Loading...
HomeMy WebLinkAboutPM 2004-20 - Agreement/Covenant - 12/14/2005 When Recorded Mail To: 05 Z0050Z9Z1Z1 _. City Clerk ; 1Z1141Z0 . City of Fresno 2600 Fresno Street Fresno, CA 93721-3603 NO FEE-GOVERNMENT CODE 6103 and 27383 CITY of FRESNO Public Works Department CC P.W. File No. 5494 . O LL. - O V W co W J CL SUBDIVISION AGREEMENT PARCEL MAP NO. 2004-20 4: i Subdivision Agreement Parcel Map No. 2004-20 Page 2 THIS AGREEMENT is made this 7-2 "'o day of kaVE/"G C-R 2005, by and between the City of Fresno, a Municipal Corporation, hereinafter referred to as "City," and, RANCHO HUEVO CREMA, a California Limited Partnership, hereinafter referred to as "Subdivider without regard for number or gender. RECITALS A. The Subdivider has filed with the City, a Parcel Map which proposes the subdivision of land owned by Subdivider, situated in the City of Fresno, County of Fresno, State of California, dividing.the real property more particularly described as follows: Parcel A of Parcel Map No. 2004-20 as recorded in Book (05 of Parcel Maps at Page(s) 4r? , Fresno County Records. - B. The City requires, as a condition precedent to the acceptance and approval of said Parcel Map, the dedication of streets, highways, public-places and easements as are delineated on the Parcel Map,and deems such dedications as necessary for the public use; and, requires the construction of improvements of the streets delineated on the.Parcel Map. C. Section 12-1206 of the Fresno Municipal Code requires the Subdivider to either construct or enter into an Agreement whereby Subdivider agrees to perform and complete the work and improvements required as Conditions of Approval for Tentative Parcel Map No.2004-20 dated September 24, 2004 issued.by the City and any amendments thereto (hereinafter referred to as Conditions of Approval and incorporated into this agreement by this reference), in consideration of the'approval of the Parcel Map for recording. Subdivision Agreement Parcel Map No. 2004-20 Page 3 AGREEMENT In consideration of the approval of said Parcel Map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and City, and the Subdivider and City do hereby mutually agree as follows: 1. The Subdivider shall perform the work and improvements at the time a permit or other grant of approval for development of the parcel is issued by the City or before one (1) year of the date of this agreement, whichever occurs first, unless prior to this date of performance an extension of time is approved by the Public Works Director. 2. Prior to the commencement of the work, the Subdivider shall submit engineered construction plans to the City Engineer for review and approval. The cost to prepare and process such plans,and the inspection of such work,shall be the responsibility of the Subdivider. The work shall be performed and inspected under a'Street Work Permit issued by the Public Works Department pursuant to such approved construction plans. 3. All of the work and improvements and materials shall be performed, installed, and provided in accordance with the 2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution No. 70-36 and Resolution No. 84-361) and any amendments thereto, hereinafter referred to as the"Public Works Standards,"which are incorporated herein as though set forth in full. All of said work and improvements shall also comply with the requirements of Chapter 12, Articles 10 and 12 of the Fresno Municipal Code. In situations where there are no Public Works Standards for an item of work, it is agreed that such work shall be performed in accordance with the standards and specifications of the State of California, Department of Transportation as determined by-the City Engineer. 4. The work and improvements are stipulated in the Conditions of Approval and include Subdivision Agreement Parcel Map No. 2004-20 Page 4 the following: N a. All utility systems shall be installed underground. Subdivider's attention is directed to the installation of street lights in accordance with Resolution No. 78-522. The Subdivider shall construct a complete underground street light system as approved by the City Engineer prior to final acceptance of the parcel map. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 78-522 and shall be approved by the City Engineer. b. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. C. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9,Article 5 of the Fresno Municipal Code and all applicable charges shall apply. ..d. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno Municipal Code. e. Set all landmarks, monuments and lot corners required to locate land divisions shown on the Parcel Map. f. The improvements are more particularly itemized in Exhibit"A.2", attached hereto and made a part of this Agreement. 5. Prior to the approval of the Parcel Map by the City, the Subdivider shall furnish to the City the following securities in the amounts itemized in said Exhibit "A.1"., Bonds shall be by one or more duly authorized corporate sureties subject to the approval of the City and on forms furnished by the City. a. PERFORMANCE SECURITY. Total amount to equal 100%of the Final Cost Estimate to be conditioned upon the faithful performance of this agreement. i. 95% of the Final Cost Estimate shall be in the form of a bond or irrevocable instrument of credit; and ii. 5% of the Final Cost Estimate shall be in cash or a certificate of deposit. b.. PAYMENT SECURITY. Total amount to equal 50% of the Final Cost Estimate to secure payment to all contractors and subcontractors performing work on said Subdivision Agreement Parcel Map No. 2004-20 Page 5 improvements and all persons furnishing labor, materials, or equipment to them for said improvements. Payment Security shall be in the form of a bond or irrevocable instrument of credit. 6. Prior to the approval of the Parcel Map by the'City, the Subdivider shall pay to the City and/or execute a covenant to defer certain impact fees due which are eligible to be deferred. pursuant to FMC Section 12-4.604, the total fees and charges due as a condition of Parcel Map approval. The total fees and charges are more particularly itemized in Exhibit B, attached hereto and made a part of this Agreement. 7. Upon acceptance of the required work by the City Engineer,a warranty security shall be furnished to or retained by City in the minimum amount identified,in said Exhibit "A.1", for guarantee and.warranty of the work for a period of one (1) year following acceptance against any defective work or labor done.or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a certificate of deposit. The warranty security shall be returned to the Subdivider, less any amount required to be used for fulfillment of the warranty .one (1) year after final acceptance of the subdivision improvement. 8. The Subdivider and his contractor and subcontractors shall pay for any materials, provisions, provender, and other supplies or terms used in, upon,for, or about the performance of the work contracted to be done and for any work or labor thereon of any kind and for amounts due under the Unemployment Insurance Act of the State of California with respect to such work or labor and shall file with City pursuant to Section 3800 of the Labor Code a Certificate of Workers Compensation and shall maintain a valid policy of Workers Compensation Insurance for the duration of the period of construction. 9. The City shall not be liable to the Subdivider or to,any other person, firm or i Subdivision Agreement Parcel Map No. 2004-20 Page 6 corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement, or any part thereof. The Subdivider hereby releases and agrees to indemnify,defend and save the City harmless from.and against any and all personal injuries to and deaths of persons and property damage, and all claims demands, costs, loss, damage, and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work and improvements to be done in and upon the street rights-of-way in the subdivision or upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries.to and deaths of persons, and all claims,demands,costs,liability,loss,damage,howsoever caused,either directly or indirectly made or suffered by the Subdivider, or his agents, employees and subcontractors, in connection with the work and improvements required by this Agreement. The Subdivider further agrees that the use for any purpose and by any person of any of the streets, work or improvements specified in or required by this. Agreement or the Parcel. Map, shall be at the sole and exclusive risk of the Subdivider at all times prior to the final acceptance of the work and improvements by the City. 10. Initial compaction and soil tests of street, sewer, and other work within the public right-of-way shall be ordered by and paid for by City. Sewer and utility trench tests shall be taken in varying locations and depths as required by the City Engineer. Compaction tests failin to meet City's requirements shall be recorded by City from the same testing laboratory. Billing for the required retests shall be made directly to the Subdivider or his agent for payment. Compaction test for water facilities installed by City shall be paid for by City. 11. Subdivider shall comply with the provisions of the prevailing Building, Plumbing, Mechanical, Electrical and Zoning Codes and any other Codes of the City. 12. It shall be the responsibility of.the Subdivider to coordinate all work done by his Subdivision Agreement Parcel Map No. 2004-20 Page 7 contractors and subcontractors, such as scheduling the sequence. of operations and the determination of liability if one operation delays another. In no case shall representatives of the City be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. 