Loading...
HomeMy WebLinkAbout106.032 - FD-16, Annual Pump TestEffective Date: September 2008 Theodore Semonious Current Revision Date: 5/6/2022 Section 106.032 Next Revision (2) Date: 5/6/2025 Page 1 of 3 100 Administrative Manual SECTION 106.032 (ANNUAL PUMP TEST) PURPOSE This policy has been developed to provide documentation of the annual or post repair pump test results for Fresno Fire Department (FFD or Department) apparatus. APPLICATION The form contained in this policy is to be used by personnel conducting pump tests on fire apparatus. OPERATIONAL POLICY This section intentionally left blank. OPERATIONAL GUIDELINE The Shop Supervisor, or his assigned representative, is to complete the FD-16. A blank FD-16 may be used as a work sheet to enter data as the test progresses. Notes pertinent to the apparatus may be made on the work sheet. Note: Entries are made at four-minute intervals for the 150 lbs. capacity test. Entries for the 200 lbs. and 250 lbs. capacity tests are at five-minute intervals. Formal test report forms are to be completed and saved on a network drive. Requests for the final reports may be requested by contacting a Shop Supervisor or the Public Safety Fleet Manager. A copy of the report is to be routed to the appropriate station after all tests are completed. PROCESS This section intentionally left blank. Fresno City Fire Department Effective Date: September 2008 Theodore Semonious Current Revision Date: 5/6/2022 Section 106.032 Next Revision (2) Date: 5/6/2025 Page 2 of 3 INFORMATION This section intentionally left blank. DEFINITIONS This section intentionally left blank. CROSS-REFERENCES No cross-references identified. EXAMPLE Section 106.032 Page 3 of 3 Fresno City Fire Department Annual Pump Test Date: Apparatus#: Make: Capacity Gallons Air Temp: Gear Ration: Lift @: Lift Test Seconds Operator: Tested By: Dry Vacuum Test: Capacity Test – 150 psi. for 20 minutes Time Pump Pressure Nozzle Pressure Vacuum Pump RPM Engine RPM Oil Pressure Coolant Temp Discharge GP Hose Lay Remarks 12:10 PM 12:14 PM 12:18 PM 12:22 PM 12:26 PM Total Average Pressure Relief Valve Test @ 90 psi Overload Test @ 165 psi Pass 200 psi test (70%) for 10 Minutes 12:30 PM 12:50 PM 12:55 PM Totals: Average: 250 psi Test (50%) for 10 Minutes 12:45 PM 12:50 PM 12:55 PM Total Average