HomeMy WebLinkAboutT-6165 - Conditions of Approval - 4/19/2017 CITY OF FRESNO
DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT
CONDITIONS OF APPROVAL
APRIL 19, 2017
VESTING TENTATIVE TRACT MAP NO. 6165/UGM
GENERALLY LOCATED ON THE NORTH SIDE OF EAST CHURCH AVENUE BETWEEN SOUTH
SUNNYSIDE AND SOUTH FOWLER AVENUES
All tentative maps are subject to the applicable provisions of the State Subdivision Map
Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard
Specifications. The following specific conditions are applicable to this vesting tentative
map:
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the
imposition of fees, dedications, reservations or exactions for this project are
subject to protest by the project applicant at the time of approval or conditional
approval of the development or within 90 days after the date of the imposition of
the fees, dedications, reservations or exactions imposed on the development
project. Each local agency shall provide to the project applicant a notice in writing at
the time of the approval of the project or at the time of the imposition of the fees,
dedications, reservations, or other exactions, a statement of the amount of the fees or a
description of the dedications, reservations, or other exactions, and notification that the
90-day approval period in which the applicant may protest has begun (please see
section related to Development Fees and Charges included herein below for further
information).
Improvements and payments shall not be required on or in front of any undeveloped
portion of a net acreage of ten acres or more which exists after the division of land. All
improvements and payments shall be completed with development.
URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL)
The subdivider of property located within the UGM boundaries shall comply with all
sewer, water and street requirements and pay all applicable UGM fees imposed under
the Urban Growth Management process (with appropriate credit given for the
installation of required UGM improvements) in accordance with the requirements of
State Law as related to tentative tract maps.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 2
GENERAL CONDITIONS
1. Prior to final map approval, the owner of the subject property shall execute a
15 W AW DLP -FRYHCDW LV AWE&U TRI y Llfbno. Said covenant is to run with
the land and shall acknowledge and agree that the subject property is in or near
agricultural districts located in the City and/or County of Fresno and that the
residents of the subject property should be prepared to accept the
inconveniences and discomfort associated with normal farm activities. The
15 U ) DlIP LI1FRHMQNV-DZEH11ffRlSC 1G SIRU�W-IR111FRCF❑l L Emil
recording of any Final Map of Vesting Tentative Tract No. 6165/UGM.
2. The subdivider shall comply with San Joaquin Valley Air Pollution Contorl District
Rule 9510. Any applicant subject to District Rule 9510 is required to submit an
Air Impact Assessment (AIA) application to the District and to pay any applicable
off-site mitigation fees.
3. The subdivider shall comply with Regulation VIII and Rule 8060 of the San
Joaquin Valley Air Quality Pollution Control District for the control of particulate
matter and fugitive dust during construction of this project.
4. The developer/owner shall pay the appropriate park facilities fee and/or dedicate
lands for parks and recreation purposes pursuant to Ordinance Nos. 2005-112
and 2005-113 adopted by the Fresno City Council on September 27, 2005; with
the exception of any alternative agreements which may be made subject to a
Development Agreement.
5. Submit grading plans and a soils report to the City of Fresno Development and
Resource Management Department, Development Services (Planning) Division
for verification prior to Final Map approval. Grading plans shall indicate the
location of any required walls and indicate the proposed width of required
landscape easements or strips. Approval of the grading plan is required prior to
Final Map approval.
6. At the time of Final Map submittal, the subdivider shall submit engineered
construction plans to the City of Fresno Public Works, Public Utilities, and
Development and Resource Management Departments for grading, public
sanitary sewer system, public water system, street lighting system, public streets,
and storm drainage, including other technical reports and engineered plans as
necessary to construct the required public improvements and work and
applicable processing fees.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 3
7. Engineered construction plans shall be approved by the City prior to the approval
of the Final Map. If, at the time of Final Map approval, such plans have not been
approved, the subdivider shall provide performance security in an amount
established by the City to guarantee the completion of plans.
8. Public utilities easements, as necessary, shall be shown on the Final Map and
dedicated to the City of Fresno. Public utility easements beyond the limits of the
Final Map, but required as a condition of development, shall be acquired at the
VCE CF _` -]DQ)F-HCG-KF -EEI\AFISDLEkNl_dC MAL P HDADVAW Wn e of
Final Map approval. The relocation of existing utilities necessitated by the
required public improvements shall be paid for by the subdivider. The subdivider
is responsible to contact the appropriate utility company for information.
9. Comply with the conditions, policies and standards set forth in the City of Fresno,
Municipal Code, & DS\HU__❑_L3 D11U91WDCW _I Resolution No. 68-187,
I&BU-3 RQF-F Z W11❑5 H\/SF-FW\R116❑EGYLVLRaM DM-1&YC RI❑) WR-6 UMG
Specifications, 2002 Edition, and any amendments thereto.
10. The subdivider shall pay applicable fees for, but not limited to, plan checks for
street improvements and other grading and construction; street trees, street
signs, water and sewer service, and inspections in accordance with the City of
Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and
any amendments, modifications, or additions thereto; and in accordance with the
requirements of State law as related to tentative maps.
11. The subdivider shall furnish to the City acceptable security to guarantee the
construction of the off-site street improvements in accordance with all applicable
provisions of the Fresno Municipal Code (FMC) and the State Subdivision Map
Act. The subdivider shall complete all the public improvements prior to the
approval of the Final Map by the City. If, at the time of Final Map approval, any
public improvements have not been completed and accepted in accordance with
the standards of the City, the subdivider may elect to enter into an agreement
with the City to thereafter guarantee the completion of the improvements.
12. As a condition of Final Map approval, the subdivider shall furnish to the City a
subdivision guarantee listing all parties having any right, title or interest and the
nature of their interest per State law.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 4
GENERAL INFORMATION
13. Prior to the issuance of building permits for the subdivision, school construction
fees shall be paid to the respective school district, in which the subject property is
located, in accordance with the school district-s adopted schedule of fees.
14. Contact the United States Postal Service for the location and type of mailboxes
to be installed in this subdivision.
a) It is recommended that at least 6 months prior to the first occupancy, the
Developer shall contact the local United States Postal Service representative
to complete a Mode of Delivery Agreement for New Construction. The Mode
of Delivery Agreement must have a District approval signature to be valid. In
addition to completing the Agreement, the Developer shall provide a final map
(with address details) to the local USPS representative. The Developer shall,
at their own expense, procure, construct and install all mail receptacle
facilities for each location as specified and approved by the USPS.
15. 3❑YEDQM16 FFWQ-L TI❑❑a-IRI IWI[6 LEGMMRO-0 DS[$FWZ AFEAAUNVL17 EHF U❑W
of the subdivider to file multiple Final Maps shall not limit the authority of the local
agency to impose reasonable conditions relating to the filing of multiple Final
0 DSVL-Any multiple final maps filed by the subdivider on this tract shall fully and
independently conform to all provisions of FMC Chapter 15, 3 DlWV,9 1 DCG
' b1MRQ/-_ILCFGGQJ E LNGA Article 36, 0 LCA DSV.
16. The developer/owner shall obtain any and all permits required for the removal or
demolition of any existing building or structure located within the subdivision
boundaries. The developer/owner shall also obtain any and all permits required
for the proper abandonment/closure of any existing water well, septic tank/leach
field or cesspool, and irrigation pipeline on the subject property. All such permits
shall be obtained prior to commencement of tract grading work, in accordance
with Chapter 13 of the FMC.
17. If archaeological and/or animal fossil material is encountered during project
surveying, grading, excavating, or construction, work shall stop immediately.
18. If there are suspected human remains, the Fresno County Coroner shall be
immediately contacted (business hours: (559) 268-0109; after hours the contact
phone number is (559) 488-❑❑❑❑4RUGIVH) lHvCR-&R❑QAt6 EFLILI W HSDLW FKW''J❑
remains or other archaeological material is possibly Native American in origin,
the Native American Heritage Commission (phone number (916) 653-4082) shall
be immediately contacted, and the California Archaeological Inventory/Southern
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 5
San Joaquin Valley Information Center (phone number (805) 644-2289) shall be
contacted to obtain a referral list of recognized archaeologists.
19. If animal fossils are uncovered, the Museum of Paleontology at the University of
California, Berkeley shall be contacted to obtain a referral list of recognized
paleontologists. An assessment shall be conducted by a paleontologist; if the
paleontologist determines the material to be significant, a recommendation shall
be made to the City as to any further site investigation or preservation measures.
20. Apportionment of Special Assessment: If, as part of this subdivision, a division
will be made of any lot or parcel of land upon which there is an unpaid special
assessment levied under any State or local law, including a division into
condominium interest as defined in Section 783 of the Civil Code, the
developer/owner shall file a written application with the City of Fresno Director of
Public Works, requesting apportionment of the unpaid portion of the assessment
or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain
the following information:
a. A full description of each assessed lot, parcel or interest to be divided and of
how such lot, parcel or interest will be divided;
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and
c. Written consent of the owner(s) of each such lot, parcel, or interest to the
requested apportionment.
d. The application shall be filed prior to the approval of the Final Map(s) by the
City and shall be accompanied by a fee in an amount specified in the Master
Fee Resolution for each separate lot, parcel, or interest into which the
original assessed lot, parcel or interest is to be divided. The fee shall be in
an amount sufficient to pay all costs of the City and the Engineer of Work
responsible for determining the initial assessment in making the requested
apportionment.
MITIGATION MONITORING REQUIREMENTS
21. Development of the subject property shall be subject to implementation of all
applicable mitigation measures, fees, and timelines included within the Initial
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 6
Study and Mitigated Negative Declaration prepared for Environmental
Assessment No. A-16-014/R-16-013/T-6165 dated October 21 , 2016.
a) The Mitigated Negative Declaration prepared for the proposed project is
tiered off of the Fresno General Plan Master Environmental Impact Report
(MEIR SCH No. 2012111015). Development of the subject property shall be
subject to implementation of all applicable mitigation measures included
within the MEIR for subsequent projects; included herein by reference.
DEVELOPMENT AGREEMENT
22. Subdivision and development of the proposed project shall be subject to any/all
terms included within a Development Agreement made by and between the City
of Fresno, a municipal corporation, and High and Mighty Farms, Inc. a California
Corporation; Courthouse California, LLC., an Arizona limited liability company;
and Nancy M. Dunlap, Trustee of the Ruth Martori Non-QTIP Marital Trust, dated
July 26, 1994; as may be adopted by the Fresno City Council.
NOTE: With the exception of those conditions which may be required
in order to implement the mitigation measures identified by
Environmental Assessment No. A-16-014/R-16-013/T-6165 dated
October 21, 2016, where any inconsistencies or conflicts may exist
between these Conditions of Approval and the terms or provisions of
the Development Agreement, the stipulations of the Development
Agreement shall prevail.
ZONING & PROPERTY DEVELOPMENT STANDARDS
23. Upon conditional approval of Vesting Tentative Tract Map No. 6165/UGM, the
subdivider may prepare a Final Map in accordance with the approved tentative
map; and, the following:
a) Approval of Vesting Tentative Tract Map No. 6165/UGM is contingent upon
City Council approval of Plan Amendment Application No. A-16-014.
b) Approval of Vesting Tentative Tract Map No. 6165 is contingent upon City
Council approval of Rezone Application No. R-16-013.
c) Establishment of the proposed tentative map boundary represented on
Vesting Tentative Tract Map No. 6165/UGM is contingent upon recordation of
a Parcel Map (final), consistent with proposed Vesting Tentative Parcel Map
No. 2016-05.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 7
24. Development of the subject property shall comply with all development standards
of the RS-5 (Residential, Single-Family) zone district; Article 41 (Subdivision
Design Standards); and, all applicable requirements of the Fresno Municipal
Code.
Landscaping, Open Space and Walls
25. Proposed Outlot(sEH$EIR E9 RA21_7F-QBk&'HL7lDF\A0 DSE1 R=165/UGM shall be
dedicated for public common open space purposes and shall be maintained in
accordance with the Maintenance Obligations stipulated herein below; or, in a
manner which provides appropriate security and is deemed acceptable to both
the City of Fresno Development and Resource Management and Public Works
Departments.
26. Pursuant to Policies 1-5.8 & 2-3.9 of the Roosevelt Community Plan, the
subdivider shall provide a minimum 15-foot wide landscape easement (and
irrigation system) along the westerly property lines of all lots with frontage on
South Sunnyside Avenue (i.e., Lots 1-11 of Vesting Tentative Tract Map No.
6165/UGM).
a) Construct a 6-foot high solid masonry sound wall (at finished grade of
proposed site) pursuant to the solid wall requirements of Section 15-2006 &
15-2018 of the FMC behind the required 15-foot wide landscape easement
along the westerly property lines of all lots with frontage on South Sunnyside
Avenue (i.e., Lots 1-11 of Vesting Tentative Tract Map No. 6165/UGM).
27. Pursuant to Policies 1-5.8 & 2-3.9 of the Roosevelt Community Plan, the
subdivider shall provide a minimum 15-foot wide landscape easement (and
irrigation system) along the easterly property lines of all lots with frontage on
South Fowler Avenue (i.e., Lots 124-133 of Vesting Tentative Tract Map No.
6165/UGM).
a) Construct a 6-foot high solid masonry sound wall (at finished grade of
proposed site) pursuant to the solid wall requirements of Section 15-2006 &
15-2018 of the FMC behind the required 15-foot wide landscape easement
along the rear property lines of all lots with frontage on South Fowler Avenue
(i.e., Lots 124-133 of Vesting Tentative Tract Map No. 6165/UGM).
