the property development standards of the zone district. 19) Internal Consistency of Applications: a) Information presented in each application must be consistent with information presented in related applications and on the tentative tract map. — Owner/Applicant are not consistent, nor is the zone district. b) Site plans, drawings and other graphic materials that are part of a special permit application must be consistent with the tentative tract map. C) An application for rezoning of property with the boundaries of a tentative tract map must contain a legal description of the property to be rezoned that is consistent with the tentative tract map. —Apply for a rezone application. Vesting Tentative Parcel Map No.�--15-15 July 5,2005 Page 3 The following features shall be shown accurately to a distance of two hundred feet from the proposed subdivision boundary. 20) Existing zoning (Including the existing zoning of the subject property). 21) Parcel boundary lines. 22) Easements affecting the subdivision. 23) Locations and widths of existing streets and rights-of-way. 24) Location and width of existing improvements, including sewer, water, storm lines, concrete curb, gutter, sidewalk, and pavement, and location of street lights and traffic signals. U 25) Existing land uses. Provide a copy of the deeds for the subject property and/or title report. KWaster Files-Parcel Maps\Parcel Maps 200WPM-2005-15 West side of S West Ave b1:w'+N Neilsen&W Don Ronquillo--P81Parcel Map Checklist Form.doc