HomeMy WebLinkAboutPM 2002-13 - Agreement/Covenant - 8/11/2006 When Recorded Mail To:
City Clerk 0913012002,20020170714
City of Fresno
2600 Fresno Street
Fresno, CA 93721-3603
NO FEE-GOVERNMENT CODE 6103
CITY of FRESNO
Public Works Department
P.W. File No. 5494-0213
PARCEL MAP AGREEMENT No. 2002-13
r�
THIS AGREEMENT is made this .3 day of �� •��cr` ,2002, by and
between the City of Fresno, a Municipal Corporation, hereinafter referred to as"City,"and,
The Zone Sports Center, L.L.C., a California Limited Liability Company, hereinafter
referred to as "Subdivider" without regard for number or Gender.
RECITALS
A. The Subdivider has filed with the City, a Parcel Map which proposes the
subdivision of land owned by Subdivider, situated in the City of Fresno, County of Fresno,
State of California, dividing the real property more particularly described as follows:
Parcels A through J, inclusive, of Parcel Map No. 2002-13 as recorded in
Book - 10 2— of Parcel Maps at Page(s) L , Fresno County
Records.
T
Parcel Map Agreement No. 2002-13
Page 2
B. The City requires, as a condition precedent to the acceptance and approval of
said Parcel Map, the dedication of streets, highways, public places and easements as are
delineated on the Parcel Map, and deems such dedications as necessary for the public
use; and, requires the construction of improvements of the streets delineated on the
Parcel Map.
C. Section 12-1206 of the Fresno Municipal Code requires the Subdivider to either
construct or enter into an Agreement whereby Subdivider agrees to perform and complete
the work and improvements required as Conditions of Approval for Tentative Parcel
Map No. 2002-13 dated June 11, 2002 issued by the City and any amendments thereto
(hereinafter referred to as Conditions of Approval and incorporated into this agreement by
this reference), in consideration of the approval of the Parcel Map for recording.
AGREEMENT
In consideration of the approval of said Parcel Map for filing and recording as
provided and required by law, it is mutually agreed and understood by and between the
Subdivider and City, and the Subdivider and City do hereby mutually agree as follows:
1. The Subdivider shall perform the work and improvements at the time a permit
or other grant of approval for development of the parcel is issued by the City or before
June 11, 2004, whichever occurs first, unless prior to this date of performance an
extension of time is approved by the Public Works Director.
Parcel Map Agreement No. 2002-13
Page 3
2. Prior to the commencement of the work, the Subdivider shall submit
engineered construction plans to the City Engineer for review and approval. The cost to
prepare and process such plans, and the inspection of such work, shall be the
responsibility of the Subdivider. The work shall be performed and inspected under a
Street Work Permit issued by the Public Works Department pursuant to such approved
construction plans,.
3. All of the work and improvements and materials shall be performed, installed,
and provided in accordance with the City of Fresno Standard Specifications, adopted
September 11, 1984 by Resolution No. 84-361 and any amendments thereto, hereinafter
referred to as the "Standard Specifications," which are incorporated herein as though set
forth in full. All of said work and improvements shall also comply with the requirements of
Chapter 12, Articles 10 and 12 of the Fresno Municipal Code. In situations where there
are no Standard Specifications for an item of work, it is agreed that such work shall be
performed in accordance with the standards and specifications of the State of California,
Department of7ransportation as determined by the City Engineer.
4. The work and improvements are stipulated in the Conditions of Approval and
include the following:
a. All utility systems shall be installed underground. Subdivider's
attention is directed to the installation of street lights in accordance with Resolution
No. 68-187 and Resolution No. 78-522. The Subdivider shall construct a complete
underground street light system as approved by the Traffic Engineer prior to final
acceptance of the parcel map. Height, type, spacing, etc., of standards and
luminaries shall be in accordance with Resolution No. 78-522 and shall be
approved by the City Engineer.
Parcel Map Agreement No. 2002-13
Page 4
b. Water main extensions and services shall be provided in accordance
with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code
and all applicable charges shall apply.
C. Sanitary sewer extensions and services shall be provided in
accordance with applicable provisions of Chapter 9, Article 5 of the Fresno
Municipal Code and all applicable charges shall apply.
d. Lot drainage shall be in accordance with Section 13-120.3315 of the
Fresno Municipal Code.
e. The improvements are more particularly itemized in Exhibit A,
attached hereto and made a part of this Agreement.
