PARCEL MAP AGREEMENT No. 2000 - 12
THIS AGREEMENT is made this- L(:; ' day of_ jaec c 6.o,- , 2001, by and
between the City of Fresno, a Municipal Corporation, hereinafter referred to as "City,"
and, Clinton-Fowler Industrial Park, LLC, a California Limited Liability Company, 340
West Cromwell Avenue, Suite 101, Fresno, California, 93711,hereinafter referred to as
"Subdivider" without regard for number or Gender.
RECITALS
A. The Subdivider has filed with the City, a Parcel Map which proposes the
subdivision of land owned by Subdivider, situated in the City of Fresno, County of Fresno,
State of California, dividing the real property more particularly described as follows:
Parcels A through HHH, inclusive, of Parcel Map No. 2000 - 12 as recorded
in Book of Parcel Maps at Page(s) , Fresno County
Records.
Parcel Map Agreement No. 2000 - 12
Page 2
B. The City requires, as a condition precedent to the acceptance and approval of
said Parcel Map, the dedication of streets, highways, public places and easements as are
delineated on the Parcel Map, and deems such dedications as necessary for the public
use; and, requires the construction of improvements of the streets delineated on the
Parcel Map.
C. Section 12-1206 of the Fresno Municipal Code requires the Subdivider to either
construct or enter into an Agreement whereby Subdivider agrees to perform and complete
the work and improvements required as Conditions of Approval for Tentative Parcel
Map No. 2000- 12 dated October 4, 2000 issued by the City and any amendments thereto
(hereinafter referred to as Conditions of Approval and incorporated into this agreement by
this reference), in consideration of the approval of the Parcel Map for recording.
AGREEMENT
In consideration of the approval of said Parcel Map for filing and recording as
provided and required by law, it is mutually agreed and understood by and between the
Subdivider and City, and the Subdivider and City do hereby mutually agree as follows:
1. The Subdivider shall perform the work and improvements at the time a permit
or other grant of approval for development of the parcel is issued by the City or before
November 30, 2002, whichever occurs first, unless prior to this date of performance an
extension of time is approved by the Public Works Director.
2. Prior to the commencement of the work, the Subdivider shall submit
engineered construction plans to the City Engineer for review and approval. The cost to
• r
Parcel Map Agreement No. 2000 - 12
Page 3
prepare and process such plans, and the inspection of such work, shall be the
responsibility of the Subdivider. The work shall be performed and inspected under a
Street Work Permit issued by the Public Works Department pursuant to such approved
construction plans,.
3. All of the work and improvements and materials shall be performed, installed,
and provided in accordance with the City of Fresno Standard Specifications, adopted
September 11, 1984 by Resolution No. 84-361 and any amendments thereto, hereinafter
referred to as the "Standard Specifications,"which are incorporated herein as though set
forth in full. All of said work and improvements shall also comply with the requirements of
Chapter 12, Articles 10 and 12 of the Fresno Municipal Code. In situations where there
are no Standard Specifications for an item of work, it is agreed that such work shall be
performed in accordance with the standards and specifications of the State of California,
Department of Transportation as determined by the City Engineer.
4. The work and improvements are stipulated in the Conditions of Approval and
include the following:
a. All utility systems shall be installed underground. Subdivider's
attention is directed to the installation of street lights in accordance with Resolution
No. 68-187 and Resolution No. 78-522. The Subdivider shall construct a complete
underground street light system as approved by the Traffic Engineer prior to final
acceptance of the parcel map. Height, type, spacing, etc., of standards and
luminaries shall be in accordance with Resolution No. 78-522 and shall be
approved by the City Engineer.
b. Water main extensions and services shall be provided in accordance
with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code
and all applicable charges shall apply.
Parcel Map Agreement No. 2000 - 12
Page 4
C. Sanitary sewer extensions and services shall be provided in
accordance with applicable provisions of Chapter 9, Article 5 of the Fresno
Municipal Code and all applicable charges shall apply.
d. Lot drainage shall be in accordance with Section 13-120.3315 of the
Fresno Municipal Code.
e. The improvements are more particularly itemized in Exhibit A,
attached hereto and made a part of this Agreement.
