HomeMy WebLinkAboutPM 2017-11 - Conditions of Approval - 12/22/2017 CITY OF FRESNO
DEVELOPMENT He RESOURCE MANAGEMENT DEPARTMENT
CONDITIONS OF APPROVAL
DECEMBER 22, 2017
VESTING TENTATIVE PARCEL MAP No. 2017-11
"FOR CONDOMINIUM PURPOSES"
LOCATED ON THE SOUTH SIDE OF EAST SPRUCE AVENUE BETWEEN NORTH SPALDING AND NORTH SHARON
AVENUES
NOTICE TO PROJECT APPLICANT
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act (SMA),
Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The
following specific conditions are applicable to this tentative map.
In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees,
dedications, reservations or exactions for this project are subject to protest by the project applicant
at the time of approval or conditional approval of the development or within 90 days after the date of
the imposition of the fees, dedications, reservations or exactions imposed on a development project.
Upon conditional approval of Vesting Tentative Parcel Map No. 2017-11, dated October 23, 2017,
the subdivider may prepare a Parcel Map (Final) in accordance with the approved tentative parcel
map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal
be filed pursuant to Section 15-3314 of the FMC, the application will be scheduled to be heard
before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant
to Section 15-5017 of the FMC.
Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA
apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map,
together with a copy of Section §66436(a)(3)(A)of the SMA,to any public entity or public utility which
has previously acquired a right-of-way easement.
ZONING
1. Comply with the provisions of the State of California Government Code Sections §66410 -
§66499.58 of the SMA and Articles 31 (Land Division) and 35 (Parcel Maps)of Chapter 15
of the FMC.
2. Pursuant to Section 15-3503 of the Fresno Municipal Code and upon approval of Vesting
Tentative Parcel Map No. 2017-11, the subdivider may apply fora waiver of the requirement
for a Parcel Map.
a) A subdivider may request the waiver of the requirement for a Parcel Map, and the waiver
may be granted, in compliance with the Map Act (Section 66428), provided that the
Director shall first find that the proposed subdivision complies with all applicable
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 2
requirements of this Development Code and the Map Act as to area, improvement and
design,floodwater drainage control, appropriate improved public roads,sanitary disposal
facilities, water supply availability, environmental protection, and all other applicable
requirements of this Development Code and the Map Act.
i) Where public improvement requirements or fee payment obligations have been
made (included within the conditions of approval contained herein), such
requirements or obligations must be deemed to have been satisfied prior to
acceptance of an application for a Parcel Map Waiver.
• NOTE: Where public improvement requirements or fee obligations have been
included herein, a certificate of completion or satisfaction of requirements shall
be obtained from the respective department or agency responsible for the
applicable public improvement requirement orfee obligation priorto submittal of
an application for a Parcel Map Waiver. Such certificate shall be submitted to
the Public Works Department, Traffic and Engineering Services Division, Land
Section with an application for waiver of a Parcel Map.
3. Whenever a subdivision, includes area under common ownership(such as is the case within
a common interest development for condominium purposes), the use, maintenance, and
operation thereof shall be administered and governed by an association regulated by
covenants, conditions, and restrictions (CC&R's) pursuant to Chapter 15-Article 40 of the
Fresno Municipal Code and in accordance with the provisions and requirements related to
Common Interest Developments pursuant to the Davis-Stirling Common Interest
Development Act (§§1350-1376 of the California Civil Code).
a) Declarations of Covenants, Conditions and Restrictions/Owners'Association documents
(DCC&R's)which may be prepared for a Condominium Project on the subject property
shall incorporate provisions in accordance with Chapter 15-Article 40 of the Fresno
Municipal Code.
i) Prior to the submittal of documents to obtain a public report for a Condominium
Project and/or prior to the recordation of a Parcel Map and Condominium Plan as
defined in Section 1351(e) of the California Civil Code, whichever is earlier, the
subdivider shall submit to the City for review the Condo Plan, DCC&R's and
association instruments, which shall be prepared compliant with any respective
conditions or requirements identified by special permits/entitlements applicable to the
subject property and/or the tentative parcel map and associated conditions of
approval included herein.
• NOTE: Failure to comply with the terms of required Covenants may result in the
revocation of a Certificate of Occupancy or Special Permit by the City for use of
any Parcel of the properties involved. Accordingly, the City of Fresno shall have
the right to enforce this Statement by any legal or equitable means. For further
information regarding these requirement Contact the Development and
Resource Management Department at (559) 621-8277.
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 3
GENERAL CONDITIONS
4. Contact Israel Trejo, Planner, in the City of Fresno Development and Resource
Management Department at (559) 621-8044 or via email at Israel.Trelo(a-)-fresno.gov for
assignment of addresses to parcels and/or airspaces proposed to be created from a
subdivision/condominium plan of/on the subject property.
• NOTE: It is recommended that at least 6 months prior to the first occupancy,the
Developer shall contact the local United States Postal Service representative to
complete a Mode of Delivery Agreement for New Construction. The Mode of
Delivery Agreement must have a District approval signature to be valid. In
addition to completing the Agreement, the Developer shall provide a final map
(with address details)to the local USPS representative. The Developer shall, at
their own expense, procure, construct and install all mail receptacle facilities for
each location as specified and approved by the USPS.
5. Any existing and/or proposed structure(s) on the site which may be utilized in conjunction
with a condominium project are required to maintain compliance with any applicable
standards of the California Building Code as it relates to wall protection, allowable area, etc.
a) Compliance with the prevailing California Building Code must be demonstrated,
respective to the location of new condominium boundaries which may be proposed to be
described on a condominium plan, prior to recordation of a Condominium Plan. Contact
the Development and Resource Management Department, Building and Safety Services
Division at (559) 621-8200.
• NOTE: In the event the structures do not comply with any applicable standards
of the California Building Code, they must be modified so as to meet the
standard.
b) This project was reviewed by the fire department only for requirements related to water
supply, fire hydrants, and fire apparatus access to the building(s) on site. Review for
compliance with fire and life safety requirements for the building interior and its intended
use are reviewed by both the Fire Department and the Building and Safety Section of
DARM when a submittal for building plan review is made as required by the California
Building Code by the architect or engineer of record for the building.
6. When required, all work and engineered plans for public improvements shall conform to the
2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council
Resolution No. 70-36 and Resolution Nos. 84-361) and any amendments thereto,
hereinafter referred to as the Public Works Standards.
a) Engineered construction plans and estimates for all or part of the required work shall be
required prior to the issuance of Street Work Permits unless otherwise determined by
the City Engineer. The cost for such plan preparation, review and construction
inspection shall be at the subdivider's expense.
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 4
7. The subdivider shall dedicate and construct public easements to facilitate the construction of
public improvements (when applicable) within the limits of the parcel map.
a) All such public easements shall be identified and dedicated with the processing and
recordation of a Parcel Map.
8. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants,
poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction
with the construction of off-site improvement requirements, shall be the responsibility and at
the expense of the subdivider.
9. The subdivider may either construct or install required public improvements,when required;
or, enter into a bonded secured agreement with the City of Fresno providing for the
construction of the required improvements and sufficient security prior to the recordation of a
Parcel Map (final).
10. Whenever covenants or agreements are required, they shall be prepared by the city upon
receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and
agreements must be approved by the City Attorney's Office and shall be recorded with the
final parcel map.
SPECIFIC CONDITIONS
STREETS AND RIGHTS-OF-WAY
11. The subdivider shall comply with all requirements and conditions included within the
attached Department of Public Works, Traffic and Engineering Services Division
memorandum dated November 17, 2017.
PUBLIC UTILITIES
Sanitary Sewer Service
12. The subdivider shall complywith all requirements included within the attached Department of
Public Utilities, Planning and Engineering (Sanitary Sewer)memorandum dated December
04, 2017.
Water Service
13. The subdivider shall complywith all requirements included within the attached Department of
Public Utilities, Water Division memorandum dated December 04, 2017.
Solid Waste Service
14. The subdivider shall complywith all requirements included within the attached Department of
Public Utilities, Planning and Engineering (Solid Waste Management) memorandum dated
August 17, 2017.