5. Prior to the approval of the Parcel Map by the City, the Subdivider shall
furnish to the City the following securities in the amounts itemized in said Exhibit A.
Bonds shall be by one or more duly authorized corporate sureties subject to the approval
of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal 100% of the
Final Cost Estimate to be conditioned upon the faithful performance of this
agreement.
i. 95% of the Final Cost Estimate shall be in the form of a bond
or irrevocable instrument of credit; and
ii. 5% of the Final Cost Estimate shall be in cash or a certificate
of deposit.
b. PAYMENT SECURITY. Total amount to equal 50%of the Final Cost
Estimate to secure payment to all contractors and subcontractors performing work
on said improvements and all persons furnishing labor, materials, or equipment to
them for said improvements. Payment Security shall be in the form of a bond or
irrevocable instrument of credit.
Parcel Map Agreement No. 2002-13
Page 5
6. Prior to the approval of the Parcel Map by the City, the Subdivider shall pay
to the City and/or execute a covenant to defer certain impact fees due which are eligible
to be deferred by relevant FMC provisions, the total fees and charges due as a condition
of Parcel Map approval. The total fees and charges are more particularly itemized in
Exhibit B, attached hereto and made a part of this Agreement.
7. Upon acceptance of the required work by the City Engineer, a warranty
security shall be furnished to or retained by City in the minimum amount identified in said
Exhibit A, for guarantee and warranty of the work for a period of one (1) year following
acceptance against any defective work or labor done or defective materials furnished. In
accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security
shall be in the form of cash or a certificate of deposit. The warranty security shall be
returned to the Subdivider, less any amount required to be used for fulfillment of the
warranty one (1) year after final acceptance of the subdivision improvement.
8. The Subdivider and his contractor and subcontractors shall pay for any
materials, provisions, provender, and other supplies or terms used in, upon, for, or about
the performance of the work contracted to be done and for any work or labor thereon of
any kind and for amounts due under the Unemployment Insurance Act of the State of
California with respect to such work or labor and shall file with City pursuant to Section
3800 of the Labor Code a Certificate of Workers Compensation and shall maintain a valid
policy of Workers Compensation Insurance for the duration of the period of construction.
Parcel Map Agreement No. 2002-13
Page 6
9. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever,for any injury or damage that may result to any person or property
by or from any cause whatsoever in, on or about the subdivision of said land covered by
this Agreement, or any part thereof. The Subdivider hereby releases and agrees to
indemnify, defend and save the City harmless from and against any and all personal
injuries to and deaths of persons and property damage, and all claims demands, costs,
loss, damage, and liability, howsoever same may be caused, resulting directly or indirectly
from the performance of any or all work and improvements to be done in and upon the
street rights-of-way in the subdivision or upon the premises adjacent thereto pursuant to
this Agreement, and also from all injuries to and deaths of persons, and all claims,
demands, costs, liability, loss, damage, howsoever caused, either directly or indirectly
made or suffered by the Subdivider, or his agents, employees and subcontractors, in
connection with the work and improvements required by this Agreement. The Subdivider
further agrees that the use for any purpose and by any person of any of the streets, work
or improvements specified in or required by this Agreement or the Parcel Map, shall be at
the sole and exclusive risk of the Subdivider at all times prior to the final acceptance of the
work and improvements by the City.
10. Initial compaction and soil tests of street, sewer, and other work within the
public right-of-way shall be ordered by and paid for by City. Sewer and utility trench tests
shall be taken in varying locations and depths as required by the City Engineer.
Compaction tests failing to meet City's requirements shall be recorded by City from the
same testing laboratory. Billing for the required retests shall be made directly to the
Subdivider or his agent for payment. Compaction test for water facilities installed by City
shall be paid for by City.
Parcel Map Agreement No. 2002-13
Page 7
11. Subdivider shall comply with the provisions of the prevailing Building,
Plumbing, Mechanical, Electrical and Zoning Codes and any other Codes of the City.
12. It shall be the responsibility of the Subdivider to coordinate all work done by
his contractors and subcontractors, such as scheduling the sequence of operations and
the determination of liability if one operation delays another. In no case shall
representatives of the City be placed in the position of making decisions that are the
responsibility of the Subdivider. It shall'further be the responsibility of the Subdivider to
give the City Engineer written notice not less than two (2)working days in advance of the
actual date on which work is to be started. Failure on the part of the Subdivider to notify
the City Engineer may cause delay for which the Subdivider shall be solely responsible.
