Loading...
HomeMy WebLinkAboutPM 2017-09 - Conditions of Approval - 11/22/2017 CITY OF FRESNO DEVELOPMENT & RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL NOVEMBER 22, 2017 VESTING TENTATIVE PARCEL MAP No. 2017-09 "FOR CONDOMINIUM PURPOSES" LOCATED AT THE TERMINUS OF NORTH BENDEL LANE;SOUTH OF WEST SANTA ANA AVENUE NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act(SMA), Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on a development project. Upon conditional approval of Vesting Tentative Parcel Map No. 2017-09, dated October 12, 2017, the subdivider may prepare a Parcel Map (Final) in accordance with the approved tentative parcel map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 15-3314 of the FMC, the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 15-5017 of the FMC. Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map, together with a copy of Section §66436(a)(3)(A)of the SMA,to any public entity or public utility which has previously acquired a right-of-way easement. ZONING 1. Comply with the provisions of the State of California Government Code Sections §66410 - §66499.58 of the SMA and Articles 31 (Land Division) and 35 (Parcel Maps) of Chapter 15 of the FMC. 2. Pursuant to Section 15-3503 of the Fresno Municipal Code and upon approval of Vesting Tentative Parcel Map No. 2017-09,the subdivider may apply for a waiver of the requirement for a Parcel Map. a) A subdivider may request the waiver of the requirement for a Parcel Map, and the waiver may be granted, in compliance with the Map Act (Section 66428), provided that the Director shall first find that the proposed subdivision complies with all applicable requirements of this Development Code and the Map Act as to area, improvement and Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 2 design,floodwater drainage control, appropriate improved public roads,sanitary disposal facilities, water supply availability, environmental protection, and all other applicable requirements of this Development Code and the Map Act. i) Where public improvement requirements or fee payment obligations have been made (included within the conditions of approval contained herein), such requirements or obligations must be deemed to have been satisfied prior to acceptance of an application for a Parcel Map Waiver. NOTE: Where public improvement requirements or fee obligations have been included herein, a certificate of completion or satisfaction of requirements shall be obtained from the respective department or agency responsible for the applicable public improvement requirement or fee obligation prior to submittal of an application for a Parcel Map Waiver. Such certificate shall be submitted to the Public Works Department, Traffic and Engineering Services Division, Land Section with an application for waiver of a Parcel Map. 3. Whenever a subdivision, includes area under common ownership(such as is the case within a common interest development for condominium purposes), the use, maintenance, and operation thereof shall be administered and governed by an association regulated by covenants, conditions, and restrictions (CC&R's) pursuant to Chapter 15-Article 40 of the Fresno Municipal Code and in accordance with the provisions and requirements related to Common Interest Developments pursuant to the Davis-Stirling Common Interest Development Act (§§1350-1376 of the California Civil Code). a) Declarations of Covenants,Conditions and Restrictions/Owners'Association documents (DCC&R's) which may be prepared for a Condominium Project on the subject property shall incorporate provisions in accordance with Chapter 15-Article 40 of the Fresno Municipal Code. i) Prior to the submittal of documents to obtain a public report for a Condominium Project and/or prior to the recordation of a Parcel Map and Condominium Plan as defined in Section 1351(e) of the California Civil Code, whichever is earlier, the subdivider shall submit to the City for review the Condo Plan, DCC&R's and association instruments, which shall be prepared compliant with any respective conditions or requirements identified by special permits/entitlements applicable to the subject property and/or the tentative parcel map and associated conditions of approval included herein. • NOTE: Failure to comply with the terms of required Covenants may result in the revocation of a Certificate of Occupancy or Special Permit by the City for use of any Parcel of the properties involved.Accordingly, the City of Fresno shall have the right to enforce this Statement by any legal or equitable means. For further information regarding these requirement Contact the Development and Resource Management Department at (559) 621-8277. Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 3 GENERAL CONDITIONS 4. Contact Israel Trejo, Planner, in the City of Fresno Development and Resource Management Department at (559) 621-8044 or via email at Israel.Tre o fresh❑ gov for assignment of addresses to parcels and/or airspaces proposed to be created from a subdivision/condominium plan of/on the subject property. • NOTE: It is recommended that at least 6 months prior to the first occupancy,the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details)to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. 