Loading...
HomeMy WebLinkAboutPM 2017-05 - Conditions of Approval - 8/28/2017 City of _ Development&Resource Management Department 2600 Fresno Street ■Third Floor Jennifer K. Clark Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 498-1026 August 28, 2017 Please reply fv: Israel Trejo (559) 621-8044 Lore Engineering Inc. c/o Hal Lore 620 Dewitt Avenue, #101 Clovis, CA 93612 SUBJECT: NOTICE OF APPROVAL OF TENTATIVE PARCEL MAP NO. 2017-05 DATED MAY 30, 2017, PROPOSING A 3-LOT PARCEL MAP FOR PROPERTY LOCATED ON THE NORTH SIDE OF WEST HERNDON AVENUE BETWEEN NORTH MILBURN AND NORTH BLYTHE AVENUES The City of Fresno Development Services Division has completed its review of the subject parcel map dated May 30, 2017. Pursuant to Section 15-Article 33 of the Fresno Municipal Code, this letter is written to advise you that the Conditions of Approval dated August 28, 2017, are as noted on the attached document. Appeal: The divider or any aggrieved person may file an appeal regarding to conditions of approval within ten (10) days from the date of approval. To protest the Director's decision regarding the conditions of approval, you must appeal by filing a written appeal with the Director of the Development and Resource Management Department. Appeals must include the appellant's interest in/or relationship to the subject property, the decision or action appealed, and specific reasons why the appellant believes the decision or action appealed should not be upheld. Appeals must be submitted to the Director of the Development and Resource Management Department prior to 5 p.m. on September 7, 2017. EXPIRATION: The approval or conditional approval of this tentative Parcel Map expires two years from the date of approval. The expiration shall terminate all proceedings and a final Parcel Map may not be filed without first processing a new Tentative Parcel Map. Modification of a Tentative Parcel Map after approval or conditional approval does not extend the two year time limit. EXTENSION: The divider may request up to a two year extension of the tentative map expiration date by filing a written application together with the fee set forth in the Master Fee Schedule at the time of the request with the Director of the Development and Tentative Parcel Map No. 2017-05 August 28, 2017 Page 2 Resource Management Department prior to the expiration date of the map. The applicant must state the reasons for requesting the extension. New conditions may be imposed if an extension is granted. Cumulative discretionary extensions may not exceed an aggregate of six years. If you wish additional information, please contact the City of Fresno, Development and Resource Management Department, Development Services Division, 2600 Fresno Street, Fresno, California 93721-3604; phone, (559) 621-8044. Your inquiry should be directed to either Jon Bartel (engineering or improvements issues) or Israel Trejo (planning or zoning issues). Should you have any questions regarding the conditions you must notify either Jon Bartel at (559) 621-8684 or Israel Trejo at (559) 621-8044. No further notice will be sent. Sincerely, DEVELOPMENT SERVICES DIVISION r srael Trej lanner Development & Resource Management Department Enclosures: Vesting Tentative Parcel Map No. 2017-05 dated May 30, 2017 Conditions of Approval dated August 28, 2017 Comments from Responsible Agencies CITY OF FRESNO DEVELOPMENT & RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL August 28, 2017 TENTATIVE PARCEL MAP No.2017-05 LOCATED ON THE NORTH SIDE OF WEST HERNDON AVENUE BETWEEN NORTH MILBURN AND NORTH BLYTHE AVENUES NOTICE TO PROJECT APPLICANT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act (SMA), Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees,dedications,reservations or exactions imposed on a development project. Upon conditional approval of Tentative Parcel Map No. 2017-05, dated May 30, 2017, the subdivider may prepare a Parcel Map (Final) in accordance with the approved tentative parcel map. Note that a Parcel Map may not be filed until the appeal period has expired. Should an appeal be filed pursuant to Section 15-3314 of the FMC, the application will be scheduled to be heard before the City of Fresno Planning Commission. The appellant may withdraw their appeal pursuant to Section 15-3314-G of the FMC. Concurrent with the filing of a Parcel Map and when the provisions of Section §66436 of the SMA apply, the subdivider is responsible to send, by certified mail, a sketch of the proposed Parcel Map, together with a copy of Section §66436(a)(3)(A)of the SMA,to any public entity or public utility which has previously acquired a right-of-way easement. ZONING 1 Comply with the provisions of the State of California Government Code Sections §66410 - §66499.58 of the SMA and Part IV: Land Divisions as contained within Chapter 15 of the Fresno Municipal Code. 2. Any existing and/or proposed development on the site may be affected due to the location of the proposed parcel lines. The provision of public and/or emergency vehicle access, utility services (including fire suppression systems), drainage, or shared parking, solid waste or similar facilities across proposed parcel lines requires recordation of a City of Fresno prepared Mutual Easement and Reciprocal Use Agreement covering all proposed parcels prior to recordation of a parcel map. Conditions of Approval Tentative Parcel Map No.2017-05 August 28, 2017 Page 2 GENERAL CONDITIONS 3. Contact Israel Trejo, Planner, in the City of Fresno Development and Resource Management Department at (559) 621-8044 or via email at Israel.Treio(),fresno.gov for assignment of addresses to parcels proposed to be created from a subdivision of the subject property. • NOTE: It is recommended that at least 6 months prior to the first occupancy,the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details)to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. 