13. Whenever the Subdivider varies the period during which work is carried on
each day, he shall give due notice to the City Engineer so that proper inspection may be
provided. Any work done in the absence of the City Engineer will be subject to rejection.
The inspection of the-work shall not relieve the Subdivider of any of his obligations to fulfill
the Agreement as prescribed. Defective work shall be made good and unsuitable
materials may be rejected, notwithstanding the fact that such defective work and unsuitable
materials have been previously overlooked by the City Engineer and accepted.
14. Any damage to the sewer system, concrete work, or street paving that occurs
after installation shall be made good to the satisfaction of the City Engineer by the
Subdivider before bonds are released or final acceptance of the work and improvements.
Parcel Map Agreement No. 2002-13
.Page-8 .
15. Adequate dust control shall be maintained by the Subdivider on all streets
within and without the subdivision on which work is required to be done under this
Agreement from the time work is first commenced until the paving of the streets are
completed. "Adequate dust control" as used herein shall mean the sprinkling of the
streets with water or the laying of a dust coat of oil thereon with sufficient frequency to
prevent the scattering of dust by wind or the activity of vehicles and equipment onto any
street area or private property adjacent to the subdivision. Whenever in the opinion of the
City Engineer adequate dust control is not being maintained on any street or streets as
required by this paragraph, the City Engineer shall give notice to the Subdivider to comply
with the provisions of this paragraph forthwith. Such notice may be personally served
upon the Subdivider or, if the Subdivider is not an individual, upon any person who has
signed this agreement on behalf of the Subdivider or, at the election of the City Engineer,
such notice may be mailed to the Subdivider at his address on file with the City Engineer.
If within 24 hours after such personal service of such notice or within 48 hours after the
mailing thereof as herein provided, the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control,
the City Engineer may, without further notice of any kind, cause any such street or streets
to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by
equipment and personnel of City or by contract as the City Engineer shall determine, and
the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire
cost to City of such sprinkling or oiling. When the surfacing on any existing street is
disturbed, this surfacing shall be replaced with temporary or permanent surfacing within
14 calendar days, and the roadway shall be maintained in a safe and passable condition
at all times between the commencement and final completion,-and adequate dust control
shall be maintained during these operations.
Parcel Map Agreement No. 2002-13
Page 9
16. The Subdivider shall install all street* improvements in accordance with
Section 12-1206 of the Municipal Code of the City of Fresno, the City of Fresno Standard
Specifications, and the approved construction plans.
17. Concrete curbs and gutters, the sanitary sewer system and house
connections, together with water mains, gas mains, and their respective service
connections, shall be completed in the streets and alleys before starting the street and
alley surfacing.
18. Time is of the essence of this Agreement. The provisions contained in this
Agreement are intended by the parties to run with the land, and the same shall bind and
inure to the benefit of the parties hereto, their heirs, successors in interest, and assigns.
19. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent
of the City.
Parcel Map Agreement No. 2002-13
Page 10
The parties have executed this Agreement on the day and year first above written.
CITY OF FRESNO, SUBDIVIDER
a Municipal Corporation
The Zone Sports Center, L.L.C.,
a California Limited Liability Company
PUBLIC WORKS DEPARTMENT
0 %ID %A)
By: WNJL- By:10
414- INTERIM DIRECTOR Milton Barbis
Mark I. Williamson
APPROVED AS TO FORM: (Attach Notary Acknowledgments)
HILDA CANTO MONTOY
City Attorne
By
Deputy
City of Fresno Mailing Address: Subdivider's Mailing Address:
Public Works Director The Zone Sports Center
Public Works Department 2037 W. Bullard Avenue, Ste. 186
2600 Fresno Street. Fresno, CA 93711
Fresno, CA 93721-3615
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California
ss.
County of r
r
On , before me, •�? ,�i�ilp-.�'D
Date Name and Title of Off re. r<
( g.,"Jane Oce,Notary Public")
personally appeared (! lsr
Name(s)of Signer(s)
❑ personally known to me
( proved to me on the basis of satisfactory
evidence
to be the person whose named&are s
. subscribed to the within instrument and
acknowledged to me thahe she/they executed
KELLENEPEIRSOL the samein hi /her/their authorized
Commission#1299capacity), an that by her/their
Notary Public-Catiioml� signature(K on the instrument the person(4, or
San Mateo Courrir Irthe entity upon behalf of which the erson s
My Comm.E)ires Apr 1,2005 Y P P
acted, executed the instrument.
WITNESS my handl dand official seal.