5. Prior to the approval of the Parcel Map by the City, the Subdivider shall
furnish to the City the following securities in the amounts itemized in said Exhibit A.
Bonds shall be by one or more duly authorized corporate sureties subject to the approval
of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal 100% of the
Final Cost Estimate to be conditioned upon the faithful performance of this
agreement.
i. 95% of the Final Cost Estimate shall be in the form of a bond
or irrevocable instrument of credit; and
ii. 5% of the Final Cost Estimate shall be in cash or a certificate
of deposit.
b. PAYMENT SECURITY. Total amount to equal 50% of the Final Cost
Estimate to secure payment to all contractors and subcontractors performing work
on said improvements and all persons furnishing labor, materials, or equipment to
them for said improvements. Payment Security shall be in the form of a bond or
irrevocable instrument of credit.
6. Prior to the approval of the Parcel Map by the City, the Subdivider shall pay
to the City and/or execute a covenant to defer certain impact fees due which are eligible
to be deferred by relevant FMC provisions, the total fees and charges due as a condition
of Parcel Map approval. The Subdivider shall pay sewer and water connection charges
required to be paid as a condition of approval of the Tentative Parcel Map. Such fees shall
Parcel Map Agreement No. 2000 - 12
Page 5
be due and payable at the time of development of each parcel, excepting those certain
impact fees due with this agreement. The total fees and charges are more particularly
itemized in Exhibit B, attached hereto and made a part of this Agreement.
7. Subdivider has paid to the City of Fresno, in accordance with Article 13,
Chapter 13 of the Fresno Municipal Code, the required fee to defray the costs of
constructing planned local drainage facilities for the removal of surface and storm waters
from the subdivision.
8. Upon acceptance of the required work by the City Engineer, a warranty
security shall be furnished to or retained by City in the minimum amount identified in said
Exhibit A, for guarantee and warranty of the work for a period of one (1) year following
acceptance against any defective work or labor done or defective materials furnished. In
accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security
shall be in the form of cash or a certificate of deposit. The warranty security shall be
returned to the Subdivider, less any amount required to be used for fulfillment of the
warranty one (1) year after final acceptance of the subdivision improvement.
9. The Subdivider and his contractor and subcontractors shall pay for any
materials, provisions, provender, and other supplies or terms used in, upon, for, or about
the performance of the work contracted to be done and for any work or labor thereon of
any kind and for amounts due under the Unemployment Insurance Act of the State of
California with respect to such work or labor and shall file with City pursuant to Section
3800 of the Labor Code a Certificate of Workers Compensation and shall maintain a valid
policy of Workers Compensation Insurance for the duration of the period of construction.
Parcel Map Agreement No. 2000 - 12
Page 6
10. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever, for any injury or damage that may result to any person or property
by or from any cause whatsoever in, on or about the subdivision of said land covered by
this Agreement, or any part thereof. The Subdivider hereby releases and agrees to
indemnify, defend and save the City harmless from and against any and all personal
injuries to and deaths of persons and property damage, and all claims demands, costs,
loss, damage, and liability, howsoever same may be caused, resulting directly or indirectly
from the performance of any or all work and improvements to be done in and upon the
street rights-of-way in the subdivision or upon the premises adjacent thereto pursuant to
this Agreement, and also from all injuries to and deaths of persons, and all claims,
demands, costs, liability, loss, damage, howsoever caused, either directly or indirectly
made or suffered by the Subdivider, or his agents, employees and subcontractors, in
connection with the work and improvements required by this Agreement. The Subdivider
further agrees that the use for any purpose and by any person of any of the streets, work
or improvements specified in or required by this Agreement or the Parcel Map, shall be at
the sole and exclusive risk of the Subdivider at all times prior to the final acceptance of the
work and improvements by the City.
11. Initial compaction and soil tests of street, sewer, and other work within the
public right-of-way shall be ordered by and paid for by City. Sewer and utility trench tests
shall be taken in varying locations and depths as required by the City Engineer.