13. Wheneverthe Subdivider varies the period during which work is carried on each day, he shall give due notice to the City Engineer so that proper inspection may be provided. Any work done in the absence of the City Engineer will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his obligations to fulfill the Agreement as prescribed. Defective work shall be made good and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the City Engineer and accepted: 14. Any damage to the sewer system, concrete work, or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before bonds are released or final acceptance of the work and improvements. 15. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced until the paving of the streets are completed. "Adequate dust control"as used herein shall mean the sprinkling of the streets with water or the laying of a dust coat of oil % on with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the:opinion of the City Engineer adequate dust control is not being maintained on any street or Subdivision Agreement Parcel Map No. 2004-20 Page 8 streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person who has signed this agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If within 24 hours after such personal service of such notice or within 48 hours after the mailing thereof as herein provided, the Subdivider.shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or oiling. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within 14 calendar days,and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 16. The Subdivider shall install all street improvements in .accordance with Section. 12-1206 of the Municipal Code of the City of Fresno, the,Public ,Works Standards, and the approved construction plans. 17. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains,gas mains,and their respective service connections,shall be completed in the streets and alleys before starting the street and alley surfacing: 18. Time is of the essence of this Agreement. The provisions contained in this Subdivision Agreement Parcel Map No. 2004-20 Page 9 Agreement are intended by the parties to run with the land, and the same shall bind and inure to the benefit of the parties hereto, their heirs, successors in interest, and assigns. 19. No assignment of this Agreement or of any, duty or obligation of performance hereunder shall be. made in whole or in part by.the Subdivider without the written consent of the City. Subdivision Agreement Parcel Map No. 2004-20 Page 10 P` 1 The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation RANCHO HUEVO CREMA DAVID D. HEALEY, Director a California Limited Partnership Public Works Department By: Siskin Ranchos Inc., j =T"''`,yn a California Corporation, its General Partner By: ' KL Michael T. Kirn, Assistant Director By: MSKshall I. Siskin, President APPROVED AS TO FORM: HILDA CANTO MONTOY City Attorney (Attach Notary Acknowledgments) By L(2 Deputy City of Fresno Mailing Address: Type/Print Subdivider's Mailing Address: P160 0,1- V4 , Public Works Director Public Works Department /„r,�ST (-DS rS, c-3. 9 2600 Fresno Street. Fresno, CA 93721-3615 V. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California ss. County of G S On NQ'y'. tl200 5 before me.JQ,5a51 C�. �rl �g%ra rr o , N+-}L r V L i Date Name and Title of Officer(e.g.,"Jane Do6,Notary Public") personally appeared Qr S0. (l 1,• S1J�1V1 Name(s)of Signer(s) personally known to me ❑ proved to me on the basis of satisfactory evidence t}w JESSICA CALF ORI NAVARRO to be the personLe) whose namefs.� is/are Commission#1354600 subscribed to the within instrument and -. Notary Public-California acknowledged to me that he/she/they executed Los Angeles County the same in his/her/their.. authorized My Comm.Expires May 2,2006 capacity(ies), and that by his/her/their signature;0 on the instrument the persor�<, or the entity upon behalf of which the personX acted, executed the instrument. WITNESS my hand and official seal. Place Notary Seal Above IfSignature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document ) and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: ) Capacity(ies) Claimed by Signer Signer's Name: ❑ Individual Top of thumb here ❑ Corporate Officer—Title(s): ) ❑ Partner—❑ Limited ❑ General ( ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 1999 National Notary Association•9350 De Soto Ave.,P.O.Box 2402•Chatsworth,CA 91313-2402•www.nationalnotary.org Prod.No.5907 Reorder:Call Toll-Free 1-800-876-6827 f CLERK'S CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF FRESNO ) CITY OF FRESNO ) On November 22,2005,before me,Erika Leyva,Deputy City Clerk,personally appeared Michael. T. Kirn, Assistant Public Works Director, known to me (or proved to me on the basis of, satisfactory evidence)to be the person(s)whose name(s)are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies),and that by his/her/their signature(s) on the instrument(s)the person(s), or the entity upon behalf of the City of Fresno of which the person(s) acted, executed the instrument. WITNESS my hand and official City Seal. REBECCA E.,,KL ISCH CITY CRKRv,�:. By Hr- iIn14�����- x , EXH I BIT "A 1 Subdivision Agreement for Parcel Map 2004-20 A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES. Water System Construction Cost Estimate $7,200 Well Construction Cost Estimate $0 Sewer System Construction Cost Estimate $1,500 Street&Storm Drain Construction Cost Estimate $22,100 Final Cost Estimate (for Inspection Fee purposes) �� .