4. Any existing and/or proposed structure(s) on the site may be affected due to the location of the proposed parcel lines. The placement of a parcel line in close proximity to (or through) any existing and/or proposed structure(s) requires that the structure(s) be found in compliance with the fire resistive standards of the Uniformed Building Code, Chapter 5. a) Compliance with the prevailing Uniform Building Code as it relates to exterior wall protection, allowable area, etc. (as applicable to new parcel line locations) must be demonstrated prior to recordation of the Parcel Map. Contact the Development and Resource Management Department, Building and Safety Services Division at(559)621- 8200. • NOTE: In the event the structures do not comply they must be modified so as to meet the requirement. 5. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of work, in accordance with Chapter 13 of the FMC. 6. All existing offsite overhead utilities within the limits of the tentative parcel map, including but not limited to, electrical systems, communication systems and street lighting systems shall be placed underground in accordance with the provisions of Section 15-2017 and Resolution No. 78-522/88-229, and the policies of the Public Works Department. • NOTE: This requirement may be waived or deferred by the Public Works Director or the City Engineer upon a determination that the installation is infeasible or premature. 7. When required, all work and engineered plans for public improvements shall conform to the 2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Conditions of Approval Tentative Parcel Map No.2017-05 August 28, 2017 Page 3 Resolution No. 70-36 and Resolution Nos. 84-361) and any amendments thereto, hereinafter referred to as the Public Works Standards. a) Engineered construction plans and estimates for all or part of the required work shall be required prior to the issuance of Street Work Permits unless otherwise determined by the City Engineer. The cost for such plan preparation, review and construction inspection shall be at the subdivider's expense. 8. The subdivider shall dedicate and construct public easements to facilitate the construction of public improvements (when applicable) within the limits of the parcel map. a) All such public easements shall be identified and dedicated with the processing and recordation of a Parcel Map. 9. Repair all existing damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559)621-5600. 10. Any existing utilities, including but not limited to, street lights, traffic signals, fire hydrants, poles (power, telephone, cable, etc.), which must be relocated or removed in conjunction with the construction of off-site improvement requirements, shall be the responsibility and at the expense of the subdivider. 11. The subdivider may either construct or install required public improvements,when required; or, enter into a bonded secured agreement with the City of Fresno providing for the construction of the required improvements and sufficient security prior to the recordation of a Parcel Map (final). 12. Whenever covenants or agreements are required, they shall be prepared by the city upon receipt of the fee in accordance with the adopted Master Fee Schedule. All covenants and agreements must be approved by the City Attorney's Office and shall be recorded with the final parcel map. SPECIFIC CONDITIONS STREETS AND RIGHTS-OF-WAY 13. The subdivider shall comply with all requirements and conditions included within the attached Department of Public Works, Traffic and Engineering Services Division memorandum dated July 7, 2017; or, any amendment or modifications to those requirements which may be granted by the Director of the Department of Public Works prior to recordation of a Parcel Map. 14. Pursuant to Article 38 of Chapter 15 of the FMC, the subdivider shall provide for the installation of street trees, or payments in lieu of immediate installation of street trees and payment of street tree fees applying to the subdivision or the division of land as designated in the Master Fee Schedule. Conditions of Approval Tentative Parcel Map No.2017-05 August 28, 2017 Page 4 COMMUNITY FACILITIES DISTRICT 15. Comply with all of the requirements included within the attached Department of Public Works, Traffic and Engineering (Maintenance Requirements) memorandum dated July 10, 2017; or, any amendment or modifications to those requirements which may be granted by the Director of the Department of Public Works prior to recordation of a Parcel Map. PUBLIC UTILITIES REQUIREMENTS Sanitary Sewer Service Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 16. Comply with all of the requirements included within the attached Department of Public Utilities, Planning and Engineering (Sanitary Sewer) memorandum dated July 13, 2017; or, any amendment or modifications to those requirements which may be granted by the Director of the Department of Public Utilities prior to recordation of a Parcel Map. Water Service The following water improvements shall be required prior to providing City water service to the