Compaction tests failing to meet City's requirements shall be recorded by City from the
same testing laboratory. Billing for the required retests shall be made directly to the
Parcel Map Agreement No. 2000 - 12
Page 7
Subdivider or his agent for payment. Compaction test for water facilities installed by City
shall be paid for by City.
12. Subdivider shall comply with the provisions of the prevailing Building,
Plumbing, Mechanical, Electrical and Zoning Codes and any other Codes of the City.
13. It shall be the responsibility of the Subdivider to coordinate all work done by
his contractors and subcontractors, such as scheduling the sequence of operations and
the determination of liability if one operation delays another. In no case shall
representatives of the City be placed in the position of making decisions that are the
responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to
give the City Engineer written notice not less than two (2)working days in advance of the
actual date on which work is to be started. Failure on the part of the Subdivider to notify
the City Engineer may cause delay for which the Subdivider shall be solely responsible.
14. Whenever the Subdivider varies the period during which work is carried on
each day, he shall give due notice to the City Engineer so that proper inspection may be
provided. Any work done in the absence of the City Engineer will be subject to rejection.
The inspection of the work shall not relieve the Subdivider of any of his obligations to fulfill
the Agreement as prescribed. Defective work shall be made good and unsuitable
materials may be rejected, notwithstanding the fact that such defective work and unsuitable
materials have been previously overlooked by the City Engineer and accepted.
15. Any damage to the sewer system,concrete work,or street paving that occurs
after installation shall be made good to the satisfaction of the City Engineer by the
Subdivider before bonds are released or final acceptance of the work and improvements.
Parcel Map Agreement No. 2000 - 12
Page 8
16. Adequate dust control shall be maintained by the Subdivider on all streets
within and without the subdivision on which work is required to be done under this
Agreement from the time work is first commenced until the paving of the streets are
completed. "Adequate dust control" as used herein shall mean the sprinkling of the
streets with water or the laying of a dust coat of oil thereon with sufficient frequency to
prevent the scattering of dust by wind or the activity of vehicles and equipment onto any
street area or private property adjacent to the subdivision. Whenever in the opinion of the
City Engineer adequate dust control is not being maintained on any street or streets as
required by this paragraph, the City Engineer shall give notice to the Subdivider to comply
with the provisions of this paragraph forthwith. Such notice may be personally served
upon the Subdivider or, if the Subdivider is not an individual, upon any person who has
signed this agreement on behalf of the Subdivider or, at the election of the City Engineer,
such notice may be mailed to the Subdivider at his address on file with the City Engineer.
If within 24 hours after such personal service of such notice or within 48 hours after the
mailing thereof as herein provided, the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control,
the City Engineer may, without further notice of any kind, cause any such street or streets
to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by
equipment and personnel of City or by contract as the City Engineer shall determine, and
the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire
cost to City of such sprinkling or oiling. When the surfacing on any existing street is
Parcel Map Agreement No. 2000 - 12
Page 9
disturbed, this surfacing shall be replaced with temporary or permanent surfacing within
14 calendar days, and the roadway shall be maintained in a safe and passable condition
at all times between the commencement and final completion, and adequate dust control
shall be maintained during these operations.
17. The Subdivider shall install all street improvements in accordance with
Section 12-1206 of the Municipal Code of the City of Fresno, the City of Fresno Standard
Specifications, and the approved construction plans.
18. Concrete curbs and gutters, the sanitary sewer system and house
connections, together with water mains, gas mains, and their respective service
connections, shall be completed in the streets and alleys before starting the street and
alley surfacing.
19. Time is of the essence of this Agreement. The provisions contained in this
Agreement are intended by the parties to run with the land, and the same shall bind and
inure to the benefit of the parties hereto, their heirs, successors in interest, and assigns.
20. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent
of the City.
Parcel Map Agreement No. 2000 - 12
Page 10
The parties have executed this Agreement on the day and year first above written.
CITY OF FRESNO, SUBDIVIDER
a Municipal Corporation
CLINTON-FOWLER INDUSTRIAL PARK, LLC
a California Limited Liability Company
By
Mark I. Williamson, P.E., Director
Public Works Department By:
Donald V. Pickett, Member- Manager
APPROVED AS TO FORM:
HILDA CANTO MONTOY By:
City Attorney 11 J ryCook, Member- nager
(Attach Notary Acknowledgments)
By
Deputy
Subdivider's Mailing Address:
340 West Cromwell, Suite 101
City of Fresno Mailing Address:
Fresno, California 93711
Public Works Director
Public Works Department Revised: October 25, 2001
2600 Fresno Street.
Fresno, CA 93721-3615
STATE OF _CALIFORNIA )
SS.
COUNTYOF Fresno )
On *- 11/21/01 before me, Michael DeYoung
a Notary Public in and for said County and State, personally appeared Donald V. Pickett,
Jerry E . Cook
personally known to me (or proved to me on the basis of satisfactory evidence)to be the person(s)whose name(s)
Is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s)acted, executed the instrument.
WITNESS my hand and official seal.
Michael Scott De Young
Comm.#1322485
Signature of Notary NOTARY PUBLIC.CALIFORNIA
FRESNO COUNTY "+
�_Lem*Comm.Expires Sept.28,2005
STATE OF CALIFORNIA )
SS.
COUNTY OF )
On before me,
a Notary Public in and for said County and State, personally appeared
personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s)
Is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s)acted, executed the instrument.
WITNESS my hand and official seal.
Signature of Notary
EXTNOT1 -09/25/96bk
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
COUNTY OF FRESNO )
CITY OF FRESNO )
On 0 !/ , 2001 before me, personally
appeared ,to a-'& Lt,-c 2 2 c.cz personally
known to me (or provided to me on the basis of satisfactory evidence) to be the person
whose name is subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized capacity, and that by his/her/their
signature on the instrument the person, or the entity upon behalf of the CITY OF FRESNO
of which the person acted, executed the instrument.
WITNESS my hand and official seal.
REBECCA E. KLISCH
CITY CLERK
DEPUTY
FINAL PM 00 12 Agreement v3/3/2000
by Lcati RQC1�,#? tob ,2gQ4.
Final Parcel Map No. 2000-12
P.W. File No. 5494-2000-12
SUBORDINATION
The undersigned as holder of the beneficial interest in and under that certain Deed of
Trust recorded on December 7, 2000 as Document/instrument No. 2000-0149494 in the
office of the Fresno County Recorder of which the Deed of Trust in, by and between
TRUSTOR: Clinton - Fowler Industrial Park, LLC, a California Limited Liability Company,
and TRUSTEE: American Securities Company, a Corporation and BENEFICIARY: Well
Fargo Bank, a National Association, hereby expressly subordinates said Deed of Trust and
its beneficial interest thereto to the foregoing Parcel Map Agreement for Parcel Map No.
2000-12.
DATED: , 200 /
BENEFICIARY
WELL FARGO BANK, a National Association
By: l/-
CYCt
By:
(Beneficiary to Type Names, Titles&Attach Notary Acknowledgments)
STATE OF CALIFORNIA )
Fresno ) SS.
COUNTY OF )
On' 11/21/01 beforeme, Michael S . DeYoung
a Notary Public in and for said County and State, personally appeared Neal Crapo
personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s)
Is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s)acted, executed the instrument.
WITNESS myhand and official seal.
Michael Scott De Young
Comm.#1322485
Signature of N NOTARY� ORN
wouNTy
wb
comm.Expires Sept.28,2005
STATE OF CALIFORNIA )
SS.
COUNTY OF )
On before me,
a Notary Public in and for said County and State, personally appeared
personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s)
Is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s)acted, executed the instrument.
WITNESS my hand and official seal.
