Loading...
HomeMy WebLinkAbout316.006 - Advance an Apartment Lay (Line 1) TRAINING AND EQUIPMENT MANUAL INDIVIDUAL PERFORMANCE EVOLUTIONS(IPEs) 316.006 ADVANCE AN APARTMENT LAY (LINE 1) EFFECTIVE: JANUARY 2010 Current Revision Date: 09/10/21 Next Revision Date: 09/10/23 Author’s Name/Rank: John Ross, Fire Captain Review Level: 1 Administrative Support: Crystal Giannopulos, Senior Administrative Clerk ADA PURPOSE Proper deployments of attack lines are essential for effective fire ground operations. APPLICATION Individual performance evolutions (IPE) are used to document skill level performance. OPERATIONAL POLICY This section intentionally left blank. OPERATIONAL GUIDELINE Active members should perform IPE without any failures in task steps. PROCESS 1. Equipment Needed: Engine with standard 2-1/2 inch hose line with a preconnected 1-3/4-inch bundle (Line 1), full personal protective equipment w/Self-contained Breathing Apparatus. 2. Task: Deploy and advance the 2-1/2 inch hose line with a pre-connected 1-3/4inch bundle to a designated point of 200 feet. Section 316.002 Page 1 of 4 3. Performance Outcome: The candidate, while operating on a simulated fire ground, should be able to deploy and advance a 2-1/2 inch hose line with a preconnected 1- 3/4-inch bundle to a designated mark. 4. Candidate Directive: “Deploy the Apartment Lay to the designated point of attack and prepare for an interior attack. Do you have any questions?” 5. Critical Errors: If the member performs any of the following errors, the evolution will be terminated, as it would be a failure of the current test attempt. • Perform an unsafe act which could result in injury to himself/herself or the public. • Perform an act which did or could have damaged equipment. INFORMATION This section intentionally left blank. DEFINITIONS This section intentionally left blank. CROSS REFERENCES National Fire Protection Association 1001, Standard for Fire Fighter Professional Qualifications (2019) State Fire Training Firefighter 1 Skill 3-10d: Extend a Hose Line Fresno Fire Department Hose Practices Guide Essentials of Fire Fighting 7th edition: Ch. 13 Hose Operations and Hose Streams Section 316.006 Page 2 of 4 TRAINING AND EQUIPMENT MANUAL 316 INDIVIDUAL PERFORMANCE EVOLUTIONS(IPEs) 316.006 ADVANCE AN APARTMENT LAY EFFECTIVE: JANUARY 2010 Name: ________________________ ID #: ________________________ Date: ________________________ No. Task Steps First Test Retest Deploy and Advance P *F P *F 1. Grasp loop above wye and remove hose bundle and place on right shoulder 2. Turn towards direction of travel and advance to the point of attack, maintaining control of the hose bundle 3. Identify and navigate any hazards or obstacles ensuring proper hose deployment 4. Place hose bundle at the point of attack 5. Flake supply hose to remove any excessive kinks 6. Confirm the discharge outlet(s) from the wye are in the closed position 7. Call for water 8. Remove straps and expand bundle outward from center 9. Secure nozzle and slowly open the appropriate outlet on the wye to charge the 1-3/4 inch line. END TIME: __________ Critical Errors P *F P *F 1. Perform an unsafe act that could result in injury to himself/herself or the public. 2. Perform an act which did or could have damaged equipment. Section 316.006 Page 3 of 4 *10-minute rest period minimum before retest attempt Overall Grade: Pass Fail Start Time: End Time: Evaluator #1 Signature Employee ID # Date Evaluator #1 Signature Employee ID # Date Candidate Signature Date Retest Evaluator #1 Signature Employee ID # Date Retest Evaluator #1 Signature Employee ID # Date Candidate Signature Date Evaluator Comments: Candidate Comments: Section 316.006 Page 4 of 4