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 5
FRESNO METROPOLITAN FLOOD CONTROL
15. The subdivider shall comply with all requirements included within the attached Fresno
Metropolitan Flood Control District memorandum dated November 27, 2017.
DEVELOPMENT FEES AND CHARGES
Pursuant to Government Code§66020(d)(1)each local agency shall provide to the project applicant
a notice in writing at the time of the approval of a project or at the time of the imposition of the fees,
dedications, reservations, or other exactions a statement, and notification that the 90-day approval
period in which the applicant may protest has begun (please see Notice to Project Applicant
contained herein above for further information).
This project is subject to the following development fees and charges:
a. Applicable Drainage and Notice of Review (NOR) Fees as determined by the Fresno
Metropolitan Flood Control District.
(Reference Fresno Metropolitan Flood Control District requirements included herein above and
notes below for further information)
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth)
c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth)
d. Trunk Sewer Charge S.T.E.P.**
Service Area: Cornelia
e. Wastewater Facilities Charge S.T.E.P.**
f. House Branch Sewer Charge [2] N/A
WATER CONNECTION CHARGES FEE RATE
g. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by owner;
fee for service(s) and Meter(s)
established by the Master Fee
Schedule.
h. Frontage Charge [1] $6.50/lineal foot
i. Water Capacity Fee [1] Fee based on meter(s) sizes
specified by owner; fee established
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 6
by the Master Fee Schedule.
CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE
j. Fire Facilities Impact Fee— Citywide [4]
- Commercial Office $303/1000 sq.ft. t
k. Park Facility Impact Fee — Citywide [4]
- Commercial Office N/A
I. Quimby Parkland Dedication Fee [2]
- Commercial Office N/A
m. Citywide Regional Street Impact Fee [3]
- Commercial Office $14,266/adj. acre
n. New Growth Area Major Street Fee [3]
- Commercial Office $35,826/adj. acre
o. Police Facilities Impact Fee — Citywide [4]
- Commercial Office $594/1000 sq.ft. t
p. Traffic Signal Charge [1]
- Commercial Office $550/1000 sq.ft. t
Notes:
On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008—023 requiring the
payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September
20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this
fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building
permits.
The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved
Resolution No.2009—01 requiring the payment of Regional Transportation Mitigation Fee. The effective date
of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to
determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue
building permits.
**Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the
Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater
Division, Environmental Services Section (559-621-5153).
[1] Deferrable through Fee Deferral Covenant.
[2] Due at Final Map.
Conditions of Approval
Vesting Tentative Parcel Map No. 2017-11
December 22, 2017
Page 7
[3] Due at Building Permit.
[4] Due at Certificate of Occupancy.
t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and
conditions of approval from Transportation Planning through the entitlement review process based on Average
Daily Trips of the proposed project. Average Daily Trips to be determined by Traffic Engineering.
City of
C0bcd5\t
DATE: November 17, 2017
TO: Will Tackett
Development and Resource Management Department
FROM: Louise Gilio, Traffic Planning Supervisor
Department of Public Works, Traffic and Engineering Services Division
SUBJECT: Tentative Parcel Map 2017-11, Public Works Conditions of Approval
Location: 1243 East Spruce Avenue
Spruce Partners, LLC/ Harbour &Associates
PUBLIC IMPROVEMENT REQUIREMENTS
The Public Works Department, Traffic and Engineering Services Division, has completed its review and
the following requirements are to be placed on this tentative map as a condition of approval by the
Public Works Department.
The following requirements are based on city records and the accuracy of the existing and proposed
on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to
omission or misrepresentation of information, on which this review process is dependent, will be
imposed whenever such conditions are disclosed.
Construct or install the required improvements, or contact Public Works to enter into a bonded secured
agreement for these improvements. This must be executed prior to perfection of this parcel map.
Contact Jon Bartel at (559) 621-8684.
General Conditions
• Repair all damaged and/or off grade off-site concrete street improvements as determined by the
City of Fresno Public Works Department, Construction Management Division, (559) 621-5600.
