Loading...
HomeMy WebLinkAboutPM 2017-11 - Conditions of Approval - 12/22/2017 CITY OF FRESNO DEVELOPMENT He RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL DECEMBER 22, 2017 VESTING TENTATIVE PARCEL MAP No. 2017-11 "FOR CONDOMINIUM PURPOSES" LOCATED ON THE SOUTH SIDE OF EAST SPRUCE AVENUE BETWEEN NORTH SPALDING AND NORTH SHARON AVENUES NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act (SMA), Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on a development project. Upon conditional approval of Vesting Tentative Parcel Map No. 2017-11, dated October 23, 2017, the subdivider may prepare a Parcel Map (Final) in accordance with the approved tentative parcel map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 15-3314 of the FMC, the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 15-5017 of the FMC. Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map, together with a copy of Section §66436(a)(3)(A)of the SMA,to any public entity or public utility which has previously acquired a right-of-way easement. ZONING 1. Comply with the provisions of the State of California Government Code Sections §66410 - §66499.58 of the SMA and Articles 31 (Land Division) and 35 (Parcel Maps)of Chapter 15 of the FMC. 2. Pursuant to Section 15-3503 of the Fresno Municipal Code and upon approval of Vesting Tentative Parcel Map No. 2017-11, the subdivider may apply fora waiver of the requirement for a Parcel Map. a) A subdivider may request the waiver of the requirement for a Parcel Map, and the waiver may be granted, in compliance with the Map Act (Section 66428), provided that the Director shall first find that the proposed subdivision complies with all applicable Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 2 requirements of this Development Code and the Map Act as to area, improvement and design,floodwater drainage control, appropriate improved public roads,sanitary disposal facilities, water supply availability, environmental protection, and all other applicable requirements of this Development Code and the Map Act. i) Where public improvement requirements or fee payment obligations have been made (included within the conditions of approval contained herein), such requirements or obligations must be deemed to have been satisfied prior to acceptance of an application for a Parcel Map Waiver. • NOTE: Where public improvement requirements or fee obligations have been included herein, a certificate of completion or satisfaction of requirements shall be obtained from the respective department or agency responsible for the applicable public improvement requirement orfee obligation priorto submittal of an application for a Parcel Map Waiver. Such certificate shall be submitted to the Public Works Department, Traffic and Engineering Services Division, Land Section with an application for waiver of a Parcel Map. 3. Whenever a subdivision, includes area under common ownership(such as is the case within a common interest development for condominium purposes), the use, maintenance, and operation thereof shall be administered and governed by an association regulated by covenants, conditions, and restrictions (CC&R's) pursuant to Chapter 15-Article 40 of the Fresno Municipal Code and in accordance with the provisions and requirements related to Common Interest Developments pursuant to the Davis-Stirling Common Interest Development Act (§§1350-1376 of the California Civil Code). a) Declarations of Covenants, Conditions and Restrictions/Owners'Association documents (DCC&R's)which may be prepared for a Condominium Project on the subject property shall incorporate provisions in accordance with Chapter 15-Article 40 of the Fresno Municipal Code. i) Prior to the submittal of documents to obtain a public report for a Condominium Project and/or prior to the recordation of a Parcel Map and Condominium Plan as defined in Section 1351(e) of the California Civil Code, whichever is earlier, the subdivider shall submit to the City for review the Condo Plan, DCC&R's and association instruments, which shall be prepared compliant with any respective conditions or requirements identified by special permits/entitlements applicable to the subject property and/or the tentative parcel map and associated conditions of approval included herein. • NOTE: Failure to comply with the terms of required Covenants may result in the revocation of a Certificate of Occupancy or Special Permit by the City for use of any Parcel of the properties involved. Accordingly, the City of Fresno shall have the right to enforce this Statement by any legal or equitable means. For further information regarding these requirement Contact the Development and Resource Management Department at (559) 621-8277. Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 3 GENERAL CONDITIONS 4. Contact Israel Trejo, Planner, in the City of Fresno Development and Resource Management Department at (559) 621-8044 or via email at Israel.Trelo(a-)-fresno.gov for assignment of addresses to parcels and/or airspaces proposed to be created from a subdivision/condominium plan of/on the subject property. • NOTE: It is recommended that at least 6 months prior to the first occupancy,the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details)to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. 5. Any existing and/or proposed structure(s) on the site which may be utilized in conjunction with a condominium project are required to maintain compliance with any applicable standards of the California Building Code as it relates to wall protection, allowable area, etc. a) Compliance with the prevailing California Building Code must be demonstrated, respective to the location of new condominium boundaries which may be proposed to be described on a condominium plan, prior to recordation of a Condominium Plan. Contact the Development and Resource Management Department, Building and Safety Services Division at (559) 621-8200. • NOTE: In the event the structures do not comply with any applicable standards of the California Building Code, they must be modified so as to meet the standard. b) This project was reviewed by the fire department only for requirements related to water supply, fire hydrants, and fire apparatus access to the building(s) on site. Review for compliance with fire and life safety requirements for the building interior and its intended use are reviewed by both the Fire Department and the Building and Safety Section of DARM when a submittal for building plan review is made as required by the California Building Code by the architect or engineer of record for the building. 6. When required, all work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution No. 70-36 and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the Public Works Standards. a) Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 4 7. The subdivider shall dedicate and construct public easements to facilitate the construction of public improvements (when applicable) within the limits of the parcel map. a) All such public easements shall be identified and dedicated with the processing and recordation of a Parcel Map. 8. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants, poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction with the construction of off-site improvement requirements, shall be the responsibility and at the expense of the subdivider. 9. The subdivider may either construct or install required public improvements,when required; or, enter into a bonded secured agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the recordation of a Parcel Map (final). 10. Whenever covenants or agreements are required, they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and agreements must be approved by the City Attorney's Office and shall be recorded with the final parcel map. SPECIFIC CONDITIONS STREETS AND RIGHTS-OF-WAY 11. The subdivider shall comply with all requirements and conditions included within the attached Department of Public Works, Traffic and Engineering Services Division memorandum dated November 17, 2017. PUBLIC UTILITIES Sanitary Sewer Service 12. The subdivider shall complywith all requirements included within the attached Department of Public Utilities, Planning and Engineering (Sanitary Sewer)memorandum dated December 04, 2017. Water Service 13. The subdivider shall complywith all requirements included within the attached Department of Public Utilities, Water Division memorandum dated December 04, 2017. Solid Waste Service 14. The subdivider shall complywith all requirements included within the attached Department of Public Utilities, Planning and Engineering (Solid Waste Management) memorandum dated August 17, 2017. Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 5 FRESNO METROPOLITAN FLOOD CONTROL 15. The subdivider shall comply with all requirements included within the attached Fresno Metropolitan Flood Control District memorandum dated November 27, 2017. DEVELOPMENT FEES AND CHARGES Pursuant to Government Code§66020(d)(1)each local agency shall provide to the project applicant a notice in writing at the time of the approval of a project or at the time of the imposition of the fees, dedications, reservations, or other exactions a statement, and notification that the 90-day approval period in which the applicant may protest has begun (please see Notice to Project Applicant contained herein above for further information). This project is subject to the following development fees and charges: a. Applicable Drainage and Notice of Review (NOR) Fees as determined by the Fresno Metropolitan Flood Control District. (Reference Fresno Metropolitan Flood Control District requirements included herein above and notes below for further information) SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth) c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charge S.T.E.P.** Service Area: Cornelia e. Wastewater Facilities Charge S.T.E.P.** f. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE g. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. h. Frontage Charge [1] $6.50/lineal foot i. Water Capacity Fee [1] Fee based on meter(s) sizes specified by owner; fee established Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 6 by the Master Fee Schedule. CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE j. Fire Facilities Impact Fee— Citywide [4] - Commercial Office $303/1000 sq.ft. t k. Park Facility Impact Fee — Citywide [4] - Commercial Office N/A I. Quimby Parkland Dedication Fee [2] - Commercial Office N/A m. Citywide Regional Street Impact Fee [3] - Commercial Office $14,266/adj. acre n. New Growth Area Major Street Fee [3] - Commercial Office $35,826/adj. acre o. Police Facilities Impact Fee — Citywide [4] - Commercial Office $594/1000 sq.ft. t p. Traffic Signal Charge [1] - Commercial Office $550/1000 sq.ft. t Notes: On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008—023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No.2009—01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. **Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. Conditions of Approval Vesting Tentative Parcel Map No. 2017-11 December 22, 2017 Page 7 [3] Due at Building Permit. [4] Due at Certificate of Occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. Average Daily Trips to be determined by Traffic Engineering. City of C0bcd5\t DATE: November 17, 2017 TO: Will Tackett Development and Resource Management Department FROM: Louise Gilio, Traffic Planning Supervisor Department of Public Works, Traffic and Engineering Services Division SUBJECT: Tentative Parcel Map 2017-11, Public Works Conditions of Approval Location: 1243 East Spruce Avenue Spruce Partners, LLC/ Harbour &Associates PUBLIC IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed prior to perfection of this parcel map. Contact Jon Bartel at (559) 621-8684. General Conditions • Repair all damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5600. • Provide a 12[[ELVLEtO-'AAU UI:[<HIIH[Dgdriveways intersect streets.Street Dedications and / or Vacations P EEQF❑ 13-i❑DO"LRAG-iADEP LLP EP ER❑❑❑FMD R:1DFFRP P R NEDFFHWEDR,❑J E%H--ICU'll1HdV1Atl-M frontage of this map. Contact the Public Works Department, Traffic and Engineering Services Division, Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or public easements. All existing sidewalks in excess of 2% maximum cross slope must be brought into compliance prior to acceptance by Public Works. Contact Ken Turner from the Construction Management Division at 621- 5610 for verification of existing sidewalk conditions. Page 1 of 2 TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-11 SPRUCE 1243 E\PM 2017-11 SPRUCE 1243 E.doc The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment covenant is approved by the City of Fresno Public Works Department, Traffic and Engineering Services Division. Contact Jason Camit at (559) 621-8681. Encroachment agreements must be approved prior to final map. Frontage Improvement Requirements All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Traffic and Engineering Services Division at (559) 621-8670 for detailed information. Public Streets: Spruce Avenue: Local Collector 1. Construction Requirements: a. Construct a driveway approach to Public Works Standards P-2 and P-6. Construct a concrete pedestrian walkway behind all driveway approaches -OR- identify as existing. b. Construct concrete sidewalk, curb and gutter and to Public Works Standard P-5. The curb shall be constructed to a ❑❑❑commercial pattern. Planting of street trees shall conform to the minimum spacing guidelines as stated in the Standard Specification, Section 26-2.11(C). -OR- identify as existing. c. Construct an underground street lighting system to Public Works Standard E-2 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-9. - OR- Show the existing street light locations on the plans, -AND- that they are constructed per current City of Fresno Public Works Standards Traffic Signal Mitigation Impact (TSMI) Fee and Fresno Maior Street Impact (FMSI)Fees: Contact the Public Works Department, Frank Saburit at (559)621-8797. Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocog.org. Provide proof of payment or exemption prior to granting final occupancy. Page 2 of 2 TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-11 SPRUCE 1243 E\PM 2017-11 SPRUCE 1243 E.doc City of DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: December 4, 2017 TO: WILL TACKET, Supervising Planner Department of Development and Resource Management FROM: KEVIN GRAY, Supervising Engineering Technician Department of Public Utilities, Planning and Engineering SUBJECT: SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-11 General Tentative Parcel Map No. 2017-11 for property located on East Spruce and North Spalding between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue, APN: 404-030-56. The property is zoned O/UGM/cz (Office/Urban Growth Management/Conditions of Zoning.) Sewer Requirements The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main located in East Spruce Avenue. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. On-site sanitary sewer facilities shall be private. 2. The Project Developer shall contact Wastewater Management Division/Environmental Services at (559) 621-5100 prior to pulling building permits regarding conditions of service for special users. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Oversize Area #3. 2. Herndon Trunk Enhancement Fee. A Nationally Accredited Public Utility Agency •n.w•� MEMORANDUM WILL TACKET, Supervising Planner Department of Development and Resource Management December 4, 2017 SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-11 Page 2 of 2 3. Sewer Facility Charges are collected after occupancy on a monthly basis over time based on metered (water or sewer effluent) usage. The developer may contact the Department of Public Utilities/Wastewater-Environmental Control at (559) 621-5153 to receive an estimated cost of the Sewer Facility Charges applicable to the project (based on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. City of cQCL'��� IrrIk �: .vejgv DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: December 4, 2017 TO: WILL TACKETT, Supervising Planner Department of Development and Resource Management FROM: ROBERT A. DIAZ, Senior Engineering Technician Department of Public Utilities— Utilities Planning & Engineering SUBJECT: WATER REQUIREMENTS FOR PARCEL MAP NO PM-2017-11 General Tentative Parcel Map No. 2017-11 for property located on East Spruce and North Spalding between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue, APN: 404-030-56. The property is zoned O/UGM/cz (Office/Urban Growth Management/Conditions of Zoning.) Water Requirements The nearest water main to provide service to the proposed project is an existing 8-inch water main located in East Spruce Avenue. Water facilities will be available to provide water service to the site subject to the following requirements: 1. On-site water facilities shall remain private. The water supply requirements for this project are as follows: 1. The existing property is currently served with a 2-inch water meter and a 1.5-inch irrigation meter. a. If the total domestic, commercial, industrial and irrigation water demands for the applicant's proposed project can be accommodated with the existing 2-inch water meter and a 1.5-inch irrigation meter, then the applicant shall not be required to pay a Water Capacity Fee Charge. b. If the total domestic, commercial, industrial and irrigation water demands for the applicant's proposed project cannot be accommodated with the 2-inch water meter and a 1.5-inch irrigation meter, and an additional water service or a larger water service is required, then the applicant shall be required to pay a Water Capacity Fee Charge. i. If an additional water meter is required, the Water Capacity Fee charge To A Nationally Accredited Public Utility Agency MEMORANDUM CHRIS LANG, Planner II Department of Development and Resource Management December 4, 2017 Water Requirements for Development Permit Application D-17-161 Page 2 of 2 assessed to the applicant shall be based on the size of additional water meter. The Water Capacity Fee charges by meter size are published in the City's Master Fee Schedule. ii. If a larger water meter is required to accommodate the new, larger water demands, then the Water Capacity Fee charge shall be calculated by subtracting the Water Capacity Fee charge associated with the existing water meter size from the Water Capacity Fee charge associated with the larger water meter size required for the applicant's project. The Water Capacity Fee charges by meter size are published in the City's Master Fee Schedule. c. The City reserves the right to require an applicant to increase or decrease the size of a water meter for a project or a property to ensure that the meter is properly sized to accommodate fire protection requirements, and to allow for accurate volumetric flow measurements at low- and high-flow conditions. d. The Water Capacity Fee Charge for any new or expanded service connection shall be payable prior to the issuance of a building permit at the fee level in effect on the date such permit is issued. 