Loading...
HomeMy WebLinkAboutPM 2017-03 - Cashier Memo - 2/9/2018 N °f MEMORANDUM PUBLIC WORKS DEPARTMENT LAND DIVISION 2600 FRESNO STREET FRESNO,CA 93721 DATE: February 9, 2018 TO: YOLANDA SMITH Public Works Department FROM: JONATHAN BARTEL Public Works Department SUBJECT: SUBMITTAL OF PAYMENT FOR PARCEL MAP NO. 2017-03 THE FOLLOWING ITEMS ARE SUBMITTED FOR PROCESSING: 1 The Balance on the Fee Letter a. Check in the amount of$200.00 (First Bank&Trust No. 23455) 2 Copy of the Fee Letter identifying itemized applicable charges. If you have any questions, please contact me at 621-8684. Thank you r Jonathan Bartel DATE:11/29/17 CK#:23455 TOTAL:$200.00***** BANK:Rich Development Enterprises, (.rich100) PAYEE:City of Fresno(g-fresno2) Job(Prop) Categ(Acct) Invoice-Date Description Amount fresno2(320-fr2) 805000(1598-100) 2017-03-11/29/2017 parcel map 200.00 200.00 Rich Development Enterprises, LLC First Bank&Trust 23455 1000 N.Western Ave.,#200 100 Oceangate,Ste.300 San Pedro,CA 90732 Long Beach,CA 90802 90/3913 U m a **** TWO HUNDRED AND 00/100 DOLLARS ° a PAY TO m E ORDEROF11/29/17 $200 . 00***** ORDER OF 9 9 City of Fresno N 8 v0234SSv ': L22239L311: 9408907450)i' DATE:11/29/17 CK#:23455 TOTAL:$200.00***** BANK:Rich Development Enterprises, (.rich100) PAYEE:City of Fresno(g-fresno2) Job(Prop) Categ(Acct) Invoice-Date Description Amount fresno2(320-fr2) 805000(1598-100) 2017-03-11/29/2017 parcel map 200.00 200.00 FEE LETTER Parcel Map No. 2017-03 AMOUNT DUE NET AMOUNT @ BUILDING EXTENSION DUE PERMIT A. MISCELLANEOUS FEES&CHARGES 1. STREET TREES ®Commercial(5-gallon)Street Trees @ $30.00 per Tree na na (Al) (Al) Street Tree inspection fees will be payable at the time of development of each parcel unless otherwise determined by Public Works. 2. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11420(f)(8) Lum Sum Charge as established by Public Works Director na na 3. IRRIGATION PIPELINE(one-time maintenance fee) ®Lineal Feet @ $5.G(]per LF na na 4. MONUMENT CHECK FEE Lot&Outlots @ $30.00 per Lot $200.00 200.00 (Min$200) TOTAL MISCEI_L NEOUS FEES&CHARGES $200.00 $200.GO EXHIBIT 8 01101101 Printed 11/20/17 4:18:50 PM Page 1 of 4 FEE LETTER Parcel Map No. 2017-03 AMOUNT DUE NET AMOUNT @ BUILDING EXTENSION DUE PERMIT B. IMPACT FEES,CONSTRUCTION CREDITS& FEES TO BE DEFERRED 36660 Gross Acres 28484 Net Acres 36660 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets 17 LUE(non-residential) CR Zoning u m Input'ugm"if within the Urban Growth Management Area or"no" 1. LOCAL DRAINAGE FEES FMFCD Drainage Area Q QOQO Arras per FMFCD @ $0 per Acre na 2. SEWER CONNECTION CHARGES (a)Lateral Sewer Charge Fee obligation satisfied with Building Permit App.No. 17-1066. No Sewer Lateral Charge Due. (b)Oversize Sewer Charge UGM Reimbursement Area Fee obligation satisfied with Building Permit App.No. 17-1066. No Sewer Oversize Charge Due. (c)Trunk Sewer Charge Graatland Trunk Sewer Service Area Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program(STEP)as determined by the Department of Public Utilities,Wastewater Division, Environmental Services Section(559-621-5153) (d)Wastewater Facilities Charge Upon occupancy of the