• Provide a 12[[ELVLEtO-'AAU UI:[<HIIH[Dgdriveways intersect streets.Street Dedications and / or
Vacations
P EEQF❑ 13-i❑DO"LRAG-iADEP LLP EP ER❑❑❑FMD R:1DFFRP P R NEDFFHWEDR,❑J E%H--ICU'll1HdV1Atl-M
frontage of this map. Contact the Public Works Department, Traffic and Engineering Services Division,
Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop
benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or
public easements.
All existing sidewalks in excess of 2% maximum cross slope must be brought into compliance prior to
acceptance by Public Works. Contact Ken Turner from the Construction Management Division at 621-
5610 for verification of existing sidewalk conditions.
Page 1 of 2
TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-11 SPRUCE 1243 E\PM 2017-11 SPRUCE 1243 E.doc
The construction of any overhead, surface or sub-surface structures and appurtenances in the public
rights-of-way is prohibited unless an encroachment covenant is approved by the City of Fresno Public
Works Department, Traffic and Engineering Services Division. Contact Jason Camit at (559) 621-8681.
Encroachment agreements must be approved prior to final map.
Frontage Improvement Requirements
All improvements shall be constructed in accordance with the Standard Specifications and Standard
Drawings of the City of Fresno, Public Works Department. The performance of any work within the
public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK
PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Traffic
and Engineering Services Division at (559) 621-8670 for detailed information.
Public Streets:
Spruce Avenue: Local Collector
1. Construction Requirements:
a. Construct a driveway approach to Public Works Standards P-2 and P-6. Construct a
concrete pedestrian walkway behind all driveway approaches -OR- identify as existing.
b. Construct concrete sidewalk, curb and gutter and to Public Works Standard P-5. The curb
shall be constructed to a ❑❑❑commercial pattern. Planting of street trees shall conform to
the minimum spacing guidelines as stated in the Standard Specification, Section 26-2.11(C).
-OR- identify as existing.
c. Construct an underground street lighting system to Public Works Standard E-2 within the
limits of this subdivision. Spacing and design shall conform to Public Works Standard E-9. -
OR- Show the existing street light locations on the plans, -AND- that they are constructed
per current City of Fresno Public Works Standards
Traffic Signal Mitigation Impact (TSMI) Fee and Fresno Maior Street Impact (FMSI)Fees: Contact
the Public Works Department, Frank Saburit at (559)621-8797.
Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers
Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200;
www.fresnocog.org. Provide proof of payment or exemption prior to granting final occupancy.
Page 2 of 2
TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-11 SPRUCE 1243 E\PM 2017-11 SPRUCE 1243 E.doc
City of
DEPARTMENT OF PUBLIC UTILITIES
MEMORANDUM
DATE: December 4, 2017
TO: WILL TACKET, Supervising Planner
Department of Development and Resource Management
FROM: KEVIN GRAY, Supervising Engineering Technician
Department of Public Utilities, Planning and Engineering
SUBJECT: SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-11
General
Tentative Parcel Map No. 2017-11 for property located on East Spruce and North
Spalding between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue,
APN: 404-030-56. The property is zoned O/UGM/cz (Office/Urban Growth
Management/Conditions of Zoning.)
Sewer Requirements
The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main
located in East Spruce Avenue. Sanitary sewer facilities are available to provide service
to the site subject to the following requirements:
1. On-site sanitary sewer facilities shall be private.
2. The Project Developer shall contact Wastewater Management
Division/Environmental Services at (559) 621-5100 prior to pulling building
permits regarding conditions of service for special users.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Oversize Area #3.
2. Herndon Trunk Enhancement Fee.
A Nationally Accredited Public Utility Agency
•n.w•�
MEMORANDUM
WILL TACKET, Supervising Planner
Department of Development and Resource Management
December 4, 2017
SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-11
Page 2 of 2
3. Sewer Facility Charges are collected after occupancy on a monthly basis over time
based on metered (water or sewer effluent) usage. The developer may contact the
Department of Public Utilities/Wastewater-Environmental Control at (559) 621-5153
to receive an estimated cost of the Sewer Facility Charges applicable to the project
(based on a constant sewer discharge and loading (Biochemical Oxygen Demand
[BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in
effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide
data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels]
required for calculating the estimated charges.