2. The project applicant shall be required to pay all other water-related fees and charges in accordance with the City's Master Fee Schedule and Municipal Code. City of Cmilin _%ILI a� DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: August 17, 2017 TO: WILL TACKET, Supervising Planner Department of Development and Resource Management FROM: KEVIN GRAY, Supervising Engineering Technician " Department of Public Utilities, Planning and Engineering SUBJECT: SOLID WASTE REQUIREMENTS FOR TENTATIVE PA L MAP NO. 2017-07 General Tentative Parcel Map No. 2017-11 for property located on East Spruce and North Spalding between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue, APN: 404-030-56. The property is zoned O/UGM/cz (Office/Urban Growth Management/Conditions of Zoning.) Solid_WasteReguirements The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main located in East Spruce Avenue. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. On-site sanitary sewer facilities shall be private. 2. The Project Developer shall contact Wastewater Management Division/Environmental Services at (559) 621-5100 prior to pulling building permits regarding conditions of service for special users. Sanitary Sewer Fees Limited routing. Solid Waste comments not requested by Planning. Does Proiect Affect Your Agency/Jurisdiction Yes - Project has or will be required to provide a trash enclosure. A AA, A Nationally Accredited Public Utility Agency f W-. MEMORANDUM WILL TACKET, Supervising Planner Department of Development and Resource Management July 13, 2017 SOLID WASTE REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-07 Page 2of2 Recommended Conditions of Approval Enclosure shall be built in accordance with current City of Fresno Standards P-33 and P-34. Additional Information Location of enclosure is acceptable. Storm water Pollution Prevention Enclosure pads must be designed to prevent contamination of the storm water system. Measures that may be taken to achieve this include, but are not limited to, using roofs to divert storm water away from the enclosures, creating grade breaks to properly direct storm water away while keeping any water that may be in the enclosure from spilling out, and connecting a drain in the enclosure to the sewer system to collect contaminated water in cases of spillage, washing, etc. FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.411 NOTICE OF REQUIREMENTS Page 1 of 4 PUBLIC AGENCY DEVELOPER WILL TACKETT ALAN PIRIE, SPRUCE PARTNERS,LLC on DEVELOPMENT SERVICES/PLANNING 1187 N.WILLOW AVE.,SUITE 103 CITY OF FRESNO CLOVIS,CA 93611 2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93721-3604 PROJECT NO: 2017-011 ADDRESS: 1243 E.SPRUCE AVE. t t APN: 404-030-56 SENT: O� � / Ma Drainage Area(s) Preliminary Fee(s) Development Review Fee(s) ` Service Charge(s) CM $0.00 NOR Review $50.00 To be paid prior to release of District comments to Public Agency and Developer. ic Grading Plan Review $0.00 Amount to be submitted with first grading plan submittal. Total Drainage Fee: $0.00 Total Service Charge: $50.00 The proposed development will generate Storm runoff which produces potentially significant environmental impacts and which ■ must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first submittal.The Storni Drain Plan fee shall be paid prior to return/pick up of first submittal. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/18 based on the site plan 0 submitted to the District on 11/08/17 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. 1� Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d.) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, e') reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall REMAIN AS EXISTING. Mn b. Grading and drainage patterns shall be as identified on Exhibit No. _ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and C. Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: — Developer shall construct facilities as shown on Exhibit No. 1 as X None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: Grading Plan 0 Street Plan Storm Drain Plan Water&Sewer Plan Final Map Drainage Report(to be submitted with tentative map) 0A Other X None Required 4. Availability of drainage facilities: M' X Permanent drainage service is available provided the developer can verify to the satisfaction of the City ML a' that runoff can be safely conveyed to the Master Plan inlet(s). — b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant on Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July ' 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April,2014 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for 0 manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of ■ Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges,conduct routine bL site inspections,train employees in permit compliance, sample storm water runoff and test it for pollutant INV indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls 0 recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction !L Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible %4 minimize contact with materials which may contaminate storm water runoff. 10 S. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District 10 within ten days of the date of this Notice of Requirements. ML 9. The District reserves the right to modify,reduce or add to these requirements, or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No.2 for additional conunents,recommendations an requirement Debbie Campbell 001 Michael Maxwell Design Engineer Project Engineer 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 CC: LORREN SMITH,HARBOUR&ASSOCIATES mn 389 CLOVIS AVE.,SUITE 300 CLOVIS,CA 93612 z 0 ■ 0 ML ft4 0 ML ML 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 OTHER REQUIREMENTS EXHIBIT NO. 2 In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and maintained such that material that may generate contaminants will be prevented from contact with rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm drain systema The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Development No. TPM 2017-.011 k:\perm its\exhib it2\city-tpm\2017\2017-011,docx(mm) VESTING W TENTATIVE Z W ALLUVIAL AVENUE w � w w o W I NO , PARCELa >< EX. COMMERCIAL/OFFICE .:._...:......... V) PROJECT E O/UGU/CZ 3� SIT � I Aa�`� W404-030- 17L0 Ld G - �� Q _ J S EXISTING g TRANSFORMER "'�•' W -W :.-.�... FOR COMM ERC CONDOMINIUM PURPOSES w NTS �- 'ti IN THE CITY OF FRESNO NORTH SPALDING S S FRESNO COUNTY, CALIFORNIA 20 17 11 250.03 �- HERN DON AVENUE ..- ....,:.... .. v ....�.....�.71.... ..w �................ �...,.,:.- I •:. S AVENUE { ... .. ,.,....I -10C.,:...:.................. 00-00 mom. S .t,. �.... I A 10' PUE • k r \ ,0 \\ 'EX. BUILDING 2 10 PG&E EASEMENT 0011111 I O -} LEGAL DESCRIPTION `\,�� I � 23 1 = I PARCEL A OF PARCEL MAP NO. IN THE CITY OF VICINITY MAPNN� -� 2002 12, ` .• ACCORDING PARCEL A FRESNO, COUNTY OF FRESNO, STATE OF CALIFORNIA, z 1 s: }:: I \ ( TO THE MAP THEREOF RECORDED IN BOOK 62 PAGE 34 OF 10=111 45,032 s .ft. :....d L,J a PARCEL MAPS, FRESNO COUNTY RECORDS. \. , .. 11011 ,\ ;.' \ !1!\!\\n!!\0\ \ s ,\` ;,.,..,,,, ,.;�.,,, :a 01 H I Vii: L,J PARCEL A �:. - ..•�,.t �, N w \P M 2002-12 ':_;• :. ,,:.. NOTE. o �•, Q - _-.... ..:_ : . t:�ti: � \\_t-;:-�: .♦ \ .:� 1 THERE ARE NO EXISTING SEPTIC TANKS OR LEACHING FIELDS ONSITE. VACANTo ,. - ,:!_ �� 1... I -No 87079808 :a �� .: =ti.- "�-� �,� \*.�::��. \ 2 10 PG&E EASEMENT RECORDED 6-30-87, DOC ...,...v..„....,.vv.,.,,,.,............_,.... '. ••r•- - U N DRESS O/UGU/CZ co o SITE AD i + _ • - „' .J• :,�ti, to-"""..i �: :,,. ,. .:t= .� � .' •.--•. � :.- :_. 1243 EAST SPRUCE AVENUE FRESNO, CA 93720 404-040-54 l� •— _ -•;l- JEX I STING ZONING I 4.5' o I 0/UGU/CZ 19 T'hft--q Dl ® ® ® �_ .: PROPOSED ZONING �. � V EXISTING TRASH Q 0/UGU/CZ -- Ld ENCLOSURE w 'o: 4 EX. PARKING LOT EXISTING LAND USE '-�.•� � COMMERCIAL OFFICE .-_ OCT 2 30 2017 10 PLANNED LAND USE _ ET SERVICES ❑ ❑ r� }�• COMMERCIAL/OFFICE CITY OF FRESNO _ '{.. _J•`>l• �{• .�.i:'^ - � a�fe..1:l rr. :t. .. _�t.•i^Y- f•:, - -1.�.`__�-C: _.}i�-�Iw•'.L.1 n:i:4 e —•Y:: ��;.�_?`.•�-'•.:S.e _.i%' >?)e:•i � 3: I SOURCE OF WATER CITY OF FRESNO .�- - 1. �, :•.•:♦�, METHOD OF SEWAGE DISPOSAL 42 CITY OF FRESNO • 42 :•Y•�: ASSESSOR'S PARCEL NUMBER ,••.• � 404-030-56 -.- S ITE AREA 1.03 AC. GROSS) 10, 1.03 AC. N - •-1 SOURCE OF DTA •3•- PARCEL MAP NO. 2002-129 COUNTY OF FRESNO, CA ♦.:. �'�•- LEGEND INDICATES STREETS PREVIOUSLY DEDICATED FOR PUBLIC USE EX. COMMERCIAL/OFFICE VACANT PROPERTY LINE AND SUBDIVISION BOUNDARY O/UGU/CZ -`:•• EXISTING O/UGU - "-� STREET S - EX. SEWER MAIN TO REMAIN .•�'}-'•� LIGHT TYP. .°f 404 0�0 6� 404-030-57 .l:.t - -W- - EX. WATER MAIN TO REMAIN • - - SD- - EX. STORM DRAIN MAIN TO REMAIN t•.-err• / r _ APM -7 TR DAT E :Y •1 -,-•j •t•• ••Iy♦' O C pp1'1 i..:� �19 C y�C���"°A S�S.F,.r}'m.�y a �h R 'l 7 B,j�•Z F;"R .'S �"t tu•y s4i�9.�� !•�a. g• •• .�.• •b,7'r 4.°4 3 3�t...k ��m i'.`. ?.`e:a ' � 3 d / C'e:�"a'y S D D ,♦ • V t. SCALE: 1 40 RO '::'♦. -. .. .: GRAPHIC SCALE .. . r �'' •"•' � �Q 0 20 40 80 Fd � So \ S ID TENTATIVE PARC L MA 404-030-34 OWNER&SUBDIVIDER SPRUCE PARTNERS, LLC 1187 N.WILLOW AVENUE,SUITE 103 404-030-29 CLOVIS,CA.93611 (559)-435-1300 Harbour &Associates Civil Engineers 389 Clovis Avenue, Suite 300 • Clovis, California 93612 (559)325-7676 • Fax 559 325-7699 •e-mail lorrens@harbour-engineering.com DATE: 10-16-17 D RAW N BY: SDH SCALE: 1"= 40' W.O. #17-005 B-199 J:\2017 w.o.s\17005—Pirie Properties — 1243 E. Spruce\Tentative Parcel Map\Tentative Parcel Map 2-14-17.DWG Plotted By: scotth 10/23/17 — 10:16 AM