28. Pursuant to Section 15-4105-G-2-a of the FMC, when a Local Street intersects a
Major Street and the corner lot sides onto the Local Street, the corner lot shall
provide a minimum 8-foot wide landscaped strip (or easement subject to the
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 8
conditions contained herein below) and irrigation system along the street side
yard of the respective corner lot (i.e., Lots 1, 126-127 of Vesting Tentative Tract
Map No. 6165UGM).
a) A greater landscape strip may be necessary for visibility purposes pursuant to
Section 15-2018 of the FMC; and/or, for purposes of inclusion within the
Community Facilities District (CFD) for maintenance purposes.
i) The subdivider shall provide minimum 10-foot wide landscape easement
as necessary for purposes of inclusion within the CFD for maintenance
purposes.
b) A minimum 6-foot high masonry wall (at finished grade of proposed site)
pursuant to the solid wall shall be placed at the rear of the landscape strip or
easement in accordance with the requirements of Section 15-2006 & 15-2018
of the FMC.
29. Provide a landscape strip (and irrigation system) at the end of all interior blocks
(i.e., Lots 32-33, 43-44, 54-55, 64-65, 74-75, 82-83, 89-90, 97-98, 134, 137, 142-
143, 149, 163-164,178-179, 193-194, 208 of Vesting Tentative Tract Map No.
6165/UGM), in accordance with Section 15-4105-G-2-b of the FMC; and the
following:
a) A minimum landscape strip of five feet and irrigation system is required along
the street side yard of the respective corner lot; unless a minimum four-foot
wide park strip is provided between the curb and sidewalk.
i) 7 EHIIOQaFDSH❑V1W1E11I I HTLV_D(SEH❑GFD\PoIG-DGWHQNW--I I❑I_V_4G-Q DOL
S13HA M ZIYAQ�] \NH❑ DOWHCW S-IEQF- VAFM WJ-W-of-way and shall
incorporate street trees to shade the adjacent sidewalks in accordance
with Public Works standards, specifications, and policies.
b) A minimum 6-foot high masonry wall (at finished grade of proposed site)
pursuant to the solid wall shall be placed at the rear of the landscape strip or
easement in accordance with the requirements of Section 15-2006 & 15-2018
of the FMC; with the following exceptions:
i) The wall shall not be required for proposed Lots 32, 75, 90, 97-98, or 134
of Vesting Tentative Tract Map No. 6165/UGM.
NOTE: An opening in the masonry wall may be permitted to provide a
gate for access if approved by the Public Works Director.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 9
30. / DQ3/FDSLQJ FIZ F1FU2MFRP SEW LWI WH&UTRI) l -$QA(Graffiti Landscaped
1 HLL HYHOSP HWDCG3 021-6 WXXDL&/-iV-iDUEHiLHTEBiGDVEUQhURUHCG
blocks and adjacent to all required walls or fences that are accessible to the
public and shall be maintained in accordance with the Maintenance Obligations
stipulated herein below; or, in a manner which provides appropriate security and
is deemed acceptable to both the City of Fresno Development and Resource
Management and Public Works Departments.
31. The subdivider is required to provide street trees on all street frontages per
Fresno Municipal Code standards and is responsible for the dedication of public
planting and buffer landscape easements as determined by the Development
and Resource Management and Public Works Departments.
a) Street trees shall be planted at the minimum rate of one tree for each 40 feet
of street frontage; or, one tree per home (whichever is greater) by the
developer.
i) The subdivider is required to provide irrigation for all street trees. The
irrigation system shall comply with FMC Section 15-2309.
NOTE: Irrigation systems shall comply with the requirements of the
California Green Building Standards Code and/or the California Model
Water Efficient Landscape Ordinance and/or California Plumbing Code
as may be amended.
32. Provide a corner cut-off area at all intersections, driveways and alleys where
walls or fences and/or landscaping are proposed and/or required, in accordance
with Section 15-2018 of the FMC.
a) Street Intersections. Vegetation and/or structures, flagpoles, signs, fences or
walls may not exceed a height of three feet within the triangular sight-distance
area formed by the intersecting curb lines (or edge of pavement when no curb
exists) and a line joining points on these curb lines at a distance of 30 feet
along both lines from their intersection.
i) Trees that are located within the sight distance triangle shall have a
clearance of eight feet high minimum between the lowest portion of the
canopy and the sidewalk and street.
b) Driveways and Alleys. Visibility of a driveway crossing a street lot line shall
not be blocked above a height of three feet by vegetation or structures for a
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 10
depth of 12 feet as viewed from the edge of the right-of-way on either side of
the driveway at a distance of 12 feet. Street trees shall be pruned at least
seven feet above the established grade of the curb so as not to obstruct clear
view by motor vehicle drivers.
33. When the grading plan establishes a top of slope beyond the required landscape
strip/easement noted and the construction of the required wall(s) is to be
established coincident with the top of slope then the required minimum easement
width shall be expanded to include the full landscaped area up to the wall
location.
34. All proposed/required landscaped easements/buffers, open space areas,
pedestrian connections, entryways, pathways and/or private on-site landscaping
for street tree purposes shall be improved in accordance with landscape
improvement plans, which are to be submitted to the Development and Resource
Management Department for review and approval prior to Final Map approval.
NOTE: Lighting and fence/wall details for any proposed/required open
spaces areas or pedestrian connections shall be provided with the
submittal of the landscape improvement plans.
35. Maintenance of any/all required landscape easements, strips and/or proposed
Outlots within the boundary of Vesting Tentative Tract Map No. 6165/UGM shall
be provided pursuant to the Maintenance Obligations stipulated herein below or
in a manner which provides appropriate security and is deemed acceptable to
both the City of Fresno Development and Resource Management and Public
Works Departments.
36. Comply with all street tree, buffer landscaping, median island, outlot, and trail
requirements included within the attached memorandum from the Department of
Public Works, Streets Division dated October 07, 2016.
STREETS AND RIGHTS-OF-WAY
37. The subdivider shall furnish to the City acceptable security to guarantee the
construction of the off-site street improvements in accordance with all applicable
provisions of the FMC and the State Subdivision Map Act.
38. The subdivider shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap
access ramps are required to be constructed in sidewalks at all corners within the
limits of the tract. Where street furniture is located within the sidewalk area (fire
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 11
hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be
maintained to satisfy the American Disabilities Act requirements. If necessary,
dedicate a pedestrian easement to accommodate for the 4-foot minimum
unobstructed path requirement.
39. Comply with all of the requirements included within the attached Public Works
Department, Traffic and Engineering Services Division memorandums dated
November 17, 2016 and December 14, 2016; and, the following:
a) Required improvements for South Fowler Avenue from the southern boundary
RI M i11P DSS DWS&❑❑IEILIC$YHQ_H3LDMC FOKaIEXNHCSWAVU;URI mFF6 DI Hu
5 REWAW FEFfCc
SANITARY SEWER SERVICE
The nearest sanitary sewer main to serve the proposed project are an 8-inch sewer
main located in the South Fowler Avenue, a 15-inch main located in South Sunnyside
Avenue, and a 48-inch trunk located in East Church Avenue. The following water
improvements shall be required prior to providing City sanitary sewer service to the
project:
40. Comply with all of the requirements included within the attached Department of
Public Utilities, Planning and Engineering Division (Sanitary Sewer)
memorandum dated October 25, 2016.
WATER SERVICE
The nearest water mains to serve the proposed project are a 14-inch main located in
South Fowler Avenue, a 14-inch main located in South Sunnyside Avenue, and a 14-
inch main located in East Church Avenue. The following water improvements shall be
required prior to providing City water service to the project:
41. Comply with all of the requirements included within the attached Department of
Public Utilities, Water Division memorandum dated October 06, 2016
SOLID WASTE SERVICE
42. This tract will be serviced as Single Family Residential properties with Basic
Container Service (3 container - solid waste, green waste & recyclable material)
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 12
FIRE SERVICE
Fire service is available to the proposed tract subject to the following requirements:
43. Comply with all of the requirements included within the attached Fresno Fire
Department memorandum dated October 28, 2016.
FLOOD CONTROL AND DRAINAGE
44. The subdivider shall be required to comply with the specific requirements
imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the
subdivision or any amendments or modifications to those requirements which
may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307
of the Fresno Municipal Code. These requirements are identified in the District's
memorandums to the Development and Resource Management Department
dated November 01 , 2016.
a) Any temporary basin constructed for or used by this subdivision requires
approval of FMFCD and the City of Fresno, and may only be implemented
through a covenant between the City and the Developer prior to final map
approval. Temporary basins shall be fenced within seven days of the time a
basin becomes operational, and fencing shall conform to City of Fresno
Public Works Standard No. P-98. The Fresno Mosquito and Abatement
District shall be provided access rights and a means of entry for inspection
and mosquito abatement activities for all on-site basins (refer to attached map
of mosquito abatement districts in the Fresno-Clovis Metropolitan Area).
Attached hereto, and incorporated by reference, is a copy of the updated
Public Works Standard No. P-97 for temporary on-site ponding basins, and a
copy of the City of Fresno's Guidelines for Ponding Basin / Pond Construction
and Management, dated October 29, 2004. Maintenance of temporary
ponding basins shall be by the Subdivider until permanent service for the
entire subdivision is provided unless such facilities, if proposed, are required
to be annexed into the Community Facilities District by the Public Works
Department prior to Final Map recordation.
COUNTY OF FRESNO DEPARTMENT OF PUBLIC HEALTH
45. Comply with all of the requirements included within the attached County of
Fresno, Department of Public Health memorandum dated October 04, 2016.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 13
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
46. Comply with all requirements and the monitoring and reporting schedule included
within the attached memorandum from the San Joaquin Valley Air Pollution
Control District dated January 30, 2017.
RIGHT-OF-WAY ACQUISITION
47. The developer will be responsible for the acquisition of any necessary right-of-
way to construct any of the required improvements.
48. Rights-of-way acquisition shall include any rights-of-way necessary for proper
drainage, signing, pole relocation, and shoulder grading. In general, this will
require right-of-way to be provided approximately 10 feet outside the travel lane.
The exact requirement must be determined at the project design stage based on
the existing conditions and detailed design information.
49. In the event an acquisition of any easement or right-of-way is necessitated by the
subject development, said acquisition will be accomplished prior to Final Map
approval. The developer/owner should contact the Real Estate Section of the
Public Works Department to receive procedural guidance in such acquisitions.
50. Should such acquisition not be accomplished by the subdivider prior to Final Map
approval, the subdivider must request and grant to the City the full authority to
attempt acquisition either through negotiation or through its power of eminent
domain. The subdivider shall furnish to the City Public Works Department,
Engineering Division/ Real Estate Section, an appraisal report or a request for an
estimated appraisal amount (to be determined by the City of Fresno Real Estate
Section) prior to preparation of a Subdivision Agreement.
51. The subdivider shall submit adequate security in the form of a cash deposit to
guarantee payment of all costs associated with the acquisition, including staff
time, attorney's fees, appraisal fees, court costs, and all related expenditures and
costs necessary to effect the acquisition of such easements or rights-of-way.
MAINTENANCE OBLIGATIONS
The long term maintenance of all the items listed below is ultimately the responsibility of
the owner/developer:
52. With the exception of those areas which may be eligible for inclusion within the
Community Facilities District (CFD) as referenced herein below, obligations for
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 14
retention and maintenance of required end-block landscaped areas or strips for
all corner lots shall be the responsibility of the respective property owner(s) on
which the landscaped area is located.
a) Execute a covenant for all properties for which retention and maintenance of
an end-block landscaped area or strip on a corner lot is the responsibility of
the respective property owner prior to recordation of a Final Map.
NOTE: The covenant shall disclose and acknowledge all
responsibilities associated with these conditions of approval to
prospective buyers when individual lots are sold and identify terms, as
appropriate, to assure compliance. The covenant shall be prepared in
a form approved by the City of Fresno.
53. Comply with all the requirements included within the attached Department of
Public Works, Traffic and Engineering Services Division memorandum regarding
Conditions for Maintenance Requirements dated December 05, 2016; and, the
following:
54. ,I❑WH❑RZ C FUG YHA RYI FER7VM/❑\R❑EHF-DCS HG❑ORLI WH❑&YTVL&) ' ❑I FU
maintenance purposes, then an Annexation Request Package shall be submitted
to the Public Works Department for review, processing, and approval.
NOTE: Packages must be complete with all required information in
order to be accepted. The Annexation Request Form is available on-
line on the City of Fresno website (http://www.fresno.gov) under the
Public Works Department Developer Doorway.
a) Construction plans for all features to be maintained by a CFD for a final map
shall be included in the final map submission to the Development Department
for processing. Where applicable, this shall include a Street Tree Location
and Street Tree Species (by street) map. Landscaping plans shall contain
actual tree and plant counts by species and include the areas (in square feet)
of turf, shrubs and trees, and sidewalks or other paved areas within all
landscaped areas.