5. Any existing and/or proposed structure(s) on the site which may be utilized in conjunction with a condominium project are required to maintain compliance with any applicable standards of the California Building Code as it relates to wall protection, allowable area,etc. a) Compliance with the prevailing California Building Code must be demonstrated, respective to the location of new condominium boundaries which may be proposed to be described on a condominium plan, prior to recordation of a Condominium Plan. Contact the Development and Resource Management Department, Building and Safety Services Division at (559) 621-8200. • NOTE: In the event the structures do not comply with any applicable standards of the California Building Code, they must be modified so as to meet the standard. b) This project was reviewed by the fire department only for requirements related to water supply, fire hydrants, and fire apparatus access to the building(s) on site. Review for compliance with fire and life safety requirements for the building interior and its intended use are reviewed by both the Fire Department and the Building and Safety Section of DARM when a submittal for building plan review is made as required by the California Building Code by the architect or engineer of record for the building. 6. When required, all work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution No. 70-36 and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the Public Works Standards. a) Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 4 7. The subdivider shall dedicate and construct public easements to facilitate the construction of public improvements (when applicable) within the limits of the parcel map. a) All such public easements shall be identified and dedicated with the processing and recordation of a Parcel Map. 8. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants, poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction with the construction of off-site improvement requirements, shall be the responsibility and at the expense of the subdivider. 9. The subdivider may either construct or install required public improvements,when required; or, enter into a bonded secured agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the recordation of a Parcel Map (final). 10. Whenever covenants or agreements are required, they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and agreements must be approved by the City Attorney's Office and shall be recorded with the final parcel map. SPECIFIC CONDITIONS STREETS AND RIGHTS-OF-WAY 11. The subdivider shall comply with all requirements and conditions included within the attached Department of Public Works, Traffic and Engineering Services Division memorandum dated November 06, 2017. 12. Pursuant to Article 38 of Chapter 15 of the FMC, the subdivider shall provide for the installation of street trees, or payments in lieu of immediate installation of street trees and payment of street tree fees applying to the subdivision or the division of land as designated in the Master Fee Schedule. i) Comply with all requirements included within the attached memorandum from the Department of Public Works, Parks Supervisor dated October 31, 2017. • NOTE: Pursuant to the above referenced memorandum, street tree requirements for this project have been waived. PUBLIC UTILITIES Sanitary Sewer Service 13. The subdivider shall complywith all requirements included within the attached Department of Public Utilities, Planning and Engineering (Sanitary Sewer) memorandum dated November 03, 2017. Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 5 Water Service 14. The subdivider shall comply with all requirements included within the attached Department of Public Utilities, Water Division memorandum dated November 07, 2017. Solid Waste Service 15. The subdivider shall comply with all requirements included within the attached Department of Public Utilities, Planning and Engineering (Solid Waste Management) memorandum dated November 03, 2017. FRESNO IRRIGATION DISTRICT 16. The subdivider shall comply with all requirements included within the attached Fresno Irrigation District memorandum dated October 30, 2017. FRESNO METROPOLITAN FLOOD CONTROL 17. The subdivider shall comply with all requirements included within the attached Fresno Metropolitan Flood Control District memorandum dated November 08, 2017. COUNTY OF FRESNO— ENVIRONMENTAL HEALTH 18. The subdivider shall comply with all requirements included within the attached County of Fresno memorandum dated October 16, 2017; with the following exception: a) The proposed project is for industrial condominium purposes (vs. residential). An acoustical analysis will only be required for future offices or other noise sensitive uses, which will require such evaluation to demonstrate that interior noise levels meet acceptable City of Fresno thresholds prior to issuance of building permits. DEVELOPMENT FEES AND CHARGES Pursuant to Government Code§66020(d)(1)each local agency shall provide to the project applicant a notice in writing at the time of the approval of a project or at the time of the imposition of the fees, dedications, reservations, or other exactions a statement, and notification that the 90-day approval period in which the applicant may protest has begun (please see Notice to Project Applicant contained herein above for further information). This project is subject to the following development fees and charges: a. Applicable Drainage and Notice of Review (NOR) Fees as determined by the Fresno Metropolitan Flood Control District. (Reference Fresno Metropolitan Flood Control District requirements included herein above and notes below for further information) Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 6 SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth) c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charge S.T.E.P.** Service Area: Cornelia e. Wastewater Facilities Charge S.T.E.P.** f. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE g. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. h. Frontage Charge [1] $6.50/lineal foot i. Water Capacity Fee [1] Fee based on meter(s) sizes specified by owner; fee established by the Master Fee Schedule. CITYWIDE DEVELOPMENT IMPACT FEE FEE RATE j. Fire Facilities Impact Fee—Citywide [4] - Industrial $152.00/1000 sq.ft. t k. Park Facility Impact Fee—Citywide [4] - Industrial N/A I. Quimby Parkland Dedication Fee [2] - Industrial N/A m. Citywide Regional Street Impact Fee [3] - Light Industrial $4,056.00/adj. acre n. New Growth Area Major Street Fee [3] - Light Industrial N/A o. Police Facilities Impact Fee—Citywide [4] - Industrial $297.00/1000 sq.ft. t Conditions of Approval Vesting Tentative Parcel Map No. 2017-09 November 22, 2017 Page 7 p. Traffic Signal Charge [1] - Light Industrial $348.00/1000 sq.ft. t Notes: On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008—023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No.2009—01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. **Upon occupancy of the project,the subdivider shall pay the appropriate sewerfacility charge pursuantto the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. Average Daily Trips to be determined by Traffic Engineering. City of 1e1MC■n■u�\II/ rnc� :.._ DATE: November 6, 2017 TO: Will Tackett Development and Resource Management Department FROM: Louise Gilio, Traffic Planning Supervisor Department of Public Works, Traffic and Engineering Services Division SUBJECT: Tentative Parcel Map 2017-09, Public Works Conditions of Approval Location: 4475 North Bendel Lane Ken Boyd / Lars Andersen &Associates, Inc. Provide the following information prior to the acceptance of the final map submittal. This can result in additional conditions of approval. 1. Verify that the parcel to the east will have a frontage large enough for an approach. 2. Will this be submitted for site plan review? (D-17-110 or other) 3. Should the border be revised? 4. Verify the description of the drainage easement. 5. The paperwork states that this is a vacant parcel. There are existing buildings. 6. Provide the previous entitlement numbers for reference. D-17-110? PUBLIC IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed prior to perfection of this parcel map. Contact Jon Bartel at(559) 621-8684. General Conditions • Submit street construction plans, to the Public Works Department, Traffic and Engineering Services Division for review and approval, prior to the final map: • Additional offsite improvements will be required at the time of future site plan review. • Repair all damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5600. Page 1 of 3 TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-09 BENDEL 4475 N\PM 2017-09 Bendel 4475 N.doc • All existing driveway approaches which no longer provide access to approved vehicle parking areas shall be removed unless otherwise approved by the City Engineer. Such areas shall be reconstructed with curb, gutter, and sidewalk to match existing adjacent street improvements. This work shall be completed and accepted before a Permit of Occupancy is issued or the building is occupied per Fresno Municipal Code (FMC) 13-211. • Provide a 30' visibility triangle at all street intersections and a 10' visibility triangle where all driveways and /or alleys intersect streets. • Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 15-4114. Street Dedications Identify pedestrian paths of travel along public sidewalks: Provide a minimum of 4' clear to accommodate access along the entire street frontage of this map. Pedestrian easements may be required to accomplish this. Contact the Public Works Department, Traffic and Engineering Services Division, Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or public easements. All existing sidewalks in excess of 2% maximum cross slope must be brought into compliance prior to acceptance by Public Works. Contact Ken Turner from the Construction Management Division at 621- 5610 for verification of existing sidewalk conditions. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment covenant is approved by the City of Fresno Public Works Department, Traffic and Engineering Services Division. Contact Jason Camit at (559) 621-8681. Encroachment agreements must be approved REk to final map. Frontage Improvement Requirements All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Traffic and Engineering Services Division at (559) 621-8670 for detailed information. Public Streets: Bendel Lane: Local Industrial 1. Dedication Requirements: a. If not existing, dedicate 2' of property for pedestrian purposes at all proposed approaches Will this be accomplished by separate instrument? (reference D-17-110) 2. Construction Requirements: a. Construct a driveway approach to Public Works Standards P-2 and P-6. Construct a concrete pedestrian walkway behind all driveway approaches. (reference D-17-110) b. Construct concrete sidewalk, curb and gutter and to Public Works Standard P-5. The curb shall be constructed to a 7' commercial pattern. Page 2 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-09 BENDEL 4475 N\PM 2017-09 Bendel 4475 N.doc c. Construct an underground street lighting system to Public Works Standard E-2 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-9. OR- Show the existing street light locations on the plans, -AND- that they are constructed per current City of Fresno Public Works Standards Traffic Signal Mitigation Impact (TSMI) Fee: This project shall pay all applicable TSMI Fees, at the time of Parcel Map approval based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. Contact the Public Works Department, Frank Saburit at (559)621-8797. Fresno Marcor Street impact (FMSI)Fees: Contact the Public Works Department, Frank Saburit at (559)621-8797. Re ional Transportation Miti ation Fee RTMF : Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocog.org. Provide proof of payment or exemption REj2E to granting final occupancy. Page 3 of 3 TATraOlc Planning\ CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-09 BENDEL 4475 N\PM 2017-09 Bendel 4475 N.doc DEPARTMENT OF PUBLIC WORKS TO: Will Tackett, Supervising Planner Development and Resource Management Department FROM: Hilary Kimber, Parks Supervisor II (559.621.1345) Public Works, Median Island Maintenance DATE: October 31, 2017 SUBJECT: Parcel Map 2017-09 4475 North Bendel Lane (APN: 510-080-11; 12) The Department of Public Works offers the following comments regarding the proposed project located on South Bendel Lane between North Golden State Boulevard and West Santa Ana Avenue: GENERAL REQUIREMENTS 1. The Developer is required to provide street trees on all public street frontages per Fresno Municipal Code. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage. Irrigation is required for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB1881. 2. There are approximately 90 lineal feet of street frontage resulting the requirement of two (2) street trees. 3. Due to the 10' Public Utility easement, the 15' Fresno Metropolitan easement and the 10' drainage easement, no street trees are required for this project. Public Works waives the street tree requirement. City of FRESHCO DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: November 3, 2017 TO: WILL TACKETT, Supervising Planner Department of Development and Resource Management FROM: KEVIN GRAY, Supervising Engineering Technician Department of Public Utilities, Planning and Enginecri SUBJECT: SEWER REQUIREMENTS FOR TENTATIVErPARCEL MAP No. 2017-09 General Tentative Parcel Map No. 2017-09 for property located on South Bendel Lane between North Golden State Blvd and West Santa Ana Avenue; 4475 North Bendel Lane, APN: 510-080-11/510-080-12. The property is zoned IL (Light Industrial) Sewer Requirements The nearest sanitary sewer main to serve the proposed project is a 6-inch sewer main located in North Bendel Lane. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. On-site sanitary sewer facilities shall be private. 2. The Project Developer shall contact Wastewater Management Division/Environmental Services at (559) 621-5100 prior to pulling building permits regarding conditions of service for special users. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Facility Charge (Non-Residential) 2. Upon connection of this Project to the City Sewer System the owner shall be subject to payment of Sewer Facility charges per Fresno Municipal Code Sections 6-304 and 6-305. Sewer Facility Charges consist of two components, a Wastewater Facilities Charge and Trunk Sewer Charge where applicable. A Nationally Accredited Public Utility Agency ,V.t MEMORANDUM WILL TACKETT, Supervising Planner Department of Development and Resource Management November 3, 2017 SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP No. 2017-09 Page 2 of 2 3. Sewer Facility Charges are collected after occupancy on a monthly basis over time based on metered (water or sewer effluent) usage. The developer may contact the Department of Public Utilities/Wastewater-Environmental Control at (559) 621-5153 to receive an estimated cost of the Sewer Facility Charges applicable to the project (based on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. ;,�y ri CHIC %I►A_ DEPARTMENT OF PUBLIC UTILITIES — UTILITIES PLANNING & ENGINEERING MEMORANDUM DATE: November 7, 2017 TO: WILL TACKETT, Supervising Planner Department of Development and Resource Management THROUGH: THOMAS C. ESQUEDA, Director Department of Public Utilities FROM: ROBERT A. DIAZ, Senior Engineering Technician Department of Public Utilities — Utilities Planning & Engineering SUBJECT: Water Requirements for Vesting Parcel Map 2017-09 General Tentative Parcel Map No. 2017-09 for property located on South Bendel Lane between North Golden State Blvd and West Santa Ana Avenue; 4475 North Bendel Lane, APN: 510-080- 11/510-080-12. The property is zoned IL (Light Industrial) Water Service The nearest water main to serve the proposed project is an 8-inch main located in North Bendel Lane. Water facilities will be available to provide water service to the site subject to the following requirements: 1. On-site water facilities shall be private. 2. Installation of water service(s) & meter box(es) shall be required. 3. Destruct any existing on-site well in compliance with the State of California Well Standards, Bulletin 74-81 and 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. The water supply requirements for this project are as follows: 1. The existing property is currently served with four 1.5-inch water meters, one 1.5-inch irrigation meter and one 8-inch fire service. a. If the total domestic, commercial, industrial and irrigation water demands for the applicant's proposed project can be accommodated with four 1.5-inch water meters, one 1.5-inch irrigation meter and one 8-inch fire service, then the A Nationally Accredited Public Utility Agency MEMORANDUM WILL TACKETT, Supervising Planner Department of Development and Resource Management November 7, 2017 Water Requirements for Vesting Parcel Map 2017-09 Page 2 of 2 applicant shall not be required to pay a Water Capacity Fee Charge. b. If the total domestic, commercial, industrial and irrigation water demands for the applicant's proposed project cannot be accommodated with the with four 1.5- inch water meters, one 1.5-inch irrigation meter and one 8-inch fire service, and an additional water meter or a larger water meter is required, then the applicant shall be required to pay a Water Capacity Fee Charge. i. If an additional water meter is required, the Water Capacity Fee charge assessed to the applicant shall be based on the size of additional water meter. The Water Capacity Fee charges by meter size are published in the City's Master Fee Schedule. ii. If a larger water meter is required to accommodate the new, larger water demands, then the Water Capacity Fee charge shall be calculated by subtracting the Water Capacity Fee charge associated with the existing water meter size from the Water Capacity Fee charge associated with the larger water meter size required for the applicant's project. The Water Capacity Fee charges by meter size are published in the City's Master Fee Schedule. c. The City reserves the right to require an applicant to increase or decrease the size of a water meter for a project or a property to ensure that the meter is properly sized to accommodate fire protection requirements, and to allow for accurate volumetric flow measurements at low- and high-flow conditions. d. The Water Capacity Fee Charge for any new or expanded service connection shall be payable prior to the issuance of a building permit at the fee level in effect on the date such permit is issued. 1. The project applicant shall be required to pay all other water-related fees and charges in accordance with the City's Master Fee Schedule and Municipal Code. City of rRESN `� DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: November 3, 2017 TO: WILL TACKETT, Supervising Planner Department of Development and Resource Management FROM: KEVIN GRAY, Supervising Engineering Technician Department of Public Utilities, Planning and Engineering SUBJECT: SOLID WASTE REQUIREMENTS FOR TENTATIVE(PARCEL MAP No. 2017-09 General Tentative Parcel Map No. 2017-09 for property located on South Bendel Lane between North Golden State Blvd and West Santa Ana Avenue; 4475 North Bendel Lane, APN: 510-080-11/510-080-12. The property is zoned IL (Light Industrial) Solid Waste Requirements General This location is serviced by a Commercial Solid Waste Franchisee. For service information, please contact Allied Waste at 559-275-1551 or 800-493-4285. Does Proiect Affect Your Agency/Jurisdiction Yes - Project has or will be required to provide a trash enclosure. Suggestions to Reduce Impacts/Address Concerns The design of any new, substantially remodeled, or expanded building or other facility shall provide for proper storage or handling which will accommodate the solid waste loading anticipated and which will allow for safe and efficient waste removal. I a A Nationally Accredited Public Utility Agency MEMORANDUM WILL TACKETT, Supervising Planner Department of Development and Resource Management November 3, 2017 SOLID WASTE REQUIREMENTS FOR TENTATIVE PARCEL MAP No. 2017-09 Page 2 of 3 Provide drive up access when possible. Relocate trash enclosure at least 40' away from entrance/exit. Plans do not show location of trash enclosure. Backing limit of 45'for solid waste vehicle. Provide 44' (centerline) turning radius. Minimum width of 18' for truck path. Gated entrances require 18' of clearance. Gates need to be relocated at least 40' away from entrance. Provide gate details. Enclosure shall be constructed on a level surface. The enclosure shall be level with the adjoining roadway (with no ramps, slopes, etc.). Trash enclosures are for storage of refuse and recycling bins only; no other equipment, piping, faucets or structures are to be constructed or placed within the enclosure. Recommended Conditions of Approval Enclosure shall be built in accordance with current City of Fresno Standards P-33 and P-34. Provide access to gates by 5:30 a.m. or provide remote, key or access code. 2-cell trash enclosure required. Provide turn around for solid waste vehicle (noted on plans). MEMORANDUM WILL TACKETT, Supervising Planner Department of Development and Resource Management November 3, 2017 SOLID WASTE REQUIREMENTS FOR TENTATIVE PARCEL MAP No. 2017-09 Page 3 of 3 Storm water Pollution Prevention Enclosure pads must be designed to prevent contamination of the storm water system. Measures that may be taken to achieve this include, but are not limited to, using roofs to divert storm water away from the enclosures, creating grade breaks to properly direct storm water away while keeping any water that may be in the enclosure from spilling out, and connecting a drain in the enclosure to the sewer system to collect contaminated water in cases of spillage, washing, etc. Additional Information Revise plans to address concerns stated above and resubmit for approval. Revise plans to show location of trash enclosure and resubmit for approval. Need answers to questions stated above. s kt1:: a OFFICE OF TELEPHONE(559)233-7151 FAX(659)233-8227 _ 2907 S.MAPLE AVENUE FRESNO,CALIFORNIA 93726-2208 YOUR MOST VALUABLE RESOURCE-WATER October 30, 2017 Will Tackett Department and Resource Management City of Fresno 2600 Fresno Street, Third Floor Fresno, CA 93721 RE: Tentative Parcel map No. 2017-09 S/e Shaw and Blythe avenues FID's Lisenby No. 45 Dear Mr. Tackett: The Fresno Irrigation District (FID) has reviewed the Tentative Parcel map No. 2017-09 for which the applicant proposes to divide the existing building into six units for office/warehouse use, APN: 510-080-11, 12. FID has the following comments: Summary of Requirements: a Review and Approval of Map • Review Fees Area of Concern 1. FID's active Lisenby No. 45 Pipeline runs southerly in a 30 feet wide exclusive easement recorded February 7, 2001 as Doc. No. 20010013629 O.R.F.C. and traverses the east side of the subject property, as shown on the attached FID exhibit map. FID's records indicate this section of pipeline was installed in 2010 (7 years old), as 24"ASTM C361 Rubber Gasket Reinforced Concrete Pipe (RGRCP) which meets FID's current standards for (residential, industrial, commercial) parcels and urban areas. General! Comments 1. FID requires its easements be shown on all maps and plans with proper recording information, and that FID be made a party to signing the final map. 2. FID requires it review, approve and be made a party to signing all improvement plans which affect its propertyleasements and canal/pipeline facilities including, G:%AgendesTresnoCity%Percel htap=17-09.doc BOARD OF President RYAN JACOBSEN, Vlce-President JERRY PRIETO, JR. DIRECTORS CHRISTOPHER WOOLF,GEORGE PORTER, GREGORY BEBERIAN,General Manager GARY R.SERRATO Will Tackett Re:TPM 2017-09 October 30, 2017 Page 2 of 2 but not limited to, Sewer and Water, FMFCD, Street, Landscaping, Dry Utilities, and all other utilities. 3. As with developer projects, there will be considerable time and effort required of FID's staff to plan, coordinate, engineer, review plans, prepare agreements, and inspect the project. FID's cost for associated plan review will vary and will be determined at the time of the plan review. 4. The above comments are not to be construed as the only requests FID will have regarding this project. FID will make additional comments and requests as necessary as the project progresses and more detail becomes available. Thank you for submitting this for our review. We appreciate the opportunity to review and comment on the subject documents for the proposed project. If you have any questions please feel free to contact Jeremy Landrith at (559) 233-7161 extension 7407 or 'landrith fresnoirrigation.com. Sincerely, Laurence Kimura, P.E. Chief Engineer Attachment G:VQendes1FtesnoCily1LPafoel Map12017.09 doe 1T _ V N _ i oLL E , N i 6 to ' x- o 13 —j o°a' 1 � c I r A31MMI _ P o a 12 a - A r � � a = m ee s" IL Vaorvas r� T z° w O e & -� 0� J O _ e ■ [A' LL Q � � a zit Q e 8 NV!ldVQ la aqa 12 I �b 'aN�quasf� - - - - e - _ - r� r ■ i .� ■ a ue ■ 1 NOW 3Hl•A19 � ♦ 8��� ,.