HomeMy WebLinkAboutP24-01356 - Conditions of Approval - Conditions of approval Tentative parcel map 2024-05 - ARMSTRONG 2045 N - 7/8/2024Page 1 of 4
T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2024\PM 2024-05 ARMSTRONG 2045 N\PM-2024-05 (P24-01356)
E.doc
DATE: June 27, 2024
TO: Juan Lara, Planner III
Planning and Development Department
THROUGH: Jill Gormley, TE, Assistant Director
Public Works Department, Traffic & Engineering Services
FROM: Angela Reis, Chief Engineering Technician
Department of Public Works, Traffic Planning Section
SUBJECT: Public Works Conditions of Approval
PM 2024-05 / P24-01356 a 2- parcel subdivision
2045 N Armstrong Ave
Lennar / Yamabe & Horn Engineering, Inc
PUBLIC IMPROVEMENT REQUIREMENTS
The Public Works Department, Traffic and Engineering Services Division, has completed its
review and the following requirements are to be placed on this tentative map as a condition of
approval by the Public Works Department.
The following requirements are based on city records and the accuracy of the existing and
proposed on-site and off-site conditions depicted on the tentative map. Requirements not
addressed due to omission or misrepresentation of information, on which this review process is
dependent, will be imposed whenever such conditions are disclosed.
Additional conditions will be required for the proposed Tentative Tract Map, for the subdivision
of residential lots.
If applicable, construct or install the required improvements or contact Public Works to enter
into a bonded secured agreement for these improvements. This must be executed prior to
perfection of this parcel map. Contact Public Works at (559) 621-8800.
Page 2 of 4
T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2024\PM 2024-05 ARMSTRONG 2045 N\PM-2024-05 (P24-01356)
E.doc
General Conditions
· Map boundary shall include “Fee Title Interest”.
· Right of way: All right-of-way “outside” of the subdivision border shall either be acquired
prior to recordation of Final Map, or a deposit equal to the value of the right-of-way and
an estimate of the City staff time necessary to acquire the right-of-way shall be
submitted prior to recordation of the Final Map.
· Additional conditions and offsite improvements will be required at the time of future
tentative tract map/ site plan review.
· Provide a 30’ visibility triangle at all street intersections and a 12’ visibility triangle where
all driveways and / or alleys intersect streets.
· Underground all existing offsite overhead utilities with the limits of this map in
accordance with Fresno Municipal Code Section 15-4114.
· Street widening and transitions shall also include utility relocations and necessary
dedications.
· When permanent facilities are not available from the Fresno Metropolitan Flood Control
District, the applicant shall identify a temporary onsite storm water basin per Public
Works Standard P-97 for review and approval from Public Works.
· Irrigation /Canal Requirements: If applicable, the developer shall enter into an
agreement with the Fresno Irrigation District (FID) providing for piping the canal(s) and
submit an executed copy of the agreement or commitment letter from FID to the Public
Works Department. All piping shall be located outside of the proposed street right of
way. Any piping across city streets shall be rubber gasketed reinforced concrete pipe
(RGRCP) constructed perpendicular to the street. Submit engineered plans to Public
Works Department, Engineering Services Division for review and approval. Identify the
proposed easement and provide a final cross-sectional detail on the map.
· Private pipe: All piping shall be located outside of the proposed street right of way. Any
piping across city streets shall be rubber gasketed reinforced concrete pipe (RGRCP)
constructed perpendicular to the street, if appliable.
Page 3 of 4
T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2024\PM 2024-05 ARMSTRONG 2045 N\PM-2024-05 (P24-01356)
E.doc
Street Dedications and / or Vacations
Identify pedestrian paths of travel along public sidewalks: Provide a minimum of 4’ clear to
accommodate access along the entire street frontage of this map. Pedestrian easements may
be required to accomplish this. Identify all street furniture, e.g.: public utility poles and boxes,
guy wires, signs, fire hydrants, bus stop benches, mailboxes, newsstands, trash receptacles,
tree wells, etc. within the public right of way or public easements.
The construction of any overhead, surface or sub-surface structures and appurtenances in the
public rights-of-way is prohibited unless an encroachment covenant is approved by the City of
Fresno Public Works Department, Engineering Services Division. Contact Jason Camit at
(559) 621-8681. Encroachment agreements must be approved prior to final map.
Frontage Improvement Requirements
All improvements shall be constructed in accordance with the Standard Specifications and
Standard Drawings of the City of Fresno, Public Works Department. Street / alley construction
plans may be required and shall be approved by the City Engineer. The performance of any
work within the public street rights-of-way (including pedestrian and utility easements) requires
a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno
Public Works Department, Engineering Services Division at (559) 621-8800 for detailed
information.
Public Streets:
McKinley Avenue: 2 Lane Collector
1. Dedication Requirements:
a. Dedicate 36’-44’ of property, for public street purposes, within the limits of this
application, per Public Works Standard P-54 and P-69. North of the centerline per
Official Plan Line No. 150.
b. If not existing, dedicate a corner cut for public street purposes at the intersection of
McKinley and Armstrong.
Armstrong Avenue: 2 Lane Collector
2. Dedication Requirements:
a. Dedicate 36’-44’ of property, from centerline, for public street purposes, within the
limits of this application, per Public Works Standard P-54 and P-69. Center line shall
be established per the approved Director’s Determination No. 15-E-11424.
Page 4 of 4
T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2024\PM 2024-05 ARMSTRONG 2045 N\PM-2024-05 (P24-01356)
E.doc
Traffic Signal Mitigation Impact (TSMI) Fee: This project shall pay all applicable TSMI Fees,
at the time of Parcel Map approval. The fees are based on the Master Fee schedule.
Contact the Public Works Department at (559)621-8800.
Fresno Major Street Impact (FMSI)Fees: This map is in the New Growth Area; therefore,
pay all applicable growth area fees and City-wide regional street impact fees. Contact the
Public Works Department at (559)621-8800.
Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint
Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148
ext. 200; www.fresnocog.org. Provide proof of payment or exemption prior to granting final
occupancy.
Questions relative to these conditions may be directed to Angela Reis (559) 621-8684
Angela.Reis@fresno.gov in the Public Works Department, Traffic Planning Section.