NOTE: The Department of Public Works will not be responsible for the
maintenance of any outlots if they are not included into the Community
Facilities District (CFD). If the outlots are to be included into the CFD,
the Department of Public Works will require that landscape and
irrigation plans be submitted with landscape buffer plans for approval
prior to inclusion into the CFD.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 15
b) Proceedings to place the Final Map into a CFD shall not commence until the
Final Map, Landscape and Street Construction Plans are considered to be
technically correct.
c) ,I EVVhi❑G-M-WHUV-IEF I D\WZCELQR: [:&MVII
Community Facilities District, he/she shall be required to provide the City of
Fresno, Department of Public Works, with copies of signed acknowledgments
from each purchaser of a lot within the subdivision, attesting to the
purchasers understanding that the lot will have an annual maintenance
assessment and that he/she is aware of the estimated amount of the
assessment. The developer/subdivider shall execute and record a covenant
on each lot providing notice that the subject property is subject to annual
payment of the Community Facilities District assessment.
52. Should the City Council or owner/developer choose not to include all of the
maintenance items or certain items listed above in a CFD, then the property
RZ C-IlJG-IY WRYI EH❑ UM/SRQAEO I Rlr H\A DEQ/C1Q❑ D❑ ❑RP H❑2 Z CFU/-F-
Association (HOA) or other property based management mechanism which
provides for the maintenance of these items in a manner which provides
appropriate security and is deemed acceptable to both the City of Fresno
Development and Resource Management and Public Works Departments.
a) 7EHIIVLEGMG-UV E)MMAOEVOI]D❑❑RPH❑2ZCFWEI$Wociation (or other
approved mechanism) to perform the above listed maintenance
responsibilities pursuant to Article 40 of Chapter 15 of the Fresno Municipal
C o d e. 7 CHn HFA RI L&RY HCDCW i&R OM-5 HIAA FORC"&❑5 VT
described herein, shall among other things, specify level of effort, frequency,
and inspection of maintenance responsibilities, name the City as a third party
beneficiary for those provisions, and be subject to approval by the Director of
3❑EEF0 RUM/CDC -IE& W9ISq-iENIL2 IILce. Any amendment to the above
provisions or any other provision specifying any right of the City shall require
the prior written consent of the City.
NOTE: Should the owner/developer elect to establish a Home
2ZCHW-t$\A/F;FDBU-VRLSHURPLPDUDhEOnce obligations and assure
that said obligations are met, then the owner/developer may include
such other items as are deemed appropriate and necessary for the
sustainability of the subdivision and its amenities within the
responsibilities of the association.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 16
b) The proposed Declaration of Covenants, Conditions, and Restrictions
(CC&Rs) and the proposed instruments for the homeowners association shall
be submitted to the Development and Resource Management Department for
review prior to final map approval. Said documents shall be recorded with the
final map or alternatively submit recorded documents or documents for
recording prior to final acceptance of subdivision improvements. Said
documents shall include assignment of responsibility to the homeowners
association for landscaping and other provisions as stated in the
Development and Resource Management Department Guidelines for
preparation of CC&Rs dated September 01, 1994.
DEVELOPMENT FEES AND CHARGES
This project is subject to the following fees and charges:
a. Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control
District.
(Reference Fresno Metropolitan Flood Control District requirements
included herein above and notes below for further information)
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth)
c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth)
d. Trunk Sewer Charge [2] $344/living unit
Service Area: Fowler
e. Wastewater Facilities Charge [3] $2,119/living unit
f. Fowler Trunk Sewer Interim Fee Surety [1] N/A
g. House Branch Sewer Charge [2] N/A
WATER CONNECTION CHARGES FEE RATE
h. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by
owner; fee for service(s) and
Meter(s) established by the
Master Fee Schedule.
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 17
i. Frontage Charge [1] $6.50/lineal foot
j. Transmission Grid Main Charge [1] $643/gross acre
(parcels 5 gross acres or more)
k. Transmission Grid Main
Bond Debt Service Charge [1] $243/gross acre
(parcels 5 gross acres or more)
I. UGM Water Supply Fee [2] $1,738/living unit
Service Area: 501 s
m. Well Head Treatment Fee [2] $79/living unit
Service Area: 501
n. Recharge Fee [2] $56/living unit
Service Area: 501
o. 1994 Bond Debt Service [1] $93/living unit
Service Area: 501
CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE
p. Fire Facilities Impact Fee ❑Citywide [4] $539/living unit
q. Park Facility Impact Fee Citywide [4] $2278/living unit
r. Quimby Parkland Dedication Fee [2] $1120/living unit
s. Citywide Regional Street Fee [3] $8,361/adj. acre
t. New Growth Area Major Street Fee [3] $18,790/adj. acre
u. Police Facilities Impact Fee ❑Citywide [4] $624/living unit
u. Traffic Signal Charge [1] $450.94/living unit
v. Street Acquisition/Construction Charge [2] N/A
Conditions of Approval
Vesting Tentative Tract Map No. 6165/UGM
April 19, 2017
Page 18
Notes:
The proposed development shall pay drainage fees pursuant to the Drainage Fee
Ordinance prior to approval of the final map at the rates in effect at the time of such
approval. The fee indicated above is based on the tentative map. Please see the
attached memorandum from the Fresno Metropolitan Flood Control District (FMFCD) for
further information regarding considerations which may affect the fee obligation(s) or the
timing or form of fee payment.
On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008
❑ 023 requiring the payment of County Public Impact Facilities Impact Fees. The
effective date of this ordinance is September 20, 2008. Contact the County of Fresno,
Public Works and Planning Department to determine payment of this fee obligation.
Confirmation by the County of Fresno is required before the City of Fresno can issue
building permits. (The requirement to pay this fee is currently suspended by Fresno
County. However, payment of this fee may be required if the fee has been reinstated at
the time of issuance of building permits on the subject property.)
The Board of Directors of the Fresno County Regional Transportation Mitigation Fee
Agency approved Resolution No. 2009 ❑ 01 requiring the payment of Regional
Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010.
Contact the Council of Fresno County Governments (FCOG) to determine this fee
obligation. Confirmation by the FCOG is required before the City of Fresno can issue
building permits.
* Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8
Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to
arrive at the total number of Living Unit Equivalents.
**Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility
charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the
Department of Public Utilities, Wastewater Division, Environmental Services Section
(559-621-5153).
[1] Deferrable through Fee Deferral Covenant.
[2] Due at Final Map.
[3] Due at Building Permit.
[4] Due at Certificate of Occupancy.
DEPARTMENT OF PUBLIC WORKS
TO: Will Tackett, Planner III
DARM, Planning Division
FROM: Hilary Kimber, Parks Supervisor II (559.621.1345)
Public Works, Street Maintenance Division
DATE: October 7, 2016
SUBJECT: Tract 6165; 1471 South Fowler Avenue, 1279 South Fowler Avenue
(APN: 316-022-21) located on the north side of East Church Avenue between South Sunnyside
and South Fowler Avenues. The Department of Public Works has reviewed the Tentative Tract
Subdivision Map proposed by Yamabe & Horn Engineering, Inc., on behalf of Lennar Fresno Inc.
The Department of Public Works offers the following comments regarding the requirements for
landscaping and irrigation in the street right-of-ways, landscape easements, outlots and median
islands:
GENERAL REQUIREMENTS
STREET TREE REQUIREMENTS
1. The subdivider is required to provide street trees on all public street frontages per Fresno
Municipal Code and for the dedication of planting and buffer landscaping easements as
determined by the Planning Department. Street trees shall be planted at the minimum
rate of one tree for each 60' of street frontage or one tree per home (whichever is greater)
by the Developer. The subdivider is required to provide irrigation for all street trees. The
irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards
and AB 1881.
The designated street tree for South Sunnyside Avenue is:
Pistacia chinensis Chinese Pistache
The designated street trees for South Fowler Avenue are:
❑ELI❑[[[]❑LIFT I❑EEP ❑LE❑❑1LI❑❑❑❑ Autumn Applause Ash or
❑E❑EEI❑❑FTI❑EEP ❑EILEEE 1111❑ Autumn Purple Ash
2. Street Tree Planting by Developer: For those lots having internal street tree frontage
available for street tree planting, the developer shall plant one tree for each 60' of street
frontage, or one tree per lot having street frontage, whichever is greater. Tree planting
shall be within a 10' Public Planting and Utility Easement.
a. Street tree inspection fees shall be collected for each 60' of public street frontage or
one tree per lot whichever is greater.
b. Street trees shall be planted in accordance with the City of Fresno, Department of
1 C iJ ❑LLL 1N❑ED❑L117Sl-FHFDW❑EI7
c. Landscape plans for all public use areas, such as parkways, buffers, medians and
trails, shall be reviewed and approved by the Department of Public Works, Engineering
Services. A street tree planting permit shall be required for all residential street tree
planting.
d. Performance and payment securities, paid with final map, will be released when all
landscaping installed on public and/or city controlled property is in conformance with the
Specifications of the City of Fresno.
e. Upon acceptance of the required work, warranty security shall be furnished to or
retained by the city for guaranty and warranty of the work for a period of ninety days
following acceptance.
BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS
1. The subdivider shall provide long term maintenance for all proposed landscaped
areas by either petitioning for annexation in the Community Facilities District or by forming
D-::P H ❑EHWH EEEF1W❑❑
2. Maintenance Service Through Annexation into the Community Facilities District.
Landscape and Irrigation plans are required and shall be submitted to the Department of
Public Works for review and approval prior to a Council approval of the final map. Plans
shall be numbered to conform to and be included in the Department of Public Works street
construction plan set for the final map. Fees are applicable when the subdivider elects to
::D:-I[(D❑❑SDS ❑[P D[❑D❑]H❑ll!]QD❑d-IFF❑MNNVLViEEI ❑P P 11:1WDFOW=MVEW
A. Landscaping shall comply with Landscape Buffer Development Standards approved
by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with
Sections 12-306-23 & 24 and 14-121 of the Fresno Municipal Code regarding Water
Efficient Landscaping and Buffer landscaping.
B. Should the proposed landscape buffers and/or parkway strips be located next to an
existing buffer and/or parkway strip, the planting concept shall simulate the adjacent
landscape design to present a more uniform appearance on the street. Variances in the
landscape concept will be acceptable, but the design of the new landscape buffer and/or
parkway strip shall strive to mimic the existing as much as possible.
C. Landscape plans shall indicate grades on a cross-section detail to include fencing or
wall details. All fencing shall be placed outside the landscape easement. Maximum
slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of
the side walk and/or face of fence. Erosion control measures shall be implemented on all
slopes of 4:1, including the use of synthetic erosion control netting in combination with
ground cover species approved by the Department of Public Works/Engineering Services
Division.
D. The water meter(s) serving the buffer landscaping shall be sized for the anticipated
service flows.
E. No private flags, signs or identification of any kind shall be permitted in the right-of-way,
within the City - controlled easement or on the fence or wall facing the street.
F. Landscaping in the right-of-way and landscape setback adjacent to water well sites
shall be the responsibility of the City of Fresno Water Division and may not be included in
the CFD.
MEDIAN ISLAND LANDSCAPE REQUIREMENTS
1. When median islands front onto the proposed development project, applicants shall submit
Plans to the Public Works/Engineering Services showing the location and configuration of
all median islands fronting the proposed project.
2. The Public Works Department will review and evaluate existing median island(s) for a
determination of all required improvements prior to approval of Final Map.
3. Landscape and irrigation is required on all new construction of median islands and shall be
applied in accordance with the City of Fresno, Public Works Department Standards &
Specifications and FMC sections 12-306-24 and 12-306-23 and AB 1881. The Public
Works Department requires all proposed median islands to be constructed with a one foot
wide colored concrete strips, flush along curb edge, in a 12 inch by 12 inch brick red slate
pattern.
4. Trees shall not be planted in sections which are less than eight (8) feet wide unless
approved by the Public Works Department. Sections less than eight (8) feet shall be
capped with concrete as an integral part of the off site improvements, whether the median
is landscaped or not.
OUTLOTS
1. The Department of Public Works will not be responsible for the maintenance of any outlots
if they are not included into the Community Facilities District(CFD). If the outlots are to be
included into the CFD, the Department of Public Works will require approved landscape
and irrigation plans to be submitted with landscape buffer plans prior to inclusion into the
CFD.
2. Outlots which are utilized for water well purposes will not be included in the CFD. The
Water Division Department in Public Utilities will provide the maintenance of all plant
material on the well site.
City of
_ll��
ff �. s■,#
DATE: November 17, 2016
TO: Will Tackett
Development and Resource Management Department
THROUGH. Jill Gormley, TE, Traffic and Engineering Manager, City Traffic Engineer
Public Works Department, Traffic & Engineering Services Division
FROM. Louise Gilio, Traffic Planning Supervisor
Public Works Department, Traffic & Engineering Services Division
SUBJECT: Public Works Conditions of Approval
TT 6165, 1279 and 1471 South Fowler Avenue
High & Mighty Farms, Inc. / Yamabe & Horn Engineering, Inc.
The Public Works Department, Traffic and Engineering Services Division, has completed its review and
the following requirements are to be placed on this tentative map as a condition of approval by the Public
Works Department.
Provide the following information prior to the acceptance of the final map submittal. This can result in
additional conditions of approval.
1. Provide a cross section on the map for the proposed 54' street or construct the proposed
roadway to one of the Public Works Standard Drawings.
General Conditions:
1. Street Dedications: Provide corner cut dedications at all intersections for accessibility ramps.
2. Outlots: If the subdivider seeks to dedicate to the City, in fee, an outlot for open space
purposes, subdivider shall prove to the City that the outlot is free of toxic or hazardous materials
pursuant to the requirements of City Administrative Order 8-1, including, but not limited to,
performing a Phase I Soils Investigation. The soils Investigation report shall be submitted to the
Public Works Department for review and approval. The subdivider must obtain Public Works
approval of the soils investigation report and complete any mitigation work identified by the soils
investigation prior to subdivider's submittal of the Final Map to the Development Department.