$30,800 10 Landmarks,Monuments, Lot& Block Corners ($50/ea) $500 Sub-Total (for bonding purposes) $31,300 Construction.Contingency(10%) $3;130 TOTAL COST ESTIMATE* (for improvement securities purposes) $34,430 $34,000 'All amounts rounded to nearest$1000 B. .IMPROVEMENT SECURITY REQUIREMENTS(due with subdivision agreement) Performance Security "(100%of Total Cost Estimate) 95%.of amount shall be in the form of a bond by duly authorized corporate sureties or irrevocable letter of. credit $32,300 - 5%of amount shall be in cash or a Certificate of Deposit $1,700 Payment Security (50%of Total Cost Estimate) 100%of amount shall be in the form of a bond by duly authorized corporate sureties or irrevocable letter of credit $17,000 Faithful Peformance Security to Guarantee.Completion of Plans Street Plans $0 Utility Plans (Sewer.Water, Storm Water) $0 Street Light Plans $0 Landscaping/lrrigation/Walls $0 100%of amount shall be in cash or a Certificate of Deposit $0 C. WARRANTY SECURITY REQUIREMENT*(due as condition of acceptance of the work) 5%of first$50,000 of the Total Cost Estimate $2,000 3%of next$50,000 $0 . 1%of next$400,000 $0 0.5%of amount over$500,000 $0 Minimum amount . $2,000 EXHIBIT A Prepared By:Jeff Beck Date:6-6-05 Page 1 of 1 F EXH I BIT "A.2" ENGINEEWS ESTIMATE PARCEL MAP 2004-20 Y May 23, 2005 Deferred Construction Estimate Street Construction 1 Concrete Sidewalk 2,600 SF @ 1.75 / SF $ 4,550.00 .2 Concrete Return and Ramp 2 EA @ 500.00 / EA $ 1,000.00 3 Concrete Valley Gutter 1 EA @ 2,200.00 / EA $ 2,200.00 4 Street Lights 2 EA @ 2,000.00 / EA $ 4,000.00 STREET CONSTRUCTION SUBTOTAL $ 11,750.00 Utility Construction 1 6" Sewer housebranch 1 EA @ 1,500.00 / EA. $ 1,500.00 2 6" Fire Service 1 EA @ 1,500.00 / EA $ 1,500.00 3 2"Water Service 1 EA @ 1,100.00 / EA $ 1,100.00 4 2"Landscape Service 1 EA, @ 1,100.00 ./ EA $ 1,100.00 UTILITY CONSTRUCTION SUBTOTAL $ 5,200.00 DEFERRED CONSTRUCTION TOTAL $ . 16,950.00 otOFESS/ok a}*�NEZb Cqf��<<nyc v m Ne.0 47332 Exp.32/31/oS Cg 1F MWG/flk 03190enoest_xls EXHIBIT B Parcel Map Agreement No. 2004=20 f NET AMOUNT AMOUNT EXTENSION DUE DEFERRED A. MISCELLANEOUS FEES&CHARGES 1. STREET TREES Commercial(5-gallon)Street Trees @ $30.00 per Tree na na (Al) (Al) Street Tree inspection fees will be payable at the time of development of each parcel unless otherwise determined by Public Works. 2. STREET RIGHTS.OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(0(6 Lum Sum Charge as established by Public Works Director na nal 3. IRRIGATION PIPELINE(one-time maintenance fee) Lineal Feet @ $5.00 per LF na na 4. MONUMENT CHECK FEE 1 Lot&Outlots @ $30.00 per Lot Ina (Min$200) B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED 1.9314 Gross Acres 1.6029 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets 9 LUE(non-residential) C-1/BA-20 Zoning u m Input"ugm"if within the Urban Growth Management Area or"no" 1. LOCAL DRAINAGE FEES FMFCD Drainage Area 0.0000 Acres per FMFCD @ $0 per Acre na FMFCD Drainage Area 0.0000 Acres per FMFCD @ $0 per Acre na Local Drainage Fee $0.00 $0.00 (B1) (61)All or portion of fee obligation satisfied pursuant to FMFCD agreement. 2. SEWER CONNECTION CHARGES Sewer connection charges to be paid at time of development. No Sewer Connection Charges due. (b)Trunk Sewer Charge Cornelia Trunk Sewer Service Area Upon occupancy of the project,the subdivider shall pay the appropriate d. sewer facility charge pursuant to the Simple Tiered Equity Program(STEP) as determined by the Department of Public Utilities,Wastewater Division, Environmental Services Section(559-621-5153) (c)Wastewater Facilities Charge Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program(STEP) as determined by the Department of Public Utilities,Wastewater Division, Environmental Services Section(559-621-5153) 3. WATER CONNECTION CHARGES Additional services and meters due @ Building Permit,all other Water Connection Charges to be paid at time of development. No Water Connection Charges Due. 4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS Urban Growth Management Fees(UGM)to be paid at time of development. No UGM fees due. EXHIBIT B Parcel Map Agreement No. 2004720 NET AMOUNT AMOUNT EXTENSION DUE DEFERRED 5. NON-URBAN GROWTH MANAGEMENT(UGM)IMPACT FEES&CONSTRUCTION CREDITS (a)TRAFFIC SIGNAL CHARGE 0.0000 Sq.Ft.of building space(non-residential) @ $0.00 per Sq.Ft. $0.00 (134) Less Estimated Traffic Signal Charge Construction Credits Traffic Signal Charge IF $0.001— (134) 0 "'(B4) To be paid at time of development Total Impact Fees&Charges $0.00 $0.00 $0.00 Note: EXTENSION total includes net results of construction credits SUMMARY TOTAL(A) MISCELLANEOUS FEES&CHARGES TOTAL(B) IMPACT FEES&CHARGES $0.00 TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash $0.00