Signature of Notary
EX NOT1 --09/25/96bk
EXHIBIT A Parcel Map Agreement for Parcel Map No. 2000 - 12
A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $82,711
Well Construction Cost Estimate $0
Sewer System Construction Cost Estimate $62,502
Street Construction Cost Estimate $530 652
Final Cost Estimate (for Inspection Fee purposes) $675 865
132 Landmarks, Monuments, Lot& Block Comers ($50/ea) $:6:6:00
Sub-Total (for bonding purposes) $682,465
Construction Contingency (10%) $68,247
TOTAL COST ESTIMATE"
(for improvement securities purposes) F� $7�50,712 $751,000
"All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)
Performance Security (100% of Total Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $713,450
5% of amount shall be in cash or a Certificate of Deposit $37,550
Payment Security (50% of Total Cost Estimate)
100% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $375,500
Faithful Peformance Security to Guarantee Completion of Plans
Street Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street Light Plans $0
Landscaping/Irrigation/Walls $0
100% of amount shall be in cash or a Certificate of Deposit 1 $0
C. WARRANTY SECURITY REQUIREMENT" (due as condition of acceptance of the work)
5% of first$50,000 of the Total Cost Estimate $3,000
3% of next$50,000 $2,000
1%of next$400,000 $4,000
0.5% of amount over$500,000 $1,300
Minimum amount $10,300
EXHIBIT A v4/28/00 Prepared By: Louis Rocha Up/Date:10/23/01 Print Date:10/25/01 1:24:42 PM Page 1 of 1
EXHIBIT B Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
A. MISCELLANEOUS FEES&CHARGES
1. INSPECTION FEE
Final Cost Estimate<_51 OK na
(7%;$300 minimum fee)
Final Cost Estimate>510K<$5001< na
($700+4%of amount over$1 OK)
6675 Final Cost Estimate over$500K 524 696.63
($20,300+2.5%of amount over$500K)
Less Inspection Fees paid with Early
SewerANater Construction Agreement $8161.00
Less Inspection Fees paid with Early Street
Construction Agreement 516 535 63'_i
Inspection Fee 0.00 0.00
2. MONUMENT CHECK FEE
Lots and Outiots @ 530.00 per Lot S1 800.00 $1,800.00
(Min$200)
3. STREET SIGNS
Street Name Sign sets 5173.00 per set S1 038.00I S1 038.00
Warning/Regulatory signs 577.00 sign 5231.00 $231.00
4. STREET TREES
Residential(5-gallon)Street Trees $102.00 per Tree na na (Al)
0Commercial(15-gallon)Street Trees $129.00 per Tree na na (Al)
(Al) Street Tree fees will be payable at the time of development of each
parcel unless otherwise determined by the Park Division.
5. STREET RIGHTS OF WAY ACQUISITIONICONSTRUCTION CHARGE per FMC 11-226((x6)
Lump Sum Charge as established by Public Works Director na na
6. IRRIGATION PIPELINE(one-time maintenance fee)
DO Lineal Feet 55.00 per LF na na
CHARGESITOTAL(A) MISCELLANEOUS FEES&
CnD\A D\A Anu.. .6 CY41DIT 0,Ar%M D.,o;�� It i D..— De., n--+1119K 1 D.;-.A 11119K1 1n ro Cr e.A
EXHIBIT B Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED
31.2242 Gross Acres
0.0000 Net Acres
28.5308 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
0 Units(residential)
86 LUE(non-residential)
M-1 Zoning
u m Input'ugm'U within the Urban Growth Management Area or'nd
1. LOCAL DRAINAGE FEES
FMFCD Drainage Area
0.0000 Acres per FMFCD SO per Acre na
FMFCD Drainage Area
0.0000 Acres per FMFCD SO per Acre na
Local Drainage Fee $0.00 (B1)
(B1)All or portion of fee obligation satisfied pursuant to FMFCD agreement.
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
Frontage: 0 SF
Frontage: East Clinton Avenue 32 800 SF
Frontage: O SIF
Total Square Feet L "F
32 800 SF; sub-total Lateral Sewer Charge 50.10 per SF S3 280.00
Less estimated Lateral Sewer Charge Credits $0.00
Lateral Sewer Charge � $0.00 S3 280.00
(b Oversize Sewer Charge
UGM Reimbursement Area
Frontage: North Fowler Avenue 100 078 SF
Frontage: East Clinton Avenue 109145 ISF
Frontage: O ISF
Total Square Feet 1 "F
209 223 SF;sub-total Oversize Sewer Charge 50.05 per SF 570,461.15
Less estimated Oversize Credits 50.00
Less estimated Overdepth Credits $0.00
Oversize Sewer Charge I $10.= $0.00 S70 461.15
(e)Trunk Sewer Charge
Trunk Sewer Service Area
0 Units per Unit $0.00
(d)Wastewater Facilities Charge
S.T.E.P.
(e) Sewer Capacity Enhancement Charge
na Trunk Sewer Service Area
0 Units 50.00 per Unit 1 $0.00
FnRM PM An---f FYW1RfT R J%MM Rv Rirk Gnmmerville R 1 R—h.Rev n.w i l timni Print.HIIIIA/nl in nQ-5R eM Pa... r,f R
EXHIBIT B Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
3. WATER CONNECTION CHARGES
(a)Time 3 Material Charges("Wet-Tie")
20001128 Estimate Number
4794 Water Job Number
Estimated Deposit(FMC 14-1114) 1 $36,510.00 $0.0-0-1(83)
(133) Deposit paid with Early Construction Agreement
(b1)Service Connection Charges
0 1"Meters to existing services 5320.00 each 50.00 $0.00 $0.00
0 1-1/2'Meters to existing services $470.00 each $0.00 $0.00 $0.00
0 2'Meters to existing services =620.00 each $0.00 $0.00 $0.00
0 1 1"Services($735)d Meters($195) $930.00 each $0.00 $0.00 $0.00
0 11-1 R'Services($880)b Meters($340) $1,220.00 each $0.00 $0.00 $0.00
0 2"Services($1,010)d Meters($411) $1 421.00 each $0.00 $0.00 $0.00
(b2)Landscape Service Connection Charges
0 1"Meters to existing services $320.00 leach $0.00 $0.00
0 1-1 R'Meters to existing services $470.00 leach $0.00 1 $0.00
0 2'Meters to existing services $620.00 leach I $0.00 $0.00
11"Services(es($1 d Meters ors($ $930.00 each $0.00
0 1-1R'Services($880)d Meters($340) � $1,220.00 each $0.00 $0.00
0 2"Services($1,010)d Meters($411) $1,421.00 leach $0.00 $0.00
(c)Frontage Charge
Frontage: 0 LF
Frontage: 0 LF
Frontage: ��0 ,LF
Sub-Total Lineal Feet(%rate) 1 DLF
OLF; sub-total Frontage Charge(%rate) $3.25 per LF na
Frontage: North Fowler Avenue 925 LF
Frontage: East Clinton Avenue 1,06gLF
Frontage: 1 0 ILF
Sub-Total Lineal Feet(full rate) 1,991 LF
1 991 LF; sub-total Frontage Charge(full rate) $6.50 per LF $12 941.50
Sub-Total Frontage Charge $12 941.50
Less estimated Frontage Charge Credits 1 $0.00
Frontage Charge 12,941.50 $0.00 $12,941.50
(d)Fire Hydrant Charge
SF;residential zoning $0.75 per 100 SF na nal
998 473 SF;non-residential zoning $1.25 per 100 SF ®1 na $12,480.91
EXHIBIT B. Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
(e)Transmission Grid Main Charge
E UGM Reimbursement Area
31.2242 Gross Acres 5560.00 per Gr Acre 17485.55
0.0000 Net Acres 5700.00 per Net Ac na
Less EstimatedTGM Construction Credits 50.00
Transmission Grid Main Charge ®0.