Any and all costs associated of the soils investigation and any required mitigation work shall be
performed at the sole expense of the subdivider.
3. The construction of any overhead, surface or sub-surface structures and appurtenances in the
public right of way is prohibited unless an encroachment covenant is approved by the City of
Fresno Public Works Department, Traffic and Engineering Services Division, (559) 621-8681.
Encroachment permits must be approved prior to issuance of building permits.
4. Street widening and transitions shall also include utility relocations and necessary dedications.
5. Overhead Utilities: Underground all existing offsite overhead utilities with the limits of this map in
accordance with Fresno Municipal Code Section 15-4114 and Resolution No. 78-522/88-229.
Page 1 of 4
TATraffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6100\T-6165 FOWLER 1279 S\T-6165 FOWLER 1471 S doc
6. Submit a complete set of construction plans, as applicable, in a single package, to the Public
Works Department for review and approval. Examples: street construction, signing, striping,
traffic signal and streetlight.
Frontage Improvement Requirements:
Public Streets:
Fowler Avenue: Arterial
1. Dedication Requirements:
a. Dedicate 57' — 59' of property, from section line, for public street purposes, within the limits of
this application and continue south to Church Avenue, per Public Works Standards P-52 and
P-69. Includes the 12'_pattern for sidewalk.
b. Dedicate corner cuts for public street purposes at the intersection of Fowler and Pitt Avenues.
c. Relinquish direct access rights to Fowler Avenue from all lots within this subdivision.
2. Construction Requirements:
a. Construct concrete curb, gutter and sidewalk within the limits of this subdivision to Public
Works Standard P-5. The curb shall be constructed to a 12' residential pattern.
b. Construct concrete curb and gutter from the southern boundary of this map to Church Avenue.
c. Construct 20' of permanent paving within the limits of this subdivision and continue south to
Church Avenue.
d. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for
Arterial Streets.
Sunnyside Avenue: Collector
1. Dedication Requirements:
a. Dedicate 2' of property, for pedestrian or public street purposes to accommodate a 12' pattern
within the limits of this application, per Public Works Standards P-53, P-54.
b. Relinquish direct access rights to Sunnyside Avenue from all lots within this subdivision.
2. Construction Requirements:
a. Construct concrete curb, gutter and sidewalk, within the limits of this subdivision, to Public
Works Standard P-5. The curb shall be constructed to a 12' residential pattern.
b. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub-
division.
c. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for
Collector Streets.
Interior Streets:
1. Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-
sacs, easements and underground street lighting systems on all interior local streets to Public
Works Standard P-56. All driveways shall be constructed to Public Works Standards P-1 (54'
street) and/or P-4 (50' street) and P-6. Pedestrian easements are required behind driveways with
sidewalk patterns less than 10'.
2. All streets and pedestrian ways shall connect to other streets and pedestrian ways to form a
continuous vehicular and pedestrian network with connections within the subdivision and to
Page 2 of 4
TATraffic Plan ning\_CONDITIONS OF APPROVAL\TRACT MAPS\6100\T-6165 FOWLER 1279 S\T-6165 FOWLER 1471 S.doc
adjacent development. Pedestrian paths of travel must meet current accessibility regulations.
Sidewalks are recommended on both sides of the street. Identify ramps within the proposed
subdivision wherever sidewalks are provided.
3. Garage or carport setbacks are recommended to be a minimum of 18' from the back of walk or
curb, whichever is greater.
4. Provide a 10' visibility triangle at all driveways.
5. Design local streets with a minimum of 250' radius.
6. Local street-lengths exceeding 800' and four way intersections shall provide traffic calming
measures. Additional dedications may be required.
Specific Mitigation Requirements: This tract will generate 156 a.m. / 208 p.m. peak hour trips, based
on 208 single family residences. Comply with the mitigation measure requirements of the Traffic
Engineering Manager in TIS-16-021.
1. Relinquish direct vehicular access rights to
a. the north property line of lot 127.
b. the south property line of lots 1 and 126.
2. The intersection of Fowler and Pitt Avenues shall be designed with a full median opening to allow
for left turns-in and left turns-out.
3. The first order of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development.
4. Construct the entry at the intersection of Fowler and Pitt to Public Works Standard P-86.
Traffic Signal Mitigation Impact JSMII Fee: This project shall pay the current Traffic Signal Mitigation
Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in
the latest edition of the ITE Generation Manual for single family units (fee rate as shown in the Master
Fee Schedule).
Fresno Major Street Impact FMSI Fee : This Map is in the New Growth Area; therefore pay all
applicable growth area fees and City-wide regional street impact fees
Fresno Ma'or Street Impact(FIVISO Requirements:
Fowler Avenue: Arterial (New Growth Area)
1. Where not existing: Dedicate and construct one southbound 12' number one travel lane, one 12'
number two travel lane and a 5' shoulder within the limits of this subdivision and continue to
Church Avenue. Details of said street shall be depicted on the approved tentative tract map.
Dedication shall be sufficient to accommodate arterial standard and any other grading or
transitions as necessary based on a 55 MPH design speed.
Sunnyside Avenue-_Collector (Growth Area Street)
1. Where not existing: Dedicate and construct one northbound 12' number one travel lane, one 12'
number two travel lane, a 5' shoulder and a 12' center two-way left turn lane within the limits of
this subdivision. Stripe 200' left turn pockets at all major intersections. An additional 12' of paving
shall be required to accommodate the 250' left turn pockets. Dedication shall be sufficient to
accommodate additional paving and any other grading or transitions as necessary based on a 45
MPH design speed.
Page 3 of 4
TATraffic Plan ning\_CONDITIONS OF APPROVAL\TRACT MAPS\6100\T-6165 FOWLER 1279 S\T-6165 FOWLER 1471 S doc
Regional Transportation Mitigation Fee_(RTMF): Pay all applicable RTMF fees to the Joint Powers
Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200;
www.fresnococl.orq. Provide proof of payment or exemption prior to certificate of occupancy.
Page 4 of 4
TATraffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6100\T-6165 FOWLER 1279 S\T-6165 FOWLER 1471 S.doc
City of
CISCO&I �=
rf7� i V.;�4PUBLIC WORKS DEPARTMENT
City Nall Scott L.Mozier,P.E.
2600 Fresno Street,4'"Floor Public Works Director
Fresno,California 93721
Ph.(559)621-8800
www fresno gov
December 14, 2016
Will Tackett, Supervising Planner
Development and Resources Management Department
2600 Fresno Street, 3rd Floor
Fresno, CA 93721
SUBJECT: REVIEW OF THE TRAFFIC IMPACT STUDY (TIS) ADDENDUM 1 DATED
DECEMBER 5, 2016 FOR THE PROPOSED TRACT 6165, ON FOWLER
AVENUE BETWEEN CALIFORNIA AND CHURCH AVENUES
TIS 16-021, T6165
PROJECT OVERVIEW
We have reviewed the Traffic Impact Study (TIS) Addendum 1 dated December 5, 2016
prepared by Yamabe & Horn Engineering, Inc. for the proposed Tract 6165, "project", which
plans to develop an approximately 69.7 acres site with housing and retail uses. The TIS dated
October 2016' analyzed the project in phases. Phase 1 plans to construct 208 single family
dwelling units. Phase 2 proposes to construct 312 multi-family dwelling units; a 130 bed senior
assisted living facility; 27,500 square feet of office use; 80,000 square feet of retail uses; and
7,000 square feet of fast food restaurant uses. Addendum 1 dated December 5, 2016 proposes
to add the senior assisted living facility and single family/multi-family components to Phase 1.
The project site is currently vacant.
Addendum 1 evaluated the impacts at the intersections of Fowler and Church Avenues and
Fowler and Jensen Avenues during the AM and PM peak hours. Vehicle trips projected to be
generated by the project were calculated using the ITE Trip Generation Manual, 9th Edition. The
following table includes the daily (ADT), AM and PM peak hour trips projected to be generated
by the project in Phase 1:
Weekday
AM PM
Land Use Size ADT Peak Hour Peak Hour
In Out Total In Out Total
Single Family 208 DU 1,980 39 117 156 132 76 208
ITE Code 210)
Single Family 90 DU 857 17 51 68 57 33 90
ITE-Code-21 0)
Assisted Living 130 beds 346 12 7 19 13 16 29
ITE 254
Total Phase 1 3,183 1 68 _175 243 202 125 327
DU=dwelling units sf=square feet
Page 1 of 4
Based on the analyses included in the TIS, the study intersections are currently operating at or
above the TIZ III LOS D standard. With the addition of Phase 1 the project, the study
intersections are projected to continue to operate at or above the TIZ III LOS D standard.
The results of the analyses with approved/pending projects and cumulative growth are included
in the October 2016 TIS.
GENERAL COMMENTS and CONDITIONS
1. This project shall pay its Traffic Signal Mitigation Impact (TSMI) Fee of $47.12 per ADT,
per the Master Fee Schedule, at the time of building permit. Based on the Phase 1
weekday total ADT of 3,183 for the proposed project, the fee for Phase 1 would be
$149,982.96 payable at the time of the building permit. The Phase 2 fee of $398,493.84 is
based on the Phase 2 weekday total ADT of 8,457.
The TSMI fee facilitates project impact mitigation to the City of Fresno Traffic Signal
infrastructure so that costs are applied to each new project/building based on the
generated ADT. The TSMI fee is credited against traffic signal installation/modifications
and/or Intelligent Transportation System (ITS) improvements (constructed at their ultimate
location) that plan to build out the 2035 General Plan circulation element and are included
in the Nexus Study for the TSMI fee. The TSMI fee is regularly updated as new traffic
signals are added, new grant funds offset developer improvement costs, and/or
construction costs increase/decrease. If the project is conditioned with traffic signal
improvements in excess of their TSMI fee amount, the applicant may apply for fee credits
(security/bonding and/or developer agreement required) and/or reimbursement for work in
excess of their fee as long as the infrastructure is in place at the ultimate location. The
applicant should work with the Public Works Department and identify, with a Professional
Engineers estimate, the costs associated with the improvements prior to paying the TSMI
fee to determine any applicable fee credits and/or reimbursements.
For project specific impacts that are not consistent with the 2035 General Plan, Public
Works Standards, and/or are not incorporated into the TSMI fees, the infrastructure costs
will not be eligible for reimbursement unless the City Engineer and City Traffic Engineer
include the new traffic signal and/or ITS infrastructure in the next TSMI fee update and the
applicant agrees to pay the new TSMI fee that includes the new infrastructure. Failure to
pay this fee or construct improvements that are credited/reimbursable with this fee will
result in a significant unmitigated impact as this fee is applied to all projects within the City
Sphere of Influence.
2. This project shall pay its Fresno Major Street Impact (FMSI) Fee, which will be determined
at time of building permit. This FMSI fee is creditable towards major street roadway
improvements included in the nexus study for the FMSI fee.
3. The project shall pay the Regional Transportation Mitigation Fee (RTMF). Pay the RTMF
fee to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA
93721; (559) 233-4148, ext. 200; www.fresnocog.org. Provide proof of payment or
exemption, based on vesting rights, prior to issuance of building permits.
Page 2 of 4
4. The proposed project shall pay the $288 Traffic Impact Study review fee for review of the
document. Proof of payment shall be provided to the Traffic & Engineering Services
Division.
5. The proposed project shall widen Fowler Avenue to two (2) southbound through lanes
from the northern project boundary to the intersection with Church Avenue prior to
occupancy of Phase 1.
6. The proposed project shall construct a traffic signal with protected left-turn phasing at the
intersection of Fowler and Church Avenues prior to occupancy of any development in
Phase 2. The intersection shall also be modified to have the following configuration:
• Eastbound — one (1) left-turn lane, one (1) through lane and one (1) shared through-
right turn lane
• Westbound — one (1) left-turn lane, one (1) through lane and one (1) shared through-
right turn lane
• Northbound — one (1) left-turn lane, one (1) through lane and one (1) right-turn lane
• Southbound — one (1) left-turn lane, one (1) through lane and one (1) shared through-
right turn lane
7. The proposed project shall make modification to the traffic signal at the intersection of
Fowler and Jensen Avenues to include left-turn phasing on the northbound and
southbound approaches prior to occupancy of any development in Phase 2. The
intersection shall also be modified to have the following configuration:
• Eastbound — one (1) left-turn lane, one (1) through lane and one (1) shared through-
right turn lane
• Westbound — one (1) left-turn lane, one (1) through lane and one (1) shared through-
right turn lane
• Northbound — one (1) left-turn lane and one (1) shared through-right turn lane
• Southbound —one (1) left-turn lane and one (1) shared through-right turn lane
8. The proposed project shall make necessary improvements and right-of-way and public
easement dedications along adjacent public street(s) and within the site boundaries per
City of Fresno standards/requirements.
9. The proposed site plan shall be reviewed and approved by the City of Fresno Traffic &
Engineering Services Division, Traffic Planning Section.
Page 3 of 4
If you have any further questions regarding this matter, please contact me at (559) 621-8792 or
jill.gormley@fresno.gov .