project: 17. Comply with all of the requirements included within the attached Department of Public Utilities, Water Division memorandum dated June 29, 2017; or, any amendment or modifications to those requirements which may be granted by the Director of the Department of Public Utilities prior to recordation of a Parcel Map. FRESNO METROPOLITAN FLOOD CONTROL DISTRICT (FMFCD) 18. The subdivider shall be required to comply with all of the specific requirements imposed by the FMFCD for the subdivision or any amendments or modifications to those requirements, which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the FMC. These requirements are identified in the attached District's letter dated August 18, 2017. FIRE DEPARTMENT 19. Comply with all requirements included within the attached City of Fresno, Fire Department memorandum dated July 7, 2017. FRESNO IRRIGATION DISTRICT 20. Comply with all requirements included within the attached Fresno Irrigation District memorandum dated July 10, 2017. Conditions of Approval Tentative Parcel Map No.2017-05 August 28,2017 Page 5 COUNTY OF FRESNO DEPARTMENT OF PUBLIC HEALTH 21. Comply with all requirements included within the attached County of Fresno, Department of Public Health memorandum dated June 22, 2017. DEVELOPMENT FEES AND CHARGES Pursuant to Government Code§66020(d)(1)each local agency shall provide to the project applicant a notice in writing at the time of the approval of a project or at the time of the imposition of the fees, dedications, reservations, or other exactions a statement, and notification that the 90-day approval period in which the applicant may protest has begun (please see Notice to Project Applicant contained herein above for further information). This project is subject to the following development fees and charges: a. Fresno Metropolitan Flood Control Fee Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control District (see attached memorandum referenced herein above). SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth) c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charge S.T.E.P.** Service Area: Herndon e. Wastewater Facilities Charge S.T.E.P.** f. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE g. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. h. Frontage Charge [1] $6.50/lineal foot i. Transmission Grid Main Charge [1] $804/net acre (parcels under 5 gross acres) j. Transmission Grid Main Bond Debt Service Charge [1] $304/net acre (parcels under 5 gross acres) Conditions of Approval Tentative Parcel Map No.2017-05 August 28, 2017 Page 6 k. Water Supply Fee [2] $407/living unit equivalent Service Area: 201-S I. Well Head Treatment Fee [2] N/A Service Area: 201 m. Recharge Fee [2] N/A Service Area: 201 n. 1994 Bond Debt Service [1] N/A Service Area: 201 CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE o. Fire Facilities Impact Fee — Citywide [4] - Commercial Office $303.00/1000 sq.ft. t p. Park Facility Impact Fee — Citywide [4] N/A q. Quimby Parkland Dedication Fee [2] N/A r. Citywide Regional Street Impact Fee [3] - Commercial Office $14,266.00/adj. acre s. New Growth Area Major Street Fee [3] - Commercial Office $35,826/adj. acre t. Police Facilities Impact Fee — Citywide [4] - Commercial Office $594.00/1000 sq.ft. t u. Traffic Signal Charge [1] - Commercial Office $550.00/1000 sq.ft. t Notes: On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008 — 023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No. 2009 — 01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. Conditions of Approval Tentative Parcel Map No.2017-05 August 28, 2017 Page 7 * Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8 Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit Equivalents. **Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. Average Daily Trips to be determined by Traffic Engineering. City of rn :: ■■ DATE: July 7, 2017 TO: Israel Trejo Development and Resource Management Department FROM: Louise Gilio, Traffic Planning Supervisor Department of Public Works, Traffic and Engineering Services Division SUBJECT: Tentative Parcel Map 2017-05, Public Works Conditions of Approval 4683 West Spruce Avenue Richer J. Trustee/ Hal Lore, PE PUBLIC IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed prior to perfection of this parcel map. Contact Jon Bartel at(559) 621-8684. General Conditions • Submit the following plans, as applicable, in a single package, to the Public Works Department, Traffic and Engineering Services Division for review and approval, prior to the final map: Street and Trail construction; Signing and Striping. All required signing and striping shall be installed and paid for by the developer / owner. The signing and striping plans shall comply with the current Caltrans standards and be submitted as a part of the street improvement plans. • Additional offsite improvements will be required at the time of future site plan review. • Repair all damaged and/or off grade off-site concrete street improvements as determined by the City of Fresno Public Works Department, Construction Management Division, (559) 621-5600. • All existing driveway approaches which no longer provide access to approved vehicle parking areas shall be removed unless otherwise approved by the City Engineer. Such areas shall be reconstructed with curb, gutter, and sidewalk to match existing adjacent street improvements. This work shall be completed and accepted before a Permit of Occupancy is issued or the building is occupied per Fresno