project,the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program(STEP)as determined by the Department of Public Utilities,Wastewater Division, Environmental Services Section(559-621-5153) 3. WATER CONNECTION CHARGES (a)Time&Material Charges("Wet-Tie") Estimate Number Water Job Number Estimated Deposit(FMC 14-111-0 na (b)Service Connection Charges Fees for Water Service Connections and/or Meters due at time of development. Charges based on service sizes determined by the Developer. (c)Frontage Charge Fee obligation satisfied with Building Permit App.No.17-1066. No Frontage Charge Due. (d)Transmission Grid Main Charge UGM Reimbursement Area Fee obligation satisfied with Parcel Map No.2008-13. No Transmission Grid Main Charge Due. EXHIBIT B v11101101 Printed 11120117 4:18:50 PM Page 2 of 4 FEE LETTER Parcel Map No. 2017-03 AMOUNT DUE NET AMOUNT @ BUILDING EXTENSION DUE PERMIT (e)Transmission Grid Main Bond Debt Service Charge Fee obligation satisfied with Building Permit App.No.17-1066. No Transmission Grid Main Bond Debt Service Charge Due. ( UGM Water Supply Fee 201-S Supply Well Service Area Fee obligation satisfied with Parcel Map No.2008-13. No UGM Water Supply Fee Due. ( Well Head Treatment Fee 201 Well Head Treatment Service Area 17 Living Unit Equivalents(non-residential) @ $0.00 per LUE na (h)Recharge Fee 291 Recharge Service Area 17 Living Unit Equivalents(non-residential) @ $0.00 per LUE na (t 1994 Bond Debt Service Fee 201 1994 Bond Debt Service Fee Service Area 17 Living Unit Equivalents(non-residential) @ $0.00 per LUE na 4. CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS (a) FIRE Sq- IMPACT FEE per 1000 Sq p Sq.Ft of building space(non-residential) @ SO.DD Ft $0 00 (64) (b PA) RK FACILITY IMPACT FEE 0 Living Units(residential) @ $0.00 per Unit na (c QUI] MBY PARKLAND DEDICATION FEE 0 Living Units(residential) @ $0.00 per Unit na (d)CITYWIOF_REGIONAL STREET CHARGE 1.4400 Adjusted Gross Acres(Parcel"A") @ $13,469.00 per AG Ac $19,395.36 Less amount satisfied w/PM 2008-13 Credits $19,395.36 Citywide Street Charge So 00 So 0— (e)NEW GROWTH AREA MAJOR STREET CHARGE 1.4400 Adjusted Gross Acres(Parcel"A") @ $37,850.00 per AG Ac $54.504.00 Less estimated Major Street Credits $0 001 Major Street Charge 54,504.00 :a'J Till 54,504.00 (f)POLICE FACILITIES IMPACT FEE per 1000 Sq 0 Sq.Ft.of building space(non-residential) @. $0.00 Ft. $0.00 (84) ( TRg) AFFIC SIGNAL CHARGE 0 ADT's (non-residential) @ $0.00 ADT $0001(134) EXHIBIT B v11/01/01 Printed 11/20117 4:18:51 PM Page 3 of 4 FEE LETTER Parcel Map No. 2017-03 AMOUNT DUE NET AMOUNT @ BUILDING EXTENSION DUE PERMIT (B4) To be determined at time of development t Cirywide Impact Fees due at occupancy(Reso.05-427,428,429) § Cirywide Street Charge and New Growth Area Major Street Carge due at Building Permit(Reso.07-291) Tow.IrnnaCT Fees&Charges $54,504 QO $000 _ _ $54.504.00 Note: EXTENSION total includes net results�r construction credits SUMMARY TOTAL(A) MISCELLANEOUS FEES&CHARGES $200-10 TOTAL(B) IMPACT FEES&CHARGES $0-Do 54,504.00 TOTAL.SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash 200.00 EXHIBIT 8 01101101 Printed 11/20/17 4:18:51 PM Page 4 of 4