Sincerely,
Jill mle , E
City Traffic Engineer/Traffic Engineering Manager
Public Works Department, Traffic & Engineering Services
C Copy filed with Traffic Impact Study
Louise Gilio,Traffic Planning Supervisor
Scott Tyler,Yamabe&Horn Engineering, Inc.
Page 4 of 4
City of
1EM1Een\14'\iiL
rn=---�0:--V,4po
DEPARTMENT OF PUBLIC UTILITIES
ADMINISTRATION DIVISION
MEMORANDUM
Date: October 25, 2016
To: WILL TACKETT, Supervising Planner
Planning and Development
From: KEVIN GRAY, Supervising Engineering Technician
Department of Public Utilities, Planning and Engineering Division
Subject: SEWER REQUIREMENTS FOR VESTING TENTATIVE TRACT MAP 6165, PLAN
AMEMDMENT APPLICATION No. A-16-014 AND REZONE APPLICATION No. R-16-
013
General
Plan Amendment Application No. A-16-014, Rezone Application No. R-16-013, and Vesting
Tentative Map of Tract No. 6165 were filed by Brian Yengoyan of Citadel Development Group,
on behalf of High and Mighty Farms, and pertain to ±78 acres of property located on the north
side of East Church Avenue between South Sunnyside and South Fowler Avenues. Proposed
is a comprehensive development comprised of a mix of uses including single family residential,
multiple family residential, assisted living, office, retail, and open space.
Plan Amendment Application No. A-16-014 proposes to amend the Fresno General Plan and
the Roosevelt Community Plan from Medium-Low Density Residential (±22 acres), Medium
Density Residential (±35 acres), Residential Multi-Family Urban Neighborhood (±15 acres),
Neighborhood Park (±6 acres) to Medium Density Residential (±50 acres), Residential Multi-
Family Urban Neighborhood (±18 acres), Community Commercial (±7 acres), and
Neighborhood Park (±3 acres).
Rezone Application No. R-16-013 proposes to amend the Official Zone Map to reclassify the 78
acres to
RS-5 (Residential Single Family, Medium Density) (±50 acres), RM-2 (Residential Multi Family
Urban Neighborhood) (±18 acres), CC (Commercial-Community) (±7 acres), P (Neighborhood
Park) (±3 acres).
Vesting Tentative Map of Tract No. 6165 is a request to subdivide the subject property into a
208-lot conventional single family residential subdivision with public streets.
Sewer Requirements
The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main located
in South Fowler Avenue, 15-inch main located in South Sunnyside Avenue, 48-inch trunk
located in East Church Avenue. Sewer facilities are available to provide service to the site
subject to the following requirements:
1. Connection to the existing 48-inch sewer trunk in S. Fowler Avenue shall not be
allowed.
2. Installation of sewer house branch(s) shall be required.
4U i�
`A A A Nationally Accredited Public Utility Agency
4�w P
3. Separate sewer house branches are required for each lot.
4. Sanitary sewer connection to the existing 48-inch Trunk in Church Avenue shall be
required for parcel C only.
5. Abandon any existing on-site private septic systems.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge.
2. Oversize Sewer Area: 35.
3. Trunk Sewer Charge: Fowler
4. Sewer Facilities Charge (Residential).
City of
.S'IN!i ii
DEPARTMENT OF PUBLIC UTILITIES —WATER DIVISION
MEMORANDUM
DATE: October 6, 2016
TO: WILL TACKETT, Supervising Planner
Development and Resource Management Department — Current Planning
THROUGH: MICHAEL CARBAJAL, Planning Manager
Department of Public Utilities —Water Division
FROM: ROBERT DIAZ, Senior Engineering Technician-.,A Vo
Department of Public Utilities — Water Division
SUBJECT: WATER REQUIREMENTS FOR VESTING TENTATIVE TRACT T-6165,
REZONE APPLICATION R-16-013 AND PLAN AMENDMENT A-16-014
General
Plan Amendment Application No. A-16-014, Rezone Application No. R-16-013, and
Vesting Tentative Map of Tract No. 6165 were filed by Brian Yengoyan of Citadel
Development Group, on behalf of High and Mighty Farms, and pertain to x-78 acres of
property located on the north side of East Church Avenue between South Sunnyside
and South Fowler Avenues, South Fowler Avenue, 1279 South Fowler Avenue & APN:
316-022-21 . Proposed is a comprehensive development comprised of a mix of uses
including single family residential, multiple family residential, assisted living, office,
retail, and open space.
Water Service
The nearest water mains to serve the proposed project are a 14-inch main located in
East Church Avenue, a 14-inch main located in South Sunnyside Avenue and a 14-inch
main located in South Fowler Avenue. Water facilities are available to provide service
to the site subject to the following requirements:
1. Construct a 14-inch water main (including fire hydrants) from the existing 14-inch
main located in South Fowler Avenue from East Church Avenue north to the
existing 14-inch water main in South Fowler Avenue.
2. Separate water services with meter boxes shall be provided to each lot.
3. Destruct any existing on-site well in compliance with the State of California Well
AWL'
2 A Nationally Accredited Public Utility Agency
a4v�:
Standards, Bulletin 74-81 and 74-90 or current revisions issued by California
Department of Water Resources and City of Fresno standards.
4. Two independent sources of water, meeting Federal and State Drinking Water
Act Standards, are required to serve the tract including any subsequent phases
thereof. The two-source requirement may be accomplished through any
combination of water main extensions, construction of supply wells, or other
acceptable sources of water supply approved by the Assistant Public Utilities
Director.
5. Engineered improvement plans prepared by a Registered Civil Engineer are
required for proposed additions to the City Water System.
6. All Public water facilities shall be constructed in accordance with The Department
of Public Works standards, specifications, and policies.
Water Fees
The following Water Connection Charges and fees shall be paid for the project.
1. Wet-ties, Water service(s) and/or meter(s) installation(s)
2. UGM Water Supply Area Number: 501s
City of
ff -;,O._
FIRE DEPARTMENT
DATE: October 28, 2016
TO: Will Tackett, Supervising Planner
Development Department/Current Planning
FROM: BYRON BEAGLES, Fire Prevention Engineer
Fire Department, Prevention Technical Services Division
SUBJECT: VESTING TENTATIVE TRACT MAP NO. 6165, A-16-14, R-16-013,
TENTATIVE PARCEL MAP 2016-05
Proposed project is a standard 36 foot wide public street 208 lot single family home sub-
division adjacent to 4 large parcels proposed for various commercial and residential uses
that will be submitted for additional entitlements at a future date.
1. The 6.6 acre Community Commercial parcel is more than 2.0 miles from Fire
Station 15 and all buildings constructed on this parcel must have fire sprinklers
installed regardless of square footage.
2. Provide public fire hydrants per Public Works Standards for single family home
residential development. The fire hydrant system shall be in service before
delivery of lumber on site unless otherwise approved with a temporary water
supply for model home construction only.
3. Two means of emergency access must be available during construction.
Access roadways during construction shall be paved or provided with an all-
weather driving surface approved by the Fire Department. All construction work
on this project is subject to interruption if the road system becomes impassable
for fire apparatus
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No,210.45
NOTICE OF REQUIREMENTS
Page 1 of 4
PUBLIC AGENCY DEVELOPER
WILL TACKETT BRIAN YENGOYAN,CITADEL DEVELOPMENT on
DEVELOPMENT SERVICES/PLANNING GROUP,INC.
CITY OF FRESNO 1589 W.SHAW AVE.
2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93711
FRESNO,CA 93721-3604
PROJECT NO: 6165
ADDRESS: NWC CHURCH AND FOWLER 04
APN: 316-022-21 SENT: I I
Drainage Area(s) Preliminary Fee(s) Development Review Fee(s)
Service Charge(s)
BH $307,330.00 NOR Review $1,774.00 To be paid prior to release of District comments to Public
Agency and Developer.
Grading Plan Review $4,950.00 Amount to be submitted with first grading plan submittal. 0
Total Drainage Fee: $307,330.00 Total Service Charge: $6,724.00 Mal
The proposed development will generate storm runoff which produces potentially significant environmental impacts and which
must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental
Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood
Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the
drainage related CEQA/NEPA impact of the project mitigation requirements.
Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of
Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by
Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first
submittal.The Storm Drain Plan fee shall be paid prior to return/pick up of first submittal.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit
at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/17 based on the site plan
submitted to the District on 10/04/16 Contact FMFCD for a revised fee in cases where changes are made in the proposed site
plan which materially alter the proposed impervious area.
Considerations which may affect the fee obligation(s)or the timing or form of fee payment:
a.) Fees related to undeveloped or phased portions of the project may be deferrable.
Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under
b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that
configuration.
c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee
obligation.
When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation,
e') reimbursement will be made for the excess costs from future fees collected by the District from other development.
Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the
f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or
5%of the refund whichever is less will be retained without fee credit.
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
Approval of this development shall be conditioned upon compliance with these District Requirements.
1. — a. Drainage from the site shall BE DIRECTED TO
X b. Grading and drainage patterns shall be as identified on Exhibit No. 1
_ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and
C. Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities
located within the development or necessitated by any off-site improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. 1 as "MASTER PLAN FACILITIES TO BE
CONSTRUCTED BY DEVELOPER".
X None required.
3. The following final improvement plans and information shall be submitted to the District for review prior to final
development approval: Mi
X Grading Plan
X Street Plan 1W
Storm Drain Plan
X Water&Sewer Plan
■
X Final Map
X Drainage Report(to be submitted with tentative map)
Other
None Required
4. Availability of drainage facilities:
_ Permanent drainage service is available provided the developer can verify to the satisfaction of the City
a' that runoff can be safely conveyed to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service.
C. Permanent drainage service will not be available. The District recommends temporary facilities until
permanent service is available.
X d. See Exhibit No.2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate
Maps available to the District,necessitating appropriate floodplain management action.(See attached
Floodplain Policy.)
X Does not appear to be located within a flood prone area.
6. _ The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water,
and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site
development may not interfere with the ability to operate and maintain the canal or pipeline.
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with on
Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing
one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant
Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the
discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards.
These requirements apply both to pollutants generated during construction,and to those which may be generated by
operations at the development after construction.
a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July
1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and
disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part
of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent
and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources
Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate
non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and
complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April, 1997
(available at the District Office). A State General Industrial Permit is required for specific types of
industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The
following categories of industries are generally required to secure an industrial permit:manufacturing;
trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and
implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine
site inspections,train employees in permit compliance, sample storm water runoff and test it for pollutant
indicators,and annually submit a report to the State Board.
c. The proposed development is encouraged to select and implement storm water quality controls
recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction
Guidelines(available at the District Office)to meet the requirements of the State General Permits,
eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible
minimize contact with materials which may contaminate storm water runoff.
8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District
within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to
accommodate changes made in the proposed development by the developer or requirements made by other agencies.
10. X See Exhibit No.2 for additional comments,recommendations and requirements.
Debbie Campbell Gary W. Chap<)l
Design Engineer Project Engineer
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
CC:
JAMES K.O'LOONEY,HIGH&MIGHTY FARMS,INC. mn
4650 N.DEL MAR AVE.
FRESNO,CA 93704 Xm
YAMABE&HORN ENGINEERING,INC.
1300 E.SHAW AVE.,SUITE 176
FRESNO,CA 93710
0
■
ML
C)
ul
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
NOTE:THIS MAP IS SCHEMATIC.
DISTANCES,AMOUNT OF CREDITABLE
FACILITIES,AND LOCATION OF INLET
BOUNDARIES ARE APPROXIMATE.
\A L
o
VE
_
-1l
"AVEL —
I
�y_���.�_ T_ 4CAIE FJiORENCE- jA)AVE,.,
j
T F AVEV—
�z �ROVCE li
7
J)
-------- I TRACT T 165
\11BW
F-In
11BL11
24
36 24
I
IF-1 L Ll
UGENLAI
r
Ic _T1
_� - G
-- ISMS I 7 I -�_�_ __ - !
-
�1
rA
U
�!RIVS AVE
i TT7� i i v ,777T7r------/-`// F—F-77-1 Pr..—.
1 ! T1
LEGEND
-0
Existing Temporary Inlet To Remain
13— Existing Master Plan Facilities
❑ Future Master Plan Facilities
Inlet Boundary 1 400'
Drainage Area Boundary
Direction Of Drainage
TRACT 6165
DRAINAGE AREA "BH"
lr
2EXHIBIT NO. 1 oiml FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
Prepared by:wadet
Date:10/31/2016
Path:K:\Autocad\DWGS\OEXHIBI'RTRACTS\6165.mxd
OTHER REQUIREMENTS
EXHIBIT NO. 2
The District's existing Master Plan drainage system is designed to serve medium density
residential uses and the existing Master Plan storm drainage facilities do not have capacity
to serve the proposed land use. The developer shall be required to mitigate the impacts of
the increased runoff from the proposed use to a rate that would be expected if developed to
medium density residential. The developer may either make improvements to the existing
pipeline system to provide additional capacity or may use some type of permanent peak
reducing facility in order to eliminate adverse impacts on the existing system. Should the
developer choose to construct a permanent peak-reducing facility, such a system would be
required to reduce runoff from a ten-year storm produced by the proposed land use, to a
two-year discharge which would be produced by the property if developed medium density
residential. Implementation of the mitigation measures may be deferred until time of
development.
