Loading...
HomeMy WebLinkAbout316.002 - Deploy a Pre-Connected Hose Line Effective Date: January 2010 Carl Delap, Captain Current Revision Date: 11/25/2025 Section 316.002 Next Revision (1) Date: 11/25/2027 Page 1 of 4 300 Training and Equipment Manual Individual Performance Evolutions (IPE) SECTION 316.002 DEPLOY A PRE-CONNECTED HOSE LINE PURPOSE Proper deployments of attack lines are essential for effective fire ground operations. APPLICATION Individual performance evolutions (IPE) are used to document skill level performance. OPERATIONAL POLICY This section intentionally left blank. OPERATIONAL GUIDELINE Active members will perform IPE without any failures in task steps. PROCESS 1. Equipment Needed: Engine with standard pre-connected attack line and personal protective equipment (PPE) with Self-Contained Breathing Apparatus (SCBA). 2. Task: Deploy and advance the pre-connected hose to a designated point and reload the hose. 3. Performance Outcome: The candidate, while operating on a simulated fire ground, will be able to deploy and advance a pre-connected attack line to a designated mark and reload the hose. Fresno City Fire Department Effective Date: January 2010 Carl Delap, Captain Current Revision Date: 11/25/2025 Section 316.002 Next Revision (1) Date: 11/25/2027 Page 2 of 4 4. Candidate Directive: “Deploy the pre-connected attack line to the designated point of attack. Once deployed, you will reload the hose. Do you have any questions?” 5. Critical Errors: If the candidate performs any of the following errors, the evolution will be terminated, and the candidate will fail the current test attempt. • Perform an unsafe act which could result in injury to himself / herself or the public. • Perform an act which did or could have damaged equipment. INFORMATION This section intentionally left blank. DEFINITIONS This section intentionally left blank. CROSS-REFERENCES National Fire Protection Association 1010, Firefighter 1 (2024), JPR 6.3.10 (2019) State Fire Training Firefighter 1 Skill 3-11d: Load, Deploy, and Advance an Attack Line Fresno Fire Department Hose Practices Guide: Ch. 1, 4, 6 Essentials of Fire Fighting FF1 8th Edition: Ch. 13 Hose Operations and Hose Streams INDIVIDUAL PERFORMANCE EVOLUTIONS (IPEs) SECTION 316.002 DEPLOY A PRE-CONNECTED HOSE LINE No. Task Steps First Test Retest Deploy and Advance P *F P *F 1. Place the proper arm through the loops and grasp the nozzle with your hand. 2. Face the direction of travel and remove the hose from the bed. 3. Ensure all hose is removed from the bed. 4. Advance the nozzle to the point of attack, maintaining control of the nozzle, and releasing the appropriate loops as needed. 5. Identify and navigate any hazards or obstacles ensuring proper hose deployment. 6. Place nozzle and enough hose to initiate an interior hose advancement at the point of attack. 7. Flake hose to remove any excessive kinks. 8. Control the nozzle and call for water. END TIME: __________ Load P *F P *F 9. Remove the nozzle and drain the water from the hose. 10. Began to flat load with the first row to the rear of the bed. 11. Place deployment loops on rows 3 (front) and 8 (rear). 12. Complete the flat load correctly with the nozzle ready for deployment. Critical Errors P *F P *F 1. Perform an unsafe act that could result in injury to himself / herself or the public. 2. Perform an act which did or could have damaged equipment. *10-minute rest period minimum before retest attempt Name: ________________________________ ID #: ________________________________ Date: ________________________________ Overall Grade: Pass Fail Start Time: End Time: Evaluator #1 Signature Employee ID # Date Evaluator #1 Signature Employee ID # Date Candidate Signature Date Retest Evaluator #1 Signature Employee ID # Date Retest Evaluator #1 Signature Employee ID # Date Candidate Signature Date Evaluator Comments: Candidate Comments: