Loading...
HomeMy WebLinkAbout401.001 - Appointment CancellationEffective Date: June 2008 Darla Scott, Supervising Fire Prevention Inspector Current Revision Date: 12/17/2024 Section 401.001 Next Revision (1) Date: 12/17/2027 Page 1 of 2 Fresno City Fire Department 400 Prevention Manual SECTION 401.001 APPOINTMENT CANCELLATION PURPOSE This policy clarifies the Fresno Fire Department’s (FFD or Department) requirements for the timely cancellation of, or request to change, scheduled new construction and five-year test appointments. APPLICATION This policy applies to all contractors requesting to cancel or change a scheduled new construction or five-year test appointment. OPERATIONAL POLICY This section intentionally left blank. OPERATIONAL GUIDELINE In order to provide timely service to all contractors requesting inspections from the Fire Prevention Division, new construction and five-year test appointments are scheduled on a daily basis. As the Fire Prevention Division strives to provide more efficient services, parameters need to be set regarding the cancellation of new construction and five-year test appointments or requests to change an appointment to a different permit. When a contractor does not cancel an appointment in a timely manner, it limits the amount of time staff has to accommodate other contractors requesting inspections. When a contractor changes an appointment at the last minute, it causes additional work for staff that are preparing the inspection schedule for the following day. When a contractor determines they are not ready for an inspection or wants to change a scheduled appointment to a different permit, the contractor shall notify the Prevention Division by telephone or email. To avoid being charged additional fees, the contractor is required to notify the Department by 12 p.m. (noon) one business day prior to the scheduled appointment. If a contractor does not call or email within this timeframe or is not ready for a scheduled inspection when an inspector arrives at the location, a re-inspection fee will be charged in accordance with the FFD Policy 401.003, Re-inspection Fees and the currently adopted Master Fee Schedule. Effective Date: June 2008 Darla Scott, Supervising Fire Prevention Inspector Current Revision Date: 12/17/2024 Section 401.001 Next Revision (1) Date: 12/17/2027 Page 2 of 2 PROCESS This section intentionally left blank. INFORMATION The demand for new construction and five-year test appointments and the delay to obtain an appointment date continues to increase. This policy was created to resolve some of the delays by addressing the issue of contractors cancelling appointments without sufficient time for Department staff to fill these appointments. When this occurs, it contributes to project delays. With sufficient notice, Department staff can effectively schedule inspections, decreasing delays and utilizing all available appointment times. Additionally, when contractors change an appointment to a different permit number, it creates additional work for staff. The additional work required impacts the Department’s ability to efficiently respond to the needs of the public we serve. DEFINITIONS This section intentionally left blank. CROSS-REFERENCES City of Fresno Master Fee Schedule Fire Prevention Manual, Policy 401.003, Re-Inspection Fees