(f)Transmission Grid Main Bond Debt Service Charge
31.2242 Gross Acres 5243.00 per Gr Acre 57 587.48
0.0000 Net Acres 5304.00 per Net Ac na
Less EstimatedTGM Bond Debt Service Charge Credits $0.00
Transmission Grid Main Bond Debt Service Charge $7,587.48 50.001 $7,587.481
(g)UGM Water Supply Fee
501s Supply Well Service Area
0 1 Living Units(residential) 50.00 per Unit 50.00
®Living Unit Equivalents(LUE);non-residential 5507.00 per Unit 543,602.00
Less Estimated UGM Water Supply Fee Construction Credits $0.00
UGM Water Supply Fee4® $0.00 543,602.00
(h)Well Head Treatment Fee
01501 Well Head Treatment Service Area
Living Units(residential) 50.00 per Unit 50.00
®Living Unit Equivalents(LUE);non-residential 5207.00 per Unit 517,802.00
Less Estimated Well Head Treatment Fee Construction Credits $0.00
Well Head Treatment Fee $17,8 $0.00 517802.00
(i)Recharge Fee
501 Recharge Service Area
01 Living Units(residential) 50.00 per Unit 50.00
®
Living Unit Equivalents(LUE);non-residential 561.00 per Unit 55,246.00
Lou Estimated Recharge Fee Construction Credits 1 $0.00
Recharge Fee I 50.00 55 246.00
(j)1994 Bond Debt Service Fee
501 1994 Bond Debt Service Fee Service Area
0 1 Living Units(residential) 50.00 per Unit 50.00
86 Living Unit Equivalents(LUE);non-residential per Unit 520 984.00
Leu Estimated 1994 Bond Debt Service Fee Construction Credits $0.00
1994 Bond Debt Service Fee 1 $20,984.00 $20,984.00
EXHIBIT B Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
4. URBAN GROWTH MANAGEMENT(UGM)FEES 3 CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
F---N.Dl Fire Station Service Area
31.2242 Gross Acres i1 600.00 per Gr Acre i49 958.72 ®0. 4 8
(b)UGM NEIGHBORHOOD PARK FEE
2 Neighborhood Park Service Area
31.2242 Gross Acres 5440.00 per Gr Acre i13 738.65 =0.00 i13 738.65
(c)UGM MAJOR STREET CHARGE
D-1/E-2 Major Street Zone
28.5308 Adjusted Gross Acres i2 180.00 per AG Ac i62 197.14
Less Estimated Major Street Charge Construction Credits $83.260.00
Major Street Charge 0.001 1 $0.001Paid w!Credits
(d)UGM MAJOR STREET BRIDGE CHARGE
D-1/E-2 Major Street Bridge Zone
28.5308 Adjusted Gross Acres a =210.00 per AG Ac SS 991.47
Less Estimated Major Street Bridge Charge Construction Credits
Major Street Bridge Charge 1 $5,991.471 1 =0.00 SS 991.47
(e)UGM TRAFFIC SIGNAL CHARGE
28.5308 Adjusted Gross Acres =860.00 per AG Ac S24 536.49
Less Estimated Traffic Signal Charge Construction Credits $6,700.00
Traffic Signal Charge $17,836.49 1 $0.0-011 ,836.49
(f)UGM GRADE SEPARATION CHARGE
Grade Separation Service Area
28.5308 Adjusted Gross Acres a 50.00 per AG Ac na
Less Estimated Grade Separation Charge Construction Credits 50.00
Grade Separation Charge 50.00 $0.01
(g)UGM AT-GRADE RAILROAD CROSSING FEE
At-Grade RRXing Service Area
28.5308 Adjusted Gross Acres a =0.00 per AG Ac na
Less Estimated At-Grade RRXing Charge Construction Credits 10.00
At-Grade RRXing Fee 1 $0.001 50.00 $0.00
(h)UGM TRUNK SEWER FEE
Trunk Sewer Service Area
28.5308 Adjusted Gross Acres @ =0.00 per AG Ac na
Less Trunk Sewer Fee Credits =0.00
Trunk Sewer Fee 1 $0.001 $0.00
EXHIBIT B Parcel Map Agreement No. 2000 - 12
AMOUNT
EXTENSION NET AMOUNT DUE DEFERRED
(1)OVERLAY SEWER SERVICE AREA
Millbrook Overlay Service Area �
28.5308 Adjusted Gross Acres � =0.00 per
r AG Ac na =0.00 0.00
Total Impact Fees&Charges $275,905.92 $0.00 $239 395.92
SUMMARY
TOTAL(A) MISCELLANEOUS FEES&CHARGES 1 $3,069.001
TOTAL(B) IMPACT FEES&CHARGES $0.001 $239,395.92
TOTAL FEES and CHARGES DUE WITH PARCEL MAP AGREEMENT cash $3,069.00