Lot coverage must be provided to the District prior to submittal of improvement plans. The
final drainage fee will be calculated commensurate with the lot coverage provided by the
developer. If the lot coverage indicates a density higher than Master Planned, mitigation
may be required. The lot coverage calculated by the District includes the front yard
walkway, sidewalk walkway and the rear yard patio equaling an additional 6% of
impervious area in addition to the City's typical lot coverage calculation.
Permanent service for the west half of the proposed tract is available through temporary
facilities located at Church and Sunnyside Avenues. Our records indicate that there may not
be continuous existing curb and gutter to convey runoff to the temporary inlet
locations. The developer shall be required to provide documentation and/or improvements
satisfactory to the City of Fresno to allow for conveyance of storm water to the inlet
locations.
The District recommends a stub street or other means of conveyance to provide surface
drainage from the east side of proposed Tract 6165 to the temporary facilities located at
Stanford and Church Avenues. If a stub street or other means of conveyance is not provided
to Church Avenue for the east side of the proposed tract then the District recommends
temporary facilities until permanent service is available.
Development No. Tract 6165
k:\permits\exhibit2\tracts\6165.docx(gc)
2(o,N5 ���►�s"
CITY OF FRESNO - DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT
REQUEST FOR COMMENTS AND ENVIRONMENTAL ASSESSMENT,
AND ENTITLEMENT APPLICATION REVIEW OF
PLAN AMENDMENT APPLICATION NO. A-16-014
REZONE APPLICATION NO. R-16.013
VESTING TENTATIVE MAP OF TRACT NO. 6165
Return Completed Form to:
Will Tackett, Development Services/Planning
M � Email: Will.TackettP-fresno gov
l Development and Resource Management
2600 Fresno Street, Third Floor
Fresno CA 93721-3604
PROJECT DESCRIPTION AND LOCATION:
Plan Amendment Application No. A-16-014, Rezone Application No. R-16-013,and Vesting Tentative
Map of Tract No. 6165 were filed by Brian Yengoyan of Citadel Development Group, on behalf of High and
Mighty Farms, and pertain to ±78 acres of property located on the north side of East Church Avenue
between South Sunnyside and South Fowler Avenues. Proposed is a comprehensive development
comprised of a mix of uses including single family residential, multiple family residential, assisted living,
office, retail, and open space.
Plan Amendment Application No. A-16-014 proposes to amend the Fresno General Plan and the
Roosevelt Community Plan from Medium-Low Density Residential (±22 acres), Medium Density Residential
(±35 acres), Residential Multi-Family Urban Neighborhood (±15 acres), Neighborhood Park (±6 acres)
to Medium Density Residential (±50 acres), Residential Multi-Family Urban Neighborhood (±18 acres),
Community Commercial (±7 acres), and Neighborhood Park (±3 acres).
Rezone Application No. R-16-013 proposes to amend the Official Zone Map to reclassify the 78 acres to
RS-5 (Residential Single Family, Medium Density) (±50 acres), RM-2 (Residential Multi Family Urban
Neighborhood) (±18 acres), CC (Commercial-Community) (±7 acres), P (Neighborhood Park) (±3 acres).
Vesting Tentative Map of Tract No. 6165 is a request to subdivide the subject property into a 208-lot
conventional single family residential subdivision with public streets.
APN: 316-022-21 ADDRESS: 1471 South Fowler Avenue, 1279 South Fowler Avenue (Tract only)
DATE ROUTED: September 30, 2016 COMMENT DEADLINE: October 14, 2016
Preliminary Meeting of the SUBDIVISION REVIEW COMMITTEE:
1:30 PXI . TUESDAY October 11 201l CITY HALL-THIRD FLOOR SOUTH ROOM 3054
Meeting of the SUBDIVIISION REVIEW COMMITTEE WITH SUBDIVIDER AND PROJECT ENGINEER:
1:30 P.M. TUESDAY October 25,2016, CITY HALL-THIRD FLOOD SOUTH ROOM 3054
Your attendance at the review meetings will be appreciated. If you are unable to attend and you have
comments you wish to make, please forward your comments to Will.Tac cett@fresno.gov. prior to the
meeting date of October 11, 2016; or mail the comments to Development and Resource Management
Department, Development Services/Planning, 2600 Fresno Street, Room 3043, Fresno, California 93721-
3604. Thank you.
co
1856 DEPARTMENT OF PUBLIC HEALTH
6 DAVID POMAVILLE, DIRECTOR
FRE`'
2 FZi U
/8
:D07DFNW
Hh90RHRi1KBH0DQ91 PHQ/
)HWU
)HR
HDUODFNW
352-(&180e,5$77
30DQI-I1jHQED1WHQ$)EDS 5DQHWIW
ODRDFTR BHDHE Q146OHh ORHIN EHE)ONQ
0jPB0Q0WH®QRDKW HWQH
EHZ,hW1XQDQR)8H10W9 9 FR9H10E3 90RHQ/
FR®®PtKM1PXRHDP0iI1dQ0 PX0RHDPDV1RQ0DZG1Q
RHHRDDQOFH
30DQHIJI-IQEDIM 9WHWHVQD030DQ1W
5Mh901APXWDQ0H9P/E1RHUQ0" DFHUHgPHW
5H®Q0DFHBHHQ00X0VDP0$8DQH1R ]FHTH NDIN
DFHQHGPHW112Q,01DFHVH12Q,00 X0jPP0$9DQH13
DFHZPXQPHBDODFHUQ H1E1DW DFHV
5HQl$)ED1 R WWHWEDOQODBFOD*D FHM
56 Residential Single Family, Medium DensityDFUH Residential Multi Family Urban
NeighborhoodDFUY Commercial-CommunityDFUH Neighborhood ParkDFUkf
90SRODFW 0UJUW38URSHRDi9W
FRWi0PDfiWRW 1"V
PWIN 6�0,*DFRQ
6IRPPf1hWSSUR00
x 991FROUPWNSPEWRRI DMD I10
FRPPE1kWWDSDFEWEWW FURMFR WUW0
RRQRPR0kWk1FI1 QR&DUJWQ RUQQ?HRMWEJK
)RUPRUQUPDRi DO
x I. QWHQ6PRU9SPMWRRDkf UDEd®FDSDFEWQ0
D2kWB PPFRWWWaRSRQ URPR@UQ®QDW
ffi&QR&DUJ%UPRUQUPD06RJ4FW RDW
x 8URSR6RQVHQURMREW RRWRkf OUR9ME►
8aD"ARk1WDBRS
Promotion,preservation and protection of the community's health
1221 Fulton Mall/ P.O. Box 11867/ Fresno, California 93775/ Phone (559) 600-3271 / FAX (559) 455-4646
Email: EnvironmentalHealth@co.fresno.ca.us TM www.co.fresno.ca.us TM www.fcdph.org
Equal Employment Opportunity TM Affirmative Action TM Disabled Employer
San Joaquin Valley q Z. - or
AIR POLLUTION CONTROL DISTRICT H EALTHY A I R LIVI N G'
JAN 3 0 2017 RECEIVF11)
Planning Department FEB 0 1 2017
City of Fresno DEVELOPMENT DEPARTMENT
2600 Fresno St., 3rd Floor CITY OF FRESNO
Fresno, CA 93721-3604
Re: Air Impact Assessment (AIA) Application Approval
ISR Project Number: C-20160269
Land Use Agency: City of Fresno
Land Use Agency ID Number: Unknown
To Whom It May Concern-
The San Joaquin Valley Air Pollution Control District (District) has approved the Air Impact
Assessment (AIA) application for The Oaks project located at 1471 South Fowler in
Fresno, California. Pursuant to District Rule 9510, Section 8.4, the District is providing the
City of Fresno with the following information:
• A notification of AIA approval (this letter)
• A statement of tentative rule compliance (this letter)
■ A summary of project emissions and emission reductions
• A summary of the off-site mitigation fees
■ A copy of the Air Impact Assessment application
• An approved Monitoring and Reporting Schedule
Certain emission mitigation measures proposed by the applicant may be subject to
approval or enforcement by the City of Fresno. No provision of District Rule 9510 requires
action on the part of the City of Fresno; however, please review the enclosed list of
mitigation measures and notify the District if the proposed mitigation measures are
inconsistent with your agency's requirements for this project. The District can provide the
detailed emissions analysis upon request.
Seyed Sadredin
Executive Director/Air Pollution Control Officer
Northern Region Central Region(Main Office) Southern Region
4800 Enterprise Way 1990 E.Gettysburg Avenue 34946 Flyover Court
Modesto,CA 95356-8718 Fresno,CA 93726-0244 Bakersfield,CA 93308-9725
Tel:(209)557-6400 FAX:(209)557.6475 Tel:(559)230.6000 FAX:(559)230-6061 Tel:661.392-5500 FAX:661-392-5585
www.valleyair.org www.healthyairliving.com
PrmcC cn mcycicC acper
Page 2
If you have any questions, please contact Ms. Sharla Yang at (559) 230-5934.
Sincerely,
Arnaud Marjollet
Director of Permit Services
Brian Clements
Program Manager
AM: sy
Enclosures
N N
o vo u� r- mo ? 00000O `, „tea 00000 (D000000
000000 "'" 00000 00 oaoo
r- 00 (D °O •o 000000 00000 00 oOoOa
n rw OO .0O0 . '000000 (O IL OOoOo . 0,000000
o p a OO �00011 '00OOoo � o a n00nQ C) aOoOC rm
N 2
7 9
O n6
Ix
(D t� N O (D M•O O O O•01.1m ,��' O O O O O 00 0 0 0 0 0 O W
X ISO (D•O 000'OOoo x 00000h 000000 n
p o (V V O � V•OOOO.00M p 00000 000000 a
C z I- (D A U) W OO O O OO M Z 00000 . 00000 0 N
O OO OOON 0000.00M O aOOOa �T OC? Oa OO
V
W
t a
Q y tl1 N
a � NM � a � [vM v mm - mrn � � � a
N ~ F°- y ~
N N
d w O o 0 0 0 0 0 0 0 0 0 0 o a d d 0 0 0 0 0 0 u> 0 0 0 0 0 0
Y! 0 0 0 0 0 0 0 0 0 0 0 0 •7-'' (� O O O O O 0 0 0 0 0 0
y0 0 0 0 0 0 0 0 0 0 0 0 C •j j) C O O O O O R O 0 0 0 0 0
O O O O O O O O O O O o p O' 0 0 0 0 0 0 0 0 0 0 0 0 0
0) p w 0 0 0 0 0 0 0 0 0 0 0 0 0 ) p 0 0 0 0 0 0 0 0 0 0 0 (j
4:
N N
w d 0 v 0 �n n co 0 0 0 0 0 0 0 W d 0 0 0 0 0 0 0 0 0 0 0 0 o O
> " N n m in v� v o 0 0 0 0 0 o N > y " H o 0 0 0 0 0 0 0 0 0 0 00
d y v C m m � t0 0 0 0 0 0 o O N d r d c 0 0 0 0 o N O 0 0 0 0 0 N
t c 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl t c w O O O O O 0 0 0 0 0 0
d =o 0 0 0 0 0 0 0 0 0 0 0 o d p
po 0 0 0 0 a o 0 0 0 0 0 v
o Q o Q
a ' d a 9 d
r c 10 N O O O O M r C O O O
m co N O G7 0 O O M O O O M
Im
p F QO1 O O O O O GO M y F O O O O p
y+ "" m 0 0 0 Oo O 0 O 0 "" m o C O N
d
L
W r w
L
to Cw 0 n w 00 O
N H O O O O n N ~ O O to t
0 O O O
0 0 0 0 .E m m - M O 0 0 M
� c m c
0 � 7
A
E N h
0 O O O O O O O O O O O O ip d w 0 0 0 0 0 0 ao 0 0 0 0 0 0 co
(/) c 0 0 0 0 0 0 0 0 0 0 0 0 'O N O O o o O n 0 0 0 0 0 0
W V C 0 0 0 0 0 0 0 0 0 0 0 0 'O •� y j� C 0 0 0 0 0 v 0 0 0 0 0 0
Q O O o 0 0 0 0 0 0 0 0 0 0 0 .o Q
C p o 0 0 0 0 0 0 0 0 0 0 0 ,0 p p Y. o 0 0 0 o v o 0 0 0 0 0
y N
N 0 c + c
d w 0 N n N 0 fD 0 0 0 0 0 0 0 (� d Y 0 0 0 0 0 0 m O O O O O o M
E 'y > (� n 0 0 0 0 0 0 0 0 'N > N 0 0 0 0 0 IO 0 0 0 0 0 0 to
W y j� C O N O N O O O O O O 007 L d N V C O O O O O 0 0 0 0 0 0 V
N t c O y n fO N O O O O O O O a t c O y 0 0 0 0 0 0 0 0 0 0 0 pp
1
" 0 .0
0 0 0 0 0 0 0 0 0 0 0 0 ,N d p 0 0 0 0 0 0 0
1C Q K N x Q K
N w ❑ G ❑
C fl Z .0 d Z 9 d
❑ �d„ c rn n o 0 0 o N Y c o 0 o r
y U) w o co 0 0 0 .� N m } ro 0 0 0 CO
E 7 m y a m y o v o o $ m m w a 0 0 0
w �' O O .Oj W �' m ~ N O O O
lL N m m
L �
� Q ❑ d d D d d
Y (O p 00 � L�, p�_ Y n o 0 o M
0� O C C += N O r N f00 O O S Q1 + w F W O O O 000
L (/) (O .❑ E m `-' N M N N O O O O 'N � E A �-+ N O O O Cj
� L ` O 7 m ❑ j m
2 I- LL N
C �
j 0 N N N N N 0 0 O « ` 0 N 0 0 0 y�
O
t O t'
mc Q O O O Q z z z F- G z z z F
p (n O O O O O 0 O O p (� O
V
d d
y L N L
a a
c c
J J
d
U
5 S 0
Vl ppopp n drdm EE E mz O w Z o 4
2
do ¢ a0acz O O ❑ O O o 66 E
w a C C 0 0 0 O L NE 0}`m-
0.
ma O a d L m 0 HN
d Y N C
E N 0- a
wo
m m m m °a a
c Z J a a a a as iii �M�
N L
� ami ami = °Ji a N a a
.a O O 0. t o
Q d a 0 a a
a o O S S
O O O N N O G
N p p w N
C
N O O N N G pp
W p p N N
a
a
0
o g
O O
J W
G S S o am
C W N O O O
O O S N G O
O U N p O N N
v' N
v
IV
U
M
c W
v W
^ LL
N m o 0 S S 0
M O O O N N o G w
W N G C N N W
J V/
m r+
Q
H �
c
• � t0 b m
C N n A N
N VV Q M N N O
N
T �Q5�Q5�p5 5�5�g g �p5 px p
O Q D O O 8 8 O O M M c gOp
a N O a O d O O N N
N
N
y O
0 0 0
O O O N M N C
Y j N O O N
E
N
0 O
W
� N �
~ N m
M
U)
w m N o 0 0 0 G 0 O 9 O i c4 M N 1Op w
d ~ a N Z N N N N N
N
r fL
LL O O r�r pp
Z
o a al r S
c a d
L E rcV d� '-
Q
< LU
�= dfi dd occ d ddddddd.rS dtl v i Ni T Q ~
o W a
O LL
❑ e o
C CN ' z(y Z Y Z R 2 Z x 0.T 0.Z x 0. 2 a
O.N C a°
W
E °a
c� o o " 1 1 p� w w L o O o 0 0 0
�y a N Q i q n m
O y S 2 2 2 2 2
O Y._ w y a • 4 A Z Z Z 2 2 2
w �+ U U U U U o O O O O O O
Y Fi O a N D p 0 D 1o a
3 y Z O A m o OO O O O O o
2 2 2 2 2 2 o
z z z z z z a M
�.•e d m V M O O O O O O
CD cl W
d o
C
~ U V d S2 a N M O N b A m N O N Z OI
O
C C �
O O N ' p
ILq
cu W rn c sem'
'4 a pLU LU v
3 d a s
a' W -En d E A O
LL a 'c n n 1 2. c $ a ❑ c
L ZOW
U � -MW n m ry m O a a d d 'g
y N N N $ •[ m a 9
E T N
Z q 'r O O O N J J d a O O O
y� ❑ Y L L a H H dd d d N R U V N
C C N NUNC d d H d �' L uN� uN� a 0. dN d
0. A a A R a 6 Q yl
ry�j q J � r L L � 6 6 C 6L
SC NJ L e a
N N w w R N
a � H F — —
. .� O r
c O T
a a
q a a Z r
M® A`
San Joaquin Valley Air Pollution Control HEALTHY
District AIR
Indirect Source Review (ISR) - Air Impact Assessment (AIA) LIVING
Application Form
A. Applicant Information
Applicant/Business Name: High&Mighty Farms,Inc.
Mailing Address:4650 N.Del Mar Ave. City: Fresno State: CA Zip: 93704
Contact:James K O'looney Title: Secretary&Treasurer
Is the Applicant a licensed state contractor? ®No ❑ Yes,please provide State License number:
Phone: 858-361-7355 Fax: 559-229-4741 Email:james.olooney@gmail com
B. A ent Information (if applicable)
Agent/Business Name: Citadel Development Group,Inc.
Mailing Address: 1589 west Shaw,suite 8 City: Fresno State: CA Zip: 93711
k
rian Yengoyan Title: CEO
9-360-1471 Fax:NA Email: brian@citadeldg.com
t is signing the Air Impact Assessment Application on behalf of the Applicant, a signed letter from the Applicant giving the
horization is r, wired.
ect Information
ame: The Oaks Tract Number(s)(if known): 6165
cation Street: 1471 South Fowler City: Fresno Zip: 93727
Cross Streets: Church Ave&Fowler Ave County: Fresno
Permitting Agency: City of Fresno Planner:Will Tackett
Mailing Address: 4650 N.Del Mar Ave. City: Fresno State: CA Zip:93704
Permit Type and Number(if known):NA Last Discretionary Approval Date:NA
D. Project Description
Please briefly describe the project(e.g.,, 300 multi family residential units apartments and 35,000 square feet of commercial uses):
This is a mixed-use planned development that will include approx.285 single family units and 300 multifamily housing with 6.6 ac commercial
retail and office services that will all be connected by a 2.8ac central park.See the attached land plan.
rPlease check the box next to each applicable land use below: Select land use setting below:
ommercial/Retail ❑ Light Industrial ® Residential ❑ Other
ffice ❑ Heavy Industrial ❑ Recreational
El Government ❑ Educational El Urban ® Rural
❑ Medical
E. Notice of Violation F. Voluntary Emission Reduction Agreement
Is this application being submitted as a result of receiving a Is this project part of a larger project for which there is a Voluntary
Notice of Violation(NOV)from the District? Emission Reduction Agreement(VERA)with the District?
® No El Yes,NOV# ® No
❑ Yes,VERA#
GH02tional Section
Dant to receive information about the Healthy Air Living Business Partners Program? ® Yes ❑ No
FOR APCD USE ONLY
Central Region Office: 1990 E.Gettysburg Ave. Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB www,valleyair.org
Page 1 of 13 Form ISR AIA Revised August 4,2016
Filing Fee Check Date Stamp: Finance Date Stamp: Permh
Received-1-707.07. �U # JVE
: nCE
Date Paid: Project
Applicant#.-_Q- 3aa(oa3 2 7 2016
f;rgftS ,3BFViC9S
[Additional
Esheets
d Owner Information
-00 Format) Gross Acres Land Owner
2-21 77.89 High&Mighty Farms 50%,Courthouse California 5/12,Ruth Martori
Non-QTIP Marital Trust 1/12
ting APN numbers can be found on the Distiict's website at www.vzllevair.org.
I. Project Development and Operation
Will the project require demolition of existing structures? ❑ Yes,complete I-1 ® No,complete I-2
1-1. Demolition
Total square feet of building(s)footprint to be demolished: Number of Building Stories:
Demolition Start Date(Month/Year): Number of Days for Demolition:
1-2. Timing
Expected number of work days per week during construction? Will the project be developed in multiple phases?
❑ 5 days ❑6 days ❑7 days ® Yes,complete I-3
p ❑ No,complete I-4
1-3. Phased Site Development and Building Construction
In addition to the information below the applicant may submit a phase specific activity timeline. The phase specific activity timeline
form can be found on the District's website at�w w.valle air.org.
Start of Construction(Month/Year): 8/2017 Gross Acres:39.6
1
End of Construction(Month/Year):8/2021 Net Acres(area devoted to buildings/structures):37
First Date of Occupation(Month/Year):8/2018 Paved Parking Area(#of Spaces):NA
Building Square Footage: NA Number of Dwelling Units:208
Start of Construction(Month/Year):8/2019 Gross Acres: 15
2 End of Construction(Month/Year): 8/2022 Net Acres(area devoted to buildings/structures): NA
First Date of Occupation(Month/Year): NA Paved Parking Area(#of Spaces): NA
Building Square Footage:NA Number of Dwelling Units:Approx: 180
Start of Construction(Month/Year): 8/2022 Gross Acres: 12
3 End of Construction(Month/Year): 1/2024 Net Acres(area devoted to buildings/structures):NA
First Date of Occupation(Month/Year):NA Paved Parking Area(#of Spaces): NA
Building Square Footage:NA Number of Dwelling Units:Approx:190
Start of Construction(Month/Year):8/2024 Gross Acres: 6.6
4 End of Construction(Month/Year): 8/2025 Net Acres(area devoted to buildings/structures): NA
First Date of Occupation(Month/Year): NA Paved Parking Area(#of Spaces): NA
Building Square Footage: NA Number of Dwelling Units: 0
5 Start of Construction(Month/Year): Gross Acres:
Central Region Office: 1990 E.Gettysburg Ave.Fresno, CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB www.valle air.or
Page 2 of 13 Form ISR AIA Revised August 4,2016
End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces):
Building Square Footage: Number of Dwelling Units:
Additional sheets for phasing information can be found on the District's website at�vww.valleyair.or&
Central Region Office: 1990 E.Gettysburg Ave. Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB e�w .vaf[eyair.o q
Page 3 of 13 Form ISR AIA Revised August 4,2016
1-4. Single Phase Development
Start of Construction(Month/Year) Gross Acres:
End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces):
Building Square Footage: Number of Dwelling Units:
J. On-Site Air Pollution Reductions (Mitigation Measures)
Listed below are categories of possible mitigation measures that will reduce a project's impact on air quality. If a category is
applicable to the project,check"Yes",and please complete the corresponding page to identify specific mitigation measures within
that category. If a category is not applicable to the project,check"No".
1. Construction Detailed Fleet(making a commitment to using a construction fleet that will achieve the emission reductions required
by District Rule 95 10)
® Yes,please complete mitigation measure 1
❑ No
2. Land Use/Location (e.g.increased density,improve walkability design,increase transit,etc.)
® Yes,please complete applicable mitigation measures 2a through 2f
❑ No
3. Neighborhood/Site Enhancements(e.g. improve pedestrial network,traffic calming measures,NEV network,etc.)
® Yes,please complete applicable mitigation measures 3a through 3c
❑ No
4. Parking Policy/Pricing(e.g.parking cost,on-street market pricing,limit parking supply,etc.)
❑ Yes, please complete applicable mitigation measure 4a through 4e
® No
5. Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpool/shuttle,ride sharing program,etc.)
❑ Yes,please complete applicable mitigation measures 5a through 5f
® No
6. Building Design(e.g.woodstoves or fireplaces)
® Yes,please complete mitigation measure 6
❑ No
7. Building Energy (e.g. exceed title 24,electrical maintenance equipment)
❑ Yes,please complete applicable mitigation measures 7a through 7b
® No
8. Solar Panels(e.g. incorporate solar panels in the project)
❑ Yes,please complete applicable mitigation measure 8
® No
K. Review Period
You may request a five(5)day period to review a draft of the District's analysis of your project before it is finalized. However,if you
choose this option,it will delay the project's finalization by five(5)business days.
® I request to review a draft of the District's analysis.
Central Region Office: 1990 E.Gettysburg Ave. Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB www.vallevair.oro
Page 4 of 13 Form ISR AIA Revised August 4,2016
L. Fee Deferral Schedule
If the project's on-site air pollution reductions(mitigation measure)insufficiently reduced air pollution as outlined in Rule 9510,an
off-site fee is assessed based on the excess air pollution. The money collected from this fee will be used by the District to reduce air
pollution emissions `off-site' on behalf of the project.
An Applicant may request a deferral of all or part of the`off-site'fees up to,but not to exceed,the start date of construction. The start
of construction is any of the following,whichever occcurs first: start of grading,start of demolition,or any other site development
activities not mentioned above.
❑ I request a Fee Deferral Schedule,and have enclosed the Fee Deferral Schedule Application.
The Fee Deferral Schedule Application, can be found on the District's website at www.vallgyair.m.
M. Change of Project Developer
The Applicant assumes all responsibility for ISR compliance for this project. If the project developer changes,the Applicant must
notify the Buyer,and both Buyer and Applicant must file a`Change of Project Developer'form with the District. If there is a change
of project developer,and a`Change of Project Developer'form is not filed with the District,the Applicant will remain liable for ISR
compliance.
The Change of Project Developer form can be found on the District's website at www.valie, ay ir.org,
N. Attachments
Required. If applicable:
® Tract Map or Project Design Map ❑Letter from Applicant granting Agent authorization
® Vicinity Map ❑Fee Deferral Schedule Application
®Application Filing Fee ❑Monitoring&Reporting Schedule
$767.00 for mixed use and non-residential projects OR
❑
$512.00 for residential projects only Supporting documentation for selected Mitigation Measures
O. Certification Statement
I certify that I have reviewed and completed the entire application and hereby attest that the information relayed within is true and
correct to the best of my knowledge. I commit to implementation of those on-site mitigation measures that I have selected above. I
am responsible for notifying the District if I will be unable to implement these mitigation measures. If a committed mitigation
measure is not implemented,the project may be re-assessed for air quality impacts.
(An authorized Agent may sign the form in lieu of the Applicant if an authorization letter signed by the Applicant is provided).