Place Notary Seal Above Si nature of Notary Public
OPTIONAL
Though the information below is not required by law,it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Do en 7
Title or Type of Document: no-
Document Date: Number of Pages:
Signer(s)Other Than Named Above:
Capacity(ies) Claimed by Signer
Signer's Name: lye yl
❑ IndividualTop of thumb here
M .
Corporate Officer—Title(s):
❑ Partner—❑ Limited ❑ General
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing: Ju lytJ► ) � � i�
0 1999 National Notary Assoelalian•9350 be Soto Ave..P.O.Box 2402•Chatsworth.CA 91313-2402•www.rLatiominotary.org Prod.No.5907 Reorder Call-Toll-Free 1-600-676-6627
CLERK'S CERTIFICATION
STA TE OF CALIFORNIA )
COUNTY OF FRESNO )
CITY OF FRESNO )
On September 19,2002 , before me, Elvia Sommerville, Deputy City Clerk, personally
appeared,Mark I. Williamson,Asst. Public Works Director, known to me (or proved to me on
the basis of satisfactory evidence) to be the person(s)whose name(s) are subscribed to the within
instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s)on the instrument(s) the person(s),
or the entity upon behalf of the City of Fresno of which the person(s) acted, executed the
instrument.
WI7'NE55 my hand and official City Seal.
REBECCA E. KL15CH
City Clerk.
0
By
Deputy
Harbison International Inc. DATE0200
1
Engineers - Surveyors - Planners
HARBISON INTERNATIONAL INC .
PRELIMINARY COST ESTIMATE
for
PARCEL MAP 2002-13 , THE ZONE SPORT CENTER
FRESNO, CA.
ITEM DESCRIPTION QUANTITY UNIT EXTENSION
NC . PRICE
---- ------------------------------------------------------------- - - -- -- -
OFF- SITE WORK CEDAR AVE .
1 . STREET LIGHTS 8 EA. $2 , 400 . 00 $19 , 200
TCTAL CEDAR AVE . $19 , 200
---- --------------------------------------------------------------------
OFF-SITE WORK DAKOTA AVE .
1 . CLEARING & GRUBBING LUMP SUM $500
2 . STREET SAW CUT 620 L/F $3 . 00 $1, 860
3 . ROAD EXCAVATION & REMOVAL 100 CY $7 . 00 $700
4 . SUB BASE PREP. 115 CY $13 . 00 $1, 495
5 . AG. BASE 140 TON $19 . 50 $2 , 730
6 . ASPHALT 60 TON $50 . 00 $3 , 000
7 . FOG SEAL 3100 SF $0 . 04 $124
8 . CURB & GUTTER 615 LF $19 . 50 $11, 993
9 . S`!'RRET LIGHTS 4 EA. $2, 400 .00 $9 , 600
10 . STREET TREES 6 EA $525 . 00 $3 , 150
11 . SIDEWALK 2768 SF $3 . 50 $9 , 688
TCTI.L DAKOTA AVE . $44 , 840
---- --------------------------------------------------------------------
OFF-SITE WORK BARTON AVE.
1 . CLEARING & GRUBBING LUMP SUM $500
2 . STREET SAW CUT 1941 L/F $3 . 00 $5, 823
3 . ROAD EXCAVATION & REMOVAL 360 CY $7 . 00 $2, 520
4 . SUB BASE PREP. 1300 CY $13 . 00 $16, 900
5 . AG. BASE 1560 TON $19 . 00 $29, 640
6 . ASPHALT 840 TON $50 . 00 $42, 000
7 . CURB & GUTTER 1941 LF $19 . 50 $37, 850
8 . STREET TREES 15 EA $525 . 00 $7, 875
9 . STRRET LIGHTS 10 EA. $2 , 400 . 00 $24, 000
10 . H.C. RAMP 2 EA. $850 . 00 $1, 700
11 . FOG SEAL 34900 SF $0 . 04 $1, 396
TCTAL BARTON AVE . $170, 204`
PAGE 1 of 4
2755 E. Shaw Ave., Suite 101 - Fresno, CA 937 10, USA
Tel: 559-294-7485 - Fax: 559-294-7481
E,mail: hamzy®lightspeed.net
Website: www.hamzy.com
1 Harbison International Inc. DATE 08/27/2002
Engineers - Surveyors - Planners
OFF-SITE WORK HAMPTON WAY
1 . MOBLIZATION LUMP SUM $500
2 . STREET SAW CUT 635 L/F $3 . 00 $1, 905
3 . ROAD EXCAVATION & REMOVAL 70 CY $7 . 00 $490
4 . SUB BASE PREP. 500 CY $13 . 00 $6, 500
5 . AG. BASE 600 TON $19 . 50 $11, 700
6 . ASPHALT 250 TON . $50 . 00 $12, 500
7 . CURB & GUTTER 635 LF $19 .50 $12, 383
8 . STREET TREES 10 LF $525 . 00 $5, 250
9 . STRRET LIGHTS 4 EA. $2,400. 00 $9, 600
10 . VALLEY GUTTER 280 SF $4 . 00 $1, 120
11 . H.C. P.AMP 1 EA. $850 . 00 $850
12 . FOG SEAL 34900 SF $0 . 04 $1, 396
TC TI.L BARTON AVE . $64, 194:
---- ------------------------------------------------------------------- -
TCT1.L COST $298,437
---- -------------- ------------------------------------------------------
THE ABOVE COST ESTIMATE IS BASED ON PREVAILING WAGES
FCR STANDARD WAGES REDUCE ABOVE ESTIMATE BY $ 40, 000 . 00
PAGE 2 of 4
2755 E. Shaw Ave., Suite 101 - Fresno, CA 93710, USA
Tel: 559-294-7485 - Fax: 55'9-294-7481
E-mail: hamzy@lightspeed.net
Website: www.hamzy.com .
EXHIBIT A Parcel Map Agreement for Parcel Map 2002 - 13
A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $0
Well Construction Cost Estimate $0
Sewer System Construction Cost Estimate $0
Street Construction Cost Estimate Cedar Avenue $19,200
Street Construction.Cost Estimate Dakota Avenue $44,840
Street Construction Cost Estimate Hampton Way $64,194
Final Cost Estimate(for Inspection Fee purposes) $128,234
53 Landmarks, Monuments, Lot& Block Comers($50/ea) $2,650
Sub-Total (for bonding purposes) $130,884
Construction Contingency(10%) $13,088
TOTAL COST ESTIMATE'
(for Improvement securities purposes) $143,972 $144,000
*All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS(due with parcel map agreement)
Performance Security (100%of Total Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $136,800
5%of amount shall be in cash or a Certificate of Deposit $7,200
Payment Security (50%of Total Cost Estimate)
100%of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $72,000
C. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES FOR DEED OF TRUST
Street Construction Cost Estimate Barton Avenue $170,204
Final Cost Estimate(for Inspection Fee purposes) $170,204
TOTAL COST ESTIMATE
(for Improvement securities purposes) $170,204 $170,200
Payment Security (50% of Total Cost Estimate)
100%of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
$85,100
credit
D. DEED OF TRUST
150%of amount shall be in the form of a real property
lien in the form of a deed of trust $255,300 $255,300
Page 3 of 4
EXHIBIT A v4/28/00 Prepared By: Rick Date: 08/26/02 Print Date:08/26/02 4:35:24 PM
EXHIBIT A Parcel Map Agreement for Parcel Map 2002 - 13
Faithful Performance Security to Guarantee Completion of Plans
Street Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street Light Plans $0
Landscaping/In igation/Walls $0
100%of amount shall be in cash or a Certificate of Deposit 1 $0
E. WARRANTY SECURITY REQUIREMENT'(due as condition of acceptance of the work)
5%of first$50,000 of the Total Cost Estimate $3,000
3%of next$50,000 $2,000
1%of next$400,000 $0
0.5%of amount over$500,000 $0
Minimum amount $5,000
Page 4 of 4
EXHIBIT A v4/28/00 Prepared By: Rick Date: 08/26/02 Print Date:08/26/02 4:35:24 PM
EXHIBIT B Parcel Map Agreement No. 2002-13
NET AMOUNT
DUE @ BUILDING
EXTENSION PERMIT
A. MISCELLANEOUS FEES&CHARGES
1. STREET TREES
OCommercial(15-gallon)Street Trees @ $129.00 per Tree na na (A1)
(A1) Street Tree fees will be payable at the time of development of each
parcel unless otherwise determined by the Park Division.
2. STREET RIGHTS OF WAY ACQUISITIONICONSTRUCTION CHARGE per FMC 11-226(f)(6
Lum Sum Charge as established by Public Works Director na nal
3. IRRIGATION PIPELINE(one-time maintenance fee)
OLineal Feet @ $5.00 per LF na na
B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED
45.3615 Gross Acres
0.0000 Net Acres
44.7662 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
0 Units(residential)
0 LUE(non-residential)
C-R Zoning
NO Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES
JJ FMFCD Drainage Area
0.0000 Acres per FMFCD @ $0 per Acre $1 455.00
Local Drainage Fee 1 $1,455.00 $0.00 (B1)
(B1)Drainage fee assessed at higher zone rate; refund due. Amount to be determaned at time of development per FMFCD.
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
Frontage: Cedar 105,500 SF
Frontage: I Dakota 56,000 SF
Frontage: I Barton 184,000 SF
Frontage: lHampton 69,600 SF
Total Square Feet 40 10 SF
405 100 SF; sub-total Latera/Sewer Charge @ $0.10 per SF $40 510.00
Less estimated Lateral Sewer Charge Credits
Lateral Sewer Charge $40,510.001 $40 510.00
(b)Oversize Sewer Charge
Frontage: Cedar 105,500 SF
Frontage: Dakota 56,000 SF
Frontage: Barton 184,000 SF
Frontage: Hampton 59,600 SF
Total Square Feet 405 10 SF
405 100 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $20 255.00
Less estimated Oversize Credits $0.00
Less estimated Overdepth Credits
Oversize Sewer Charge $20,255.001 $20,255.00
(c)Trunk Sewer Charge
0 Units @ per Unit Ina
FORM PM Agreement EXHIBIT B v3r" By. Rids Date: Revised 10/01/02 Printed 0121/03 8:55:47 AM Pape 1 of 2
EXHIBIT B Parcel Map Agreement No. 2002-13
NET AMOUNT
DUE @ BUILDING
EXTENSION PERMIT
(d)Wastewater Facilities Charge
S.T.E.P.
(e) Sewer Ca achy Enhancement Charge
Units @ $0.00 per Unit na nal
3. WATER CONNECTION CHARGES
(a)Time&Material Charges("Wet-Tie")
Due for each parcel @ building permit
(b1)Service Connection Charges
Due for each parcel @ building permit
(c)Frontage C arge
Frontage: Cedar 1,055 LF
Frontage: Dakota 535
Frontage: Barton 1,790 LF
Frontage: Ham to
571 LF
Sub-Total Lineal Feet(full rate) 1 3,951 ILF
3 951 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $25 681.50
Sub-Total Frontage Charge $25 681.50
Less estimated Frontage Charge Credits
Frontage Charge $25,681.50 r $25 681.50
(d)Fire Hydrant Charge
937 750 SF;non-residential zoning @ $1.25 per 100 SF 1 721.88 $11,721.881
(e)Transmission Grid Main Charge
45.3615 1 Gross Acres @ $560.00 per Gr Acre $25 402.44
Less EstimatedTGM Construction Credits
Transmission Grid Main Charge 2 402.44 $25,402.441
( Transmission Grid Main Bond Debt Service Charge
45.3615 Gross Acres @ $243.00 per Gr Acre $11 022.84
Less EstimatedTGM Bond Debt Service Charge Credits
Transmission Grid Main Bond Debt Service Charge 1 $1 i,o22.84 $11,022.841
4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
NON UGM
Total Impact Fees&Charges $136,048.66 $134,59
SUMMARY
TOTAL(A) MISCELLANEOUS FEES&CHARGES
TOTAL(B) IMPACT FEES&CHARGES $134,593.661
TOTAL FEES and CHARGES DUE WITH PARCEL MAP AGREEMENT cash $0.00
FORM PM Agreement EXHIBIT 8 N3GW By. Rids Dale: Revised I(V01102 Printed 01/21/03 8:55:47 AM Page 2 of 2
Rick Sommerville-Water and Sewer Fees PaLe 1
From: "Milton Barbis" <MBarbis@attbi.com>
To: <andy.souza@ci.fresno.ca.us>
Date: 12/27/02 11:54AM
Subject: Water and Sewer Fees
Andy,
I hope you are enjoying the holidays!
just received a estimated water and sewer connection fee for phase 1,the fields. It was very disturbing to
see that the fees were for$72,000. This for two bathrooms that cost$30,000 for building... total. I thought
that we discussed having fees reflect that this is a park and we were going to get some fee relief for usage
and connectionfees?We need to get this clarified as quickly as possible.
Thanks, Milt
CC: 'Vikkie Calderon" <Vikkie.Calderon@ci.fresno.ca.us>, "Tim McDonald"
<Def46@aol.com>, "Jack Messina" <JMessina@Tingey.com>, <mattyusc8@aol.com>