HomeMy WebLinkAboutIndustry Bulletin 2025-001 Construction Documents BILLY P. ALCORN FIRE CHIEF Theodore F. Semonious, Fire Deputy Chief/Fire Marshal Fire Prevention and Investigations Division (559) 621-4181  FAX (559) 457-1279 Fresno Fire Department  911 H Street  Fresno, CA 93721-3082 “To protect and put service above all else.” FIRE INDUSTRY BULLETIN 2025-001 SCOPE Fire sprinkler system acceptance/final permit signoff requirements for NFPA 13, 13R, Tenant Improvement projects with sprinkler plans and building fire alarm installations. PURPOSE The purpose of this industry bulletin is to remind applicable stakeholders of the ongoing Fresno Fire Department (FFD or Department) fire sprinkler system and building fire alarm system acceptance/final permit signoff requirements. BACKGROUND As noted in the California Fire Code (CFC), the fire code official has the authority to formulate policies they deem necessary based upon local conditions related to fire sprinkler system and building fire alarm acceptance/final permit signoff requirements. To minimize some of the most common errors found during fire sprinkler and building fire alarm final inspections/system acceptance inspections, in January 2020, FFD began to require installing contractors to provide a completed and signed NFPA 13 Contractor's Material and Test Certificate for Aboveground Piping and NFPA 72 Record of Completion at final inspection/system acceptance permit signoffs. By requiring these forms to be completed and presented to FFD staff at the beginning of a system acceptance/final permit signoff inspection, it was, and remains, the Department’s intent to help installing contractors reduce the number of reinspections that have to be completed for errors or omissions noted during a final inspection. Completion of both forms is also required as noted in the applicable NFPA standards. INFORMATION All firms shall continue to prepare and provide a completed and signed NFPA 13 Contractor's Material and Test Certificate for Aboveground Piping and NFPA 72 Record of Completion as noted above when requesting system acceptance/final permit signoff. Fire Industry Bulletin 2025-001 May 7, 2025 Page 2 These documents are required as previously noted in FFD Fire Industry Bulletin 2022- 001. Required documents shall be provided to the Department at the beginning of fire sprinkler and building fire alarm final inspection/system acceptance, regardless of the date the permit was issued. NOTE This bulletin is effective May 7, 2025, and shall remain in effect unless revoked. REFERENCES Fire Industry Bulletin 2020-001 Fire Industry Bulletin 2022-001