HomeMy WebLinkAbout106.032 - FD-16, Annual Pump TestEffective Date: September 2008 Theodore Semonious
Current Revision Date: 5/6/2022 Section 106.032
Next Revision (2) Date: 5/6/2025 Page 1 of 3
100 Administrative Manual
SECTION 106.032 (ANNUAL PUMP TEST)
PURPOSE
This policy has been developed to provide documentation of the annual or post repair
pump test results for Fresno Fire Department (FFD or Department) apparatus.
APPLICATION
The form contained in this policy is to be used by personnel conducting pump tests on
fire apparatus.
OPERATIONAL POLICY
This section intentionally left blank.
OPERATIONAL GUIDELINE
The Shop Supervisor, or his assigned representative, is to complete the FD-16. A
blank FD-16 may be used as a work sheet to enter data as the test progresses. Notes
pertinent to the apparatus may be made on the work sheet.
Note: Entries are made at four-minute intervals for the 150 lbs. capacity
test. Entries for the 200 lbs. and 250 lbs. capacity tests are at
five-minute intervals.
Formal test report forms are to be completed and saved on a network drive. Requests
for the final reports may be requested by contacting a Shop Supervisor or the Public
Safety Fleet Manager.
A copy of the report is to be routed to the appropriate station after all tests are
completed.
PROCESS
This section intentionally left blank.
Fresno City Fire Department
Effective Date: September 2008 Theodore Semonious
Current Revision Date: 5/6/2022 Section 106.032
Next Revision (2) Date: 5/6/2025 Page 2 of 3
INFORMATION
This section intentionally left blank.
DEFINITIONS
This section intentionally left blank.
CROSS-REFERENCES
No cross-references identified.
EXAMPLE Section 106.032
Page 3 of 3
Fresno City Fire Department
Annual Pump Test
Date: Apparatus#: Make: Capacity Gallons
Air Temp: Gear Ration: Lift @: Lift Test Seconds
Operator: Tested By: Dry Vacuum Test:
Capacity Test – 150 psi. for 20 minutes
Time Pump
Pressure
Nozzle
Pressure
Vacuum Pump RPM Engine RPM Oil Pressure Coolant Temp Discharge GP Hose Lay Remarks
12:10 PM
12:14 PM
12:18 PM
12:22 PM
12:26 PM
Total
Average
Pressure Relief Valve Test @ 90 psi
Overload Test @ 165 psi Pass
200 psi test (70%) for 10 Minutes
12:30 PM
12:50 PM
12:55 PM
Totals:
Average:
250 psi Test (50%) for 10 Minutes
12:45 PM
12:50 PM
12:55 PM
Total
Average