City of
cQCL'���
IrrIk �: .vejgv
DEPARTMENT OF PUBLIC UTILITIES
MEMORANDUM
DATE: December 4, 2017
TO: WILL TACKETT, Supervising Planner
Department of Development and Resource Management
FROM: ROBERT A. DIAZ, Senior Engineering Technician
Department of Public Utilities— Utilities Planning & Engineering
SUBJECT: WATER REQUIREMENTS FOR PARCEL MAP NO PM-2017-11
General
Tentative Parcel Map No. 2017-11 for property located on East Spruce and North Spalding
between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue, APN: 404-030-56.
The property is zoned O/UGM/cz (Office/Urban Growth Management/Conditions of Zoning.)
Water Requirements
The nearest water main to provide service to the proposed project is an existing 8-inch water
main located in East Spruce Avenue. Water facilities will be available to provide water
service to the site subject to the following requirements:
1. On-site water facilities shall remain private.
The water supply requirements for this project are as follows:
1. The existing property is currently served with a 2-inch water meter and a 1.5-inch
irrigation meter.
a. If the total domestic, commercial, industrial and irrigation water demands for the
applicant's proposed project can be accommodated with the existing 2-inch
water meter and a 1.5-inch irrigation meter, then the applicant shall not be
required to pay a Water Capacity Fee Charge.
b. If the total domestic, commercial, industrial and irrigation water demands for the
applicant's proposed project cannot be accommodated with the 2-inch water
meter and a 1.5-inch irrigation meter, and an additional water service or a larger
water service is required, then the applicant shall be required to pay a Water
Capacity Fee Charge.
i. If an additional water meter is required, the Water Capacity Fee charge
To A Nationally Accredited Public Utility Agency
MEMORANDUM
CHRIS LANG, Planner II
Department of Development and Resource Management
December 4, 2017
Water Requirements for Development Permit Application D-17-161
Page 2 of 2
assessed to the applicant shall be based on the size of additional water
meter. The Water Capacity Fee charges by meter size are published in
the City's Master Fee Schedule.
ii. If a larger water meter is required to accommodate the new, larger water
demands, then the Water Capacity Fee charge shall be calculated by
subtracting the Water Capacity Fee charge associated with the existing
water meter size from the Water Capacity Fee charge associated with
the larger water meter size required for the applicant's project. The
Water Capacity Fee charges by meter size are published in the City's
Master Fee Schedule.
c. The City reserves the right to require an applicant to increase or decrease the
size of a water meter for a project or a property to ensure that the meter is
properly sized to accommodate fire protection requirements, and to allow for
accurate volumetric flow measurements at low- and high-flow conditions.
d. The Water Capacity Fee Charge for any new or expanded service connection
shall be payable prior to the issuance of a building permit at the fee level in
effect on the date such permit is issued.
2. The project applicant shall be required to pay all other water-related fees and charges
in accordance with the City's Master Fee Schedule and Municipal Code.
City of
Cmilin _%ILI a�
DEPARTMENT OF PUBLIC UTILITIES
MEMORANDUM
DATE: August 17, 2017
TO: WILL TACKET, Supervising Planner
Department of Development and Resource Management
FROM: KEVIN GRAY, Supervising Engineering Technician "
Department of Public Utilities, Planning and Engineering
SUBJECT: SOLID WASTE REQUIREMENTS FOR TENTATIVE PA L
MAP NO. 2017-07
General
Tentative Parcel Map No. 2017-11 for property located on East Spruce and North
Spalding between North Millbrook and North Cedar Ave; 1243 East Spruce Avenue,
APN: 404-030-56. The property is zoned O/UGM/cz (Office/Urban Growth
Management/Conditions of Zoning.)
Solid_WasteReguirements
The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main
located in East Spruce Avenue. Sanitary sewer facilities are available to provide service
to the site subject to the following requirements:
1. On-site sanitary sewer facilities shall be private.
2. The Project Developer shall contact Wastewater Management
Division/Environmental Services at (559) 621-5100 prior to pulling building
permits regarding conditions of service for special users.
Sanitary Sewer Fees
Limited routing. Solid Waste comments not requested by Planning.
Does Proiect Affect Your Agency/Jurisdiction
Yes - Project has or will be required to provide a trash enclosure.
A AA,
A Nationally Accredited Public Utility Agency
f W-.
MEMORANDUM
WILL TACKET, Supervising Planner
Department of Development and Resource Management
July 13, 2017
SOLID WASTE REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-07
Page 2of2
Recommended Conditions of Approval
Enclosure shall be built in accordance with current City of Fresno Standards P-33 and
P-34.
Additional Information
Location of enclosure is acceptable.
Storm water Pollution Prevention
Enclosure pads must be designed to prevent contamination of the storm water system.
Measures that may be taken to achieve this include, but are not limited to, using roofs to
divert storm water away from the enclosures, creating grade breaks to properly direct
storm water away while keeping any water that may be in the enclosure from spilling
out, and connecting a drain in the enclosure to the sewer system to collect
contaminated water in cases of spillage, washing, etc.
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.411
NOTICE OF REQUIREMENTS
Page 1 of 4
PUBLIC AGENCY DEVELOPER
WILL TACKETT ALAN PIRIE, SPRUCE PARTNERS,LLC on
DEVELOPMENT SERVICES/PLANNING 1187 N.WILLOW AVE.,SUITE 103
CITY OF FRESNO CLOVIS,CA 93611
2600 FRESNO STREET,ROOM 3043
FRESNO,CA 93721-3604
PROJECT NO: 2017-011
ADDRESS: 1243 E.SPRUCE AVE. t t
APN: 404-030-56 SENT: O� � / Ma
Drainage Area(s) Preliminary Fee(s) Development Review Fee(s) `
Service Charge(s)
CM $0.00 NOR Review $50.00 To be paid prior to release of District comments to Public
Agency and Developer. ic
Grading Plan Review $0.00 Amount to be submitted with first grading plan submittal.
Total Drainage Fee: $0.00 Total Service Charge: $50.00
The proposed development will generate Storm runoff which produces potentially significant environmental impacts and which
■
must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental
Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood
Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the
drainage related CEQA/NEPA impact of the project mitigation requirements.
Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of
Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by
Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first
submittal.The Storni Drain Plan fee shall be paid prior to return/pick up of first submittal.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit
at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/18 based on the site plan 0
submitted to the District on 11/08/17 Contact FMFCD for a revised fee in cases where changes are made in the proposed site
plan which materially alter the proposed impervious area.
1�
Considerations which may affect the fee obligation(s)or the timing or form of fee payment:
a.) Fees related to undeveloped or phased portions of the project may be deferrable.
Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under
b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that
configuration.
c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees.
d.) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee
obligation.
When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation,
e') reimbursement will be made for the excess costs from future fees collected by the District from other development.
Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the
f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or
5%of the refund whichever is less will be retained without fee credit.
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
Approval of this development shall be conditioned upon compliance with these District Requirements.
1. X a. Drainage from the site shall REMAIN AS EXISTING. Mn
b. Grading and drainage patterns shall be as identified on Exhibit No.
_ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and
C. Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities
located within the development or necessitated by any off-site improvements required by the approving agency:
— Developer shall construct facilities as shown on Exhibit No. 1 as
X None required.
3. The following final improvement plans and information shall be submitted to the District for review prior to final
development approval:
Grading Plan 0
Street Plan
Storm Drain Plan
Water&Sewer Plan
Final Map
Drainage Report(to be submitted with tentative map) 0A
Other
X None Required
4. Availability of drainage facilities: M'
X Permanent drainage service is available provided the developer can verify to the satisfaction of the City ML
a' that runoff can be safely conveyed to the Master Plan inlet(s).
— b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service.
C. Permanent drainage service will not be available. The District recommends temporary facilities until
permanent service is available.
d. See Exhibit No.2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate
Maps available to the District,necessitating appropriate floodplain management action.(See attached
Floodplain Policy.)
X Does not appear to be located within a flood prone area.
6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water,
and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site
development may not interfere with the ability to operate and maintain the canal or pipeline.
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with
Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing
one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant on
Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the
discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards.
These requirements apply both to pollutants generated during construction,and to those which may be generated by
operations at the development after construction.
a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July '
1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and
disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part
of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent
and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources
Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate
non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and
complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April,2014
(available at the District Office). A State General Industrial Permit is required for specific types of
industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The
following categories of industries are generally required to secure an industrial permit:manufacturing;
trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for 0
manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of ■
Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and
implement a storm water pollution prevention plan, eliminate non-storm water discharges,conduct routine bL
site inspections,train employees in permit compliance, sample storm water runoff and test it for pollutant INV
indicators,and annually submit a report to the State Board.
c. The proposed development is encouraged to select and implement storm water quality controls 0
recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction !L
Guidelines(available at the District Office)to meet the requirements of the State General Permits,
eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible %4
minimize contact with materials which may contaminate storm water runoff.
10
S. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District 10
within ten days of the date of this Notice of Requirements.
ML
9. The District reserves the right to modify,reduce or add to these requirements, or revise fees,as necessary to
accommodate changes made in the proposed development by the developer or requirements made by other agencies.
10. X See Exhibit No.2 for additional conunents,recommendations an requirement
Debbie Campbell 001 Michael Maxwell
Design Engineer Project Engineer
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
CC:
LORREN SMITH,HARBOUR&ASSOCIATES mn
389 CLOVIS AVE.,SUITE 300
CLOVIS,CA 93612
z
0
■
0
ML
ft4
0
ML
ML
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
OTHER REQUIREMENTS
EXHIBIT NO. 2
In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and
maintained such that material that may generate contaminants will be prevented from contact with
rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm
drain systema
The District encourages, but does not require that roof drains from non-residential development
be constructed such that they are directed onto and through a landscaped grassy swale area to filter
out pollutants from roof runoff.
Development No. TPM 2017-.011
k:\perm its\exhib it2\city-tpm\2017\2017-011,docx(mm)
VESTING
W
TENTATIVE
Z
W
ALLUVIAL AVENUE
w � w
w o W I NO ,
PARCELa
>< EX. COMMERCIAL/OFFICE .:._...:.........
V) PROJECT
E O/UGU/CZ
3� SIT � I
Aa�`� W404-030- 17L0
Ld G -
��
Q _
J S EXISTING
g
TRANSFORMER "'�•' W -W
:.-.�... FOR COMM ERC CONDOMINIUM PURPOSES
w
NTS �- 'ti IN THE CITY OF FRESNO
NORTH SPALDING
S S FRESNO COUNTY, CALIFORNIA
20 17 11
250.03 �-
HERN DON AVENUE ..- ....,:.... .. v ....�.....�.71.... ..w �................ �...,.,:.- I •:. S AVENUE
{ ... .. ,.,....I -10C.,:...:..................
00-00
mom.
S .t,.
�.... I A
10' PUE •
k r \ ,0
\\ 'EX. BUILDING
2 10 PG&E EASEMENT 0011111
I
O -} LEGAL DESCRIPTION
`\,��
I � 23 1 = I PARCEL A OF PARCEL MAP NO. IN THE CITY OF
VICINITY MAPNN�
-� 2002 12,
` .• ACCORDING
PARCEL A
FRESNO, COUNTY OF FRESNO, STATE OF CALIFORNIA,
z 1 s: }::
I \ ( TO THE MAP THEREOF RECORDED IN BOOK 62 PAGE 34 OF
10=111 45,032 s .ft. :....d L,J
a PARCEL MAPS, FRESNO COUNTY RECORDS.
\. , ..
11011
,\ ;.' \ !1!\!\\n!!\0\
\
s ,\` ;,.,..,,,, ,.;�.,,, :a 01
H I Vii: L,J
PARCEL A �:. - ..•�,.t �, N
w \P M 2002-12 ':_;• :. ,,:.. NOTE.
o �•, Q
- _-.... ..:_ : . t:�ti:
� \\_t-;:-�: .♦ \ .:� 1 THERE ARE NO EXISTING SEPTIC TANKS OR LEACHING FIELDS ONSITE.