Name(printed): _ Title: SgCN�r -
Signature: Date: %• .�
Central Region Office: 1990 E.Gettysburg Ave. Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB www.valleyair.org
Page 5 of 13 Form ISR AIA Revised August 4,2016
SJVUAPCD Indirect Source Review 1/3/17
Complete Project Summary Sheet & 3:30 pm
Monitoring and Reporting Schedule
(District Enforced Emission Reduction Measures Continued)
Project Name: THE OAKS
Applicant Name: HIGH &MIGHTY FARMS, INC
Project Location: 1471 SOUTH FOWLER
CHRUCH AVE 7 FOWLER AVE
APN(s): 316-022-21
Project Description: LAND USE:
Residential -208 Dwelling Unit-Single Family Housing
Residential -208 Dwelling Unit-Single Family Housing
Residential -208 Dwelling Unit-Single Family Housing
Residential -208 Dwelling Unit-Single Family Housing
Residential -208 Dwelling Unit-Single Family Housing
Residential -208 Dwelling Unit-Single Family Housing
Residential -0 Dwelling Unit-Congregate Care (Assisted Living) Facility
Residential -0 Dwelling Unit-Apartments, Low Rise
Commercial/Retail -0 Square Feet-Strip Mall
ACREAGE: 77.89
ISR Project ID Number: C-20160269
--- .............
Applicant ID Number: C-302623
Permitting Public Agency: CITY OF FRESNO
Public Agency Permit No. UNKNOWN
Existing Emission Reduction Measures
Enforcing Agency Measure Quantification Notes
There are no Existing Measures for this project.
Non-District Enforced Emission Reduction Measures
Enforcing Agency Measure Specific Implementation Source Of Requirements
_CITY OF FRESNO Increase Density 1,957 Jobs, 0 DU
CITY OF FRESNO Increase Diversity Project located in various land uses
CITY OF FRESNO _Improve Walkability Design 13.92 Nodes/square mile
CITY OF FRESNO Improve Destination 8.8 miles(distance to downtown or
Accessibility job center
CITY OF FRESNO I Improve Pedestrial Network _Within Project Site
CITY OF FRESNO Provide Traffic Calming 75% street with improvements and
Measures 75% of Intersection with improvements l
Number of Non-District Enforced Measures: 6
District Enforced Emission Reduction Measures
Enforcing Agency Measure Specific Implementation Measure For District Review
Compliance
SJVUAPCD Indirect Source Review 1/3/17
Complete Project Summary Sheet & 3:30 pm
Monitoring and Reporting Schedule
(District Enforced Emission Reduction Measures Continued)
Enforcing Agency Measure Specific Implementation Measure For District Review
Compliance
SJVAPCD I Construction - Detailed For each project phase, Within 30-days of
Fleet maintain records of total (Compliance Dept. completing
hours of operation for all Review) construction for
construction equipment, each phase
greater than 50 horsepower,
operated on site. Within 30-
days of completing
construction of each project
phase, submit to the District a
summary report of total hours
of operation, by equipment
type, equipment model year
and horsepower.
............... ... ...
SJVAPCD Construction and I. For each project phase, all Ongoing
Operation - Recordkeeping i records shall be maintained (Compliance Dept.
on site during construction i Review)
and for a period of ten years
following either the end of
construction or the issuance
of the first certificate of
occupancy, whichever is later.
Records shall be made
available for District
inspection upon request.
SJVAPCD Construction and For each project phase, Ongoing
Operational Dates maintain records of(1)the (Compliance Dept.
construction start and end Review)
dates and (2)the date of
issuance of the first certificate
of occupancy, if applicable.
Number of District Enforced Measures: 3
SANGER UNIFIED SCHOOL DISTRICT
1905 SEVENTH STREET • SANGER, CA 93657
(559) 524-6521 FAX 875-0311
MATTHEW J. NAVO, SUPERINTENDENT
May 24, 2016
Brian Yengoyan
Citadel Development Group
1589 W Shaw Ave., Suite#8
Fresno, CA 93704
Dear Mr, Yengoyan,
Subject:The Oaks, Northeast Corner of S. Sunnyside and E. Church Avenues
The purpose of this letter is to provide the preliminary comments of the Sanger Unified School District
on the proposed development of approximately 76 acres at the northeast corner of S. Sunnyside and E
Church Avenues. The project would include 208 single family residential lots on 40.44 acres; an
estimated 238 apartment units on 11.9 acres (based on RM-2 zoning at 20 units per acre [density range
of RM-2 is 16-30 units per acre]); age restricted housing on 10.0 acres; assisted living/memory care on
4.2 acres; commercial retail and office on 6.6 acres; and a park site (2.5 acres) with trail access.
The project will generate students that will need to be housed in Sanger Unified schools. Based on the
District's current student generations rates, the proposed residential units would generate the following
number of students:
Units Grades K-6 Grades 7-8 Grades 9-12 Total K-12
208 Single Family 72 14 21 107
238 Apartments 70 15 21 106
Total 142 29 42 213
Elementary school students generated by the project would attend Sequoia Elementary School, located
approximately one mile southeast of the project site at 1820 S. Armstrong Avenue. Enrollment at
Sequoia Elementary School has been growing and as of the 2015-16 school year was 521. The capacity of
the school is 550, so the addition of project students would cause capacity deficiencies at the school.
In addition to the impact of the project itself, there is substantial additional growth planned within the
Sequoia Elementary boundaries. The District needs an additional elementary school in the project area
to adequately serve the existing student population and planned development in the area. The
proposed project site would be an excellent location for a new elementary school.
Based on the above, we request that you consider selling approximately 12 acres of your property to the
District for use as an elementary school. Having an elementary school at this location would provide a
-------------------- "A Tradition of Excellence" --------------------
Trustees: Peter R.Filippi Ismael(Mike)Hernandez James D.Karle Kenneth R.Marcantonio
Marcy Masumoto Jesse Vasquez Tammy Wolfe
Brian Yengoyan
May 24, 2016
Page 2
great marketing tool for you, a substantial amenity for your homebuyers and renters, and a walkable,
centrally located school for the larger neighborhood.
High school and middle school students from the project would currently attend Sanger High School and
Washington Academic Middle School in Sanger. However, the District has purchased most of a new 120-
acre educational center site located immediately southeast of the project site at the southeast corner of
Fowler and Church Avenues. This site will house both a high school and a middle school. Once facilities
are constructed on this site, high school and middle school students from the project will have nearby
school facilities.
The project will be subject to school facilities fees charged by the District. The residential fee as of July
23, 2016, will be reduced from $3.57 per square foot to $3.48 per square foot. The fee on commercial
and industrial development will increase from $0.54 per square foot to $0.56 per square foot as of July
23, 2016.
The assisted living and age-restricted housing will have a minimal impact on the District in terms of
student generation. For this type of development, only the commercial/industrial fee is charged as
allowed by law.
The commercial development proposed at the northwest corner of Fowler and Church is of concern
being proximate to the educational center site. Our concern is primarily related to the potential
attractive nuisance factor that retail commercial development can have near school sites. You have
suggested that the following uses be prohibited by covenant:
• Liquor Stores
• Tattoo or Body Modification Parlors
• Pipe & Smoke Shops
• Vape Shops
• Gun/Firearm Shops
• Discount cigarette and tobacco shops
We agree with the prohibition of the above uses, but we would like to add the following to the list:
• Bars and cocktail lounges not operating in conjunction with a restaurant
• Video game arcades
• Fast food restaurants, unless a specific agreement can be reached between the District and
business owner regarding satisfactory supervision of students on the premises.
• Grocery stores (less than 10,000 square feet in size), unless a specific agreement can be reached
between the District and business owner regarding satisfactory supervision of students on the
premises.
• Combination gas station/grocery stores (mini-marts), unless a specific agreement can be
reached between the District and business owner regarding satisfactory supervision of students
on the premises.
• Adult oriented businesses
Brian Yengoyan
May 24, 2016
Page 3
Thank you for the opportunity to provide our preliminary comments on the proposal. We would like the
opportunity to further discuss the possibility of locating an elementary school on the project site, as well
as any other aspect of this letter.
Sincerely,
Richard Sepulveda
Chief Operations Officer
City of
CrsCanff
��
DATE: November 3 2016 Revised December 5, 2016
TO: Will Tackett, Development Services/Planning
Development and Resource Management Department
FROM: Ann Lillie, Senior Engineering Technician
Public Works Department, Traffic and Engineering Services Division
SUBJECT: PUBLIC WORKS CONDITIONS OF APPROVAL FOR VESTING TENTATIVE
TRACT MAP NO. 6165 REGARDING MAINTENANCE REQUIREMENTS
LOCATION: 1471 South Fowler Avenue, 1279 South Fowler Avenue (tract only)
APN: 316-022-21
The proposed Public Park and Pedestrian Access (connection centered on southern
boundary of this map) maintenance requirements shall be a part of this map and satisfied
prior to final map approval. Reference is made to the Public Works Conditions of
Approval for Vesting Tentative Parcel Map No. 2016-05 which defers these maintenance
requirements to the final map processing of Vesting Tentative Tract Map No. 6165.
All parcels within Vesting Tentative Parcel Map No. 2016-05, including the remainder,
MAY share in the costs to provide maintenance for the proposed Public Park and
Pedestrian Access. All other maintenance requirements shall be the burden of this
subdivision and processed accordingly.
The Public Works Department, Traffic and Engineering Services Division, has completed its
review and the following requirements are to be placed on this tentative map as a condition of
approval. These requirements are based on City of Fresno code, policy, standards and the
public improvements depicted on the exhibits submitted for this development.
ATTENTION:
The item below requires a separate process with additional costs and timelines. In order to avoid
delays with the final map approval, the following item shall be submitted for processing to the
Public Works Department, Traffic and Engineering Services Division prior to final map approval.
X CFD Annexation Request Ann Lillie (559) 621-8690
Package ann.lillie(a)fresno.gov
The Community Facilities District annexation process takes from three to four months and
SHALL be completed prior to final map approval. INCOMPLETE Community Facilities District
01&) ❑ Annexation Request submittals may cause delays to the annexation process and final
map approval.
All applicable construction plans for this development shall be submitted to the appropriate City
Department for review and approval prior to the CFD process.
a. Landscape and Irrigation Plans are required to be approved prior to the finalization of the
CFD process and the approval of the final map.
Page 1 of 3
TT 6165 Maintenance Conditions REV.Docx
b. Proposed park amenities shall be reviewed and approved by the Building & Safety
Services Division or as approved in writing by the City Engineer at time of
submittal for the CFD process and prior to final map approval.
Requirements not addressed due to omission or misrepresentation of information, on which this
review process is dependent, will be imposed whenever such conditions are disclosed and shall
require a revision of this letter.
Any change affecting the items in these conditions shall require a revision of this letter.
1. 7❑H3 LRSHUNE2 ❑❑HI 10 DL A4Jl0D❑FH3 HTXLLFP HI M/
The long term maintenance and operating costs, including repair and replacement, of certain
LIHTALHGISEE(FIiP SLREFP F-K N=6 M:Al1 new Single-Family developments
are the ultimate responsibility of the Developer. The Developer shall provide these Services
either by a mechanism approved by the Public Works Department or by annexing to the City of
) WkRVL&RP P ❑QW) DF UVVE UMW RZ❑]❑E1H&) ❑d RILL11111M
The following public improvements (Existing and Proposed) are eligible for Services by CFD No.
11 as associated with this development:
0 All landscaped areas, trees and irrigation systems, as approved by the Public Works
Department, within the street rights-of-way and landscape easements; including without
limitation, the median island (1/2, if fronting only one side of median), parkways, buffers,
street entry medians and sides ❑❑❑Lwide minimum landscaped areas allowed) in all
Local and Major Streets.
0 All landscaping, trees, irrigation systems, hardscaping and amenities within Outlots,
open spaces and trails.
0 Concrete curb and gutters, valley gutters, sidewalks, curb ramps, traffic calming
structures, median island concrete maintenance band and cap (1/2, if fronting only one
side of median), and street lights in all Major Streets.
0 Concrete curb and gutters, valley gutters, sidewalks, curb ramps, traffic calming
structures, and street entry and interior median island curbing and hardscape, street
paving, street name signage and street lights in all Local Streets.
2. The Property Owner may choose to do one or both of the following:
a. The Property Owner may petition the City of Fresno to request annexation to CFD No.
11 by completing and submitting an Annexation Request Package to the Public Works
Department, Traffic and Engineering Services Division for review and approval. The
Annexation Request Form is available, along with current costs, on-MlED\A -E&lYVV❑
website at http://www.fresno.gov, under the Public Works Department, Developer
Doorway.
0 Proceedings to annex the final map to CFD No. 11 SHALL NOT commence
unless the final map is within the City limits and all construction plans (this includes
Street, Street Light, Signal, Landscape and Irrigation plans, and any other plans
needed to complete the process) and the final map are considered technically
correct.
Page 2 of 3
TT 6165 Maintenance Conditions REV.Docx
0 The annexation process will be put on HOLD and the developer notified if all of the
requirements for processing are not in compliance. Technically Correct shall
mean that the facilities and quantities to be maintained by CFD No. 11 are not
subject to change and after acceptance for processing.
0 Public improvements not listed above will require written approval by the Public
Works Department Director or his designee.
0 All areas not within the dedicated street rights-of-way approved for Services by
CFD No. 11, including but not limited to outlots, trails and landscaped areas, shall
be dedicated in fee to the City of Fresno, dedicated as a public easement for
maintenance purposes or as approved by the Public Works Department City
Engineer.
b. The Property Owner may provide for Services privately for the above maintenance
requirements. All City maintenance requirements not included for annexation to CFD
No. 11 for Services SHALL be included in the DCC&Rs or some other City approved
mechanism for the required Services associated with this development. Contact the
Planner in the Development and Resource Management Department for more details.
For questions regarding these conditions please contact me at (559) 621-8690 or
ann.lillie(aD-fresno.gov
Page 3 of 3
TT 6165 Maintenance Conditions REV.Docx