�`kr •. .�P-S �o Q s K p ao �e�o p 2Ca. s �" z $ � U) a L E �„aem �MIA PE 2 -4 1001 •�f - ¢ T � `v3n FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.411 NOTICE OF REQUIREMENTS Page 1 of 4 PUBLIC AGENCY DEVELOPER WILL TACKETT KEN BOYD DEVELOPMENT SERVICES/PLANNING 275 S.MADERA AVE.,#100 CITY OF FRESNO KERMAN,CA 93630 2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93721-3604 PROJECT NO: 2017-009 ADDRESS: 4475 N.BENDEL AVE. APN: 510-080-11,12,13 Ste: -� Drainage Area(s) Preliminary Fee(s) Development Review Fee(s) I b� i Service Charges) AH $1.498.00 NOR Review• $50.00 To be paid prior to release of District comments to Public Agency and Developer. Grading Plan Review* $217.00 Amount to be submitted with first grading plan.submittal. Total Drainage Fee: S11498.00 Total Service Charge: 5267.00 z 'The Development Review Service Charge shown above is associated with FR DPA 2017-110 and is currently proposed to develop in conjunction with this permit.Payment for this entitlement shall satisfy the amount due on the associated permits. The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act.The District in cooperation with the City and County has developed and adapted the Ston-n Drainage and Flood Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of ML Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first submittal.The Storm Drain Plan fee shall be paid prior to return/pick up of first submittal. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/18 based on the site plan submitted to the District on 10/13/17 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, e') reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall BE DIRECTED TO BENDEL AVENUE. On — b. Grading and drainage patterns shall be as identified on Exhibit No. C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Pian. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities 04 located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as X None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: X Grading Plan Street Plan — Storm Drain Plan Water&Sewer Plan Final Map Drainage Report(to be submitted with tentative map) i Other None Required 4. Availability of drainage facilities: XPermanent drainage service is available provided the developer can verify to the satisfaction of the City a' that nonoff can be safely conveyed to the Master Plan inlet(s). — b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service. _ Permanent drainage service will not be available. The District recommends temporary facilities until C. permanent service is available. — d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities(State General Permits)require developers of constriction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the - discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by ow operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to:submit a Notice of Intent and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April,2014 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of ■ Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Stone Water Quality Management Construction and Post-Construction M& Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. ' 8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District 0 within ten days of the date of this Notice of Requirements. QD 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No.2 for additional comments,recommendations and requirements. Debbie Campbell Gary W.ChApnt an Design Engineer Project Engineer 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 CC: DANIEL ZOLDAK 4694 W.JACQUELYN AVE. FRESNO,CA 93722 z 0 ■ 0 ML 1 0 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 NOTE:THIS MAP IS SCHEMATIC. DISTANCES,AMOUNT OF CREDITABLE FACILITIES,AND LOCATION OF INLET BOUNDARIES ARE APPROXIMATE. SANTA ANA-AVE SANTA ANA ---AVE i m �ib\ LEGEND 13-- Existing Master Plan Facilities Future Master Plan Facilities TPM 2017-009 ® Existing 15' Wide FMFCD Easement 1 "=200' Direction of Drainage TPM 2017-009 DRAINAGE AREA "AH" EXHIBIT NO. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT Prepared by:keithr Date:1 011 3/201 7 Path:K:VUocadM)MSXOEXHIBFTXCITYTPM%2017-009.mxd OTHER REQUIREMENTS EXHIBIT NO. 2 There is an existing fifteen-foot (15') wide storm drain easement through the property as shown on Exhibit No. 1.No encroachments into the easement shall be permitted including,but not limited to, foundations, roof overhangs, swimming pools, and trees. The following; paragraphs only apply towards development of the individual parcels and are not conditions for the recording of the map. In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and maintained such that material that may generate contaminants will be prevented from contact with rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm drain system. The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities, product, or merchandise come into contact with and may contaminate storm water must be treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing is to be required unless such wash water can be directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas shall not be connected to the District's system. Loading docks, depressed areas, and areas servicing or fueling vehicles are specifically subject to these requirements. The District's policy governing said industrial site NPDES program requirements is available on the District's website at: www.fresnofloodcontrol.org or contact the District's Environmental Department,Daniel Rourke,for further information regarding these policies related to industrial site requirements. Development No. TPM 2017-009 k:\permits\exhibit2\city-tpm\2017\2017-009.docx(ge) co County of Fresno DEPARTMENT OF PUBLIC HEALTH David Pomaville, Director fiRE Dr. Ken Bird, Health Officer October 16, 2017 L00019197 Will Tackett 2602 Development & Resource Management 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 Dear Mr. Tackett: PROJECT NUMBER: TPM 2017-09 TENTATIVE PARCEL MAP NO. 2017-09 FOR PROPERTY LOCATED ON SOUTH BENDEL LANE BETWEEN NORTH GOLDEN STATE BLVD AND WEST SANTA ANA AVENUE. APNs: 510-080-11, -12 ZONING: IL SITE ADDRESS: 4475 NORTH BENDEL LANE Recommended Conditions of Approval for Future Residential Units: • Construction permits for the development should be subject to assurance that the City of Fresno community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Water Resources Control Board, Division of Drinking Water-Southern Branch. For more information call (559) 447-3300. • Construction permits for development should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116. • Due to the proximity of the proposed residential use to railroad tracks, consideration should be given to conformance with the Noise Element of the City of Fresno General Plan. Adequate information should be provided by the applicant to ensure compliance with the City's noise ordinance. It is recommended the applicant conduct an acoustical analysis, prior to approval of the project, to offer appropriate mitigation measures. REVIEWED BY. Kevin Tsuda, R.E.H.S. Environmental Health Specialist II (559) 600-3271 cc: Steven Rhodes- Environmental Health Division (CT. 42.05) Daniel Zoldak-Applicant (dzoldak@larsandersen.com) Promotion,preservation and protection of the community s health 1221 Fulton Mall/P. O. Box 11867, Fresno, CA 93775 (559)600-3271 - FAX(559)600-7629 The County of Fresno is an Equal Opportunity Employer www,co.fresno.ca.us - www,fcdph.org City of FIRE DEPARTMENT DATE: October 27, 2017 TO: WILL TACKETT, Supervising Planner Development and Resource Management Department FROM: BYRON BEAGLES, Fire Prevention Engineer Prevention and Technical Services Division SUBJECT: Parcel Map 2017-09 Site Address 4475 N. Bendel Ave Proposed parcel map is to create office/warehouse condominium units in an existing light industrial building. Fire Department requirements are as follows: 1. FFD access and fire hydrant requirements were documented in entitlement D-17-110 review on 9-8-17 with a memo sent to Robert Berend, Planner II. There are no additional requirements associated with this Parcel Map. BOARD OF EDUCATION Brooke Ashjian,President Claudia Cazares,Clerk Valerie F.Davis Fresno Unified Christopher De La Lindsay Cal Johnson School District1U;1MEASURDrEX Elizabeth Jonasson Rosas id Carol Mills,J D. ist Preparing Career Ready Graduates SUPERINTENDENT Robert G Nelson October 16, 2017 Will Tackett Development and Resource Management City of Fresno 2600 Fresno Street,Third Floor Fresno, CA 93721-3604 SUBJECT: REVIEW OF PROPOSED TENTATIVE PARCEL MAP NO.2017-09 4475 N.BENDEL LN. APNs: 510-080-11/510-080-12 Dear Mr. Tackett, In response to your request for review and comment on Tentative Parcel Map No. 2017-09, Fresno Unified School District submits the following. Any urban commercial or residential development occurring as a result of project approval will have an impact on the District's student housing capacity. The District, through local funding, is in a position to partially mitigate its shortage of classrooms to accommodate planned population growth for the foreseeable future. However,the District recognizes that the legislature,as a matter of law,has deemed,under Government Code Section 65996,that all school facilities impacts are mitigated as a consequence of SB 50's Level 1,2 and 3 developer fee legislative provisions. The Fresno Unified School District levies a commercial/industrial development fee and the current fee rate is $0.56 per square foot. The new development on the property will be subject to the development fee prior to issuance of a building permit and fees will be calculated pursuant to rates effective at the time of payment. The project is presently within the attendance areas of the schools identified below. Elementary School: Slater Middle School: Wawona High School: Bullard Thank yoifl'or the opportunity to comment. Please contact our office at 457-3066 if you have any questions or require additional informati 'i regarding our comments. Sinc ely,i� lex Belanger, s 'Stant Superintendent Facilities Moag ent and Planning AB:hl 2309 Tulare Street Fresno, CA 93721-2287 www.fresnounifred.oi 2