VACANTo ,. - ,:!_ �� 1... I -No 87079808
:a �� .: =ti.- "�-� �,� \*.�::��. \ 2 10 PG&E EASEMENT RECORDED 6-30-87, DOC
...,...v..„....,.vv.,.,,,.,............_,.... '. ••r•- - U
N DRESS
O/UGU/CZ
co o SITE AD
i + _ • - „' .J• :,�ti, to-"""..i �:
:,,. ,. .:t= .� � .' •.--•. � :.- :_. 1243 EAST SPRUCE AVENUE FRESNO, CA 93720
404-040-54
l� •—
_ -•;l- JEX I STING ZONING
I 4.5' o I 0/UGU/CZ
19 T'hft--q Dl
® ® ® �_ .: PROPOSED ZONING
�. � V
EXISTING TRASH Q 0/UGU/CZ
--
Ld
ENCLOSURE w
'o:
4
EX. PARKING LOT EXISTING LAND USE
'-�.•� � COMMERCIAL OFFICE .-_
OCT 2 30 2017
10
PLANNED LAND USE _ ET SERVICES
❑ ❑ r� }�• COMMERCIAL/OFFICE
CITY OF FRESNO
_ '{.. _J•`>l• �{• .�.i:'^ - � a�fe..1:l rr. :t. .. _�t.•i^Y- f•:, - -1.�.`__�-C: _.}i�-�Iw•'.L.1 n:i:4 e —•Y:: ��;.�_?`.•�-'•.:S.e _.i%' >?)e:•i � 3: I
SOURCE OF WATER
CITY OF FRESNO
.�-
- 1.
�, :•.•:♦�, METHOD OF SEWAGE DISPOSAL
42
CITY OF FRESNO
• 42
:•Y•�: ASSESSOR'S PARCEL NUMBER
,••.• � 404-030-56
-.- S ITE AREA
1.03 AC. GROSS)
10, 1.03 AC. N
- •-1 SOURCE OF DTA
•3•- PARCEL MAP NO. 2002-129
COUNTY OF FRESNO, CA
♦.:.
�'�•- LEGEND
INDICATES STREETS PREVIOUSLY DEDICATED FOR PUBLIC USE
EX. COMMERCIAL/OFFICE VACANT
PROPERTY LINE AND SUBDIVISION BOUNDARY
O/UGU/CZ -`:•• EXISTING O/UGU
-
"-� STREET S - EX. SEWER MAIN TO REMAIN
.•�'}-'•� LIGHT TYP.
.°f 404 0�0 6�
404-030-57 .l:.t - -W- - EX. WATER MAIN TO REMAIN
• - -
SD- - EX. STORM DRAIN MAIN TO REMAIN
t•.-err• /
r _
APM -7
TR DAT E
:Y
•1
-,-•j •t•• ••Iy♦' O C pp1'1 i..:� �19
C y�C���"°A S�S.F,.r}'m.�y a �h R 'l 7 B,j�•Z F;"R .'S �"t tu•y s4i�9.�� !•�a. g•
•• .�.• •b,7'r 4.°4 3 3�t...k ��m i'.`. ?.`e:a ' � 3 d / C'e:�"a'y S D
D ,♦ • V t.
SCALE: 1 40
RO
'::'♦.
-. .. .:
GRAPHIC SCALE
.. .
r �'' •"•' � �Q 0 20 40 80
Fd
� So
\ S
ID TENTATIVE PARC L MA
404-030-34 OWNER&SUBDIVIDER
SPRUCE PARTNERS, LLC
1187 N.WILLOW AVENUE,SUITE 103
404-030-29 CLOVIS,CA.93611
(559)-435-1300
Harbour &Associates
Civil Engineers
389 Clovis Avenue, Suite 300 • Clovis, California 93612
(559)325-7676 • Fax 559 325-7699 •e-mail lorrens@harbour-engineering.com
DATE: 10-16-17 D RAW N BY: SDH SCALE: 1"= 40'
W.O. #17-005 B-199
J:\2017 w.o.s\17005—Pirie Properties — 1243 E. Spruce\Tentative Parcel Map\Tentative Parcel Map 2-14-17.DWG Plotted By: scotth 10/23/17 — 10:16 AM