Municipal Code (FMC) 13-211. • Provide a 30' visibility triangle at all street intersections and a 10' visibility triangle where all driveways and /or alleys intersect streets. • Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 15-4114. Page 1 of 3 TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-05 SPRUCE 4683 W\PM 2017-05 SPRUCE 4683 doc Y Street widening and transitions shall also include utility relocations and necessary dedications. Street Dedications and / or Vacations Identify pedestrian paths of travel along public sidewalks: Provide a minimum of 4' clear to accommodate access along the entire street frontage of this map. Pedestrian easements may be required to accomplish this. Contact the Public Works Department, Traffic and Engineering Services Division, Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or public easements. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment covenant is approved by the City of Fresno Public Works Department, Traffic and Engineering Services Division. Contact Jason Camit at (559) 621-8681. Encroachment agreements must be approved prior to final map. Frontage Improvement Requirements All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. Trail construction plans are required and shall be approved by the City Engineer. The performance of any work within the public street rights-of- way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Traffic and Engineering Services Division at (559) 621-8670 for detailed information. Public Streets: Herndon Avenue: Expressway 1. Dedication Requirements: a. Dedicate a 26' (minimum) easement for Bike, Pedestrian and Landscape purposes only. (Additional right of way may be required for grading and drainage purposes.) Above ground utilities are not allowed within this easement. b. Relinquish direct vehicular access rights to Herndon Avenue within the limits of this subdivision. 2. Construction Requirements: a. Construct a 12' wide Bike and Pedestrian Class I Trail, complete with lighting, signing, striping and landscaping, per the Fresno General Plan, the Public Works Standards P-58, P-59, P-60, P-61 and the Caltrans Highway Design Manual. Identify route on the map, complete with a cross section. Construct an expressway barrier fence within the limits of the application, per Public Works Standards P-74 and P-75. Spruce Avenue: Collector 1 The proposed parcels are land locked. Although there are no improvements required along Spruce, this will be the location of the future access. I would recommend a plan for a unified development for all parcels involved. Page 2of3 TATraffic Plan ning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-05 SPRUCE 4683 W\PM 2017-05 SPRUCE 4683.doc Specific Mitigation Requirements The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. Traffic Signal Mitigation Impact (TSMI) Fee: This project shall pay all applicable TSMI Fees, at the time of Parcel Map approval based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. Contact the Public Works Department, Frank Saburit at(559)621-8797. Fresno Maior Street Impact (FMSI)Fees: This map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees. Contact the Public Works Department, Frank Saburit at (559)621-8797. Reqional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocoq.orq. Provide proof of payment or exemption rior to granting final occupancy. Page 3 of 3 TATraffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2017\PM 2017-05 SPRUCE 4683 W\PM 2017-05 SPRUCE 4683.doc Ci ty of cIMcrL%►1:;_\W\I� rn�-���_ DATE: July 10, 2017 TO: Israel Trejo, Planner Development and Resource Management Department FROM: Ann Lillie, Senior Engineering Technician Public Works Department, Traffic and Engineering Services Division SUBJECT: PUBLIC WORKS CONDITIONS OF APPROVAL FOR VESTING TENTATIVE PARCEL MAP NO. 2017-05 REGARDING MAINTENANCE REQUIREMENTS ADDRESS: 4683 West Spruce Avenue APN: portions of 502-160-09 and 10 The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval. These requirements are based on City of Fresno code, policy, standards and the public improvements depicted on the Exhibits submitted for this development. ATTENTION: The items below require a separate process with additional fees and timelines. In order to avoid delays with the final map approval, the following items shall be submitted for processing to the Public Works Department contact shown below. X CFD Annexation Request Package Ann Lillie (559) 621-8690 ann.lillie@fresno.gov Time-lines for the processing of the annexation to the CFD and private maintenance covenants require three to four months and SHALL be completed prior to final map approval. Delays to the final map approval will occur if the maintenance requirements are not met. All applicable construction plans for this development are to be submitted to the Traffic and Engineering Services Division for review and approval prior to the CFD process and shall be deemed technically correct. If Landscape and Irrigation Plans are required, approval of the plans is required prior to the finalization of the CFD process and the approval of the final map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed and shall require a revision of this letter. Any change affecting the items in these conditions requires revision of this letter. 1. MAINTENANCE REQUIREMENTS The Property Owner shall be responsible for the long term maintenance, including repair and replacement, of certain required public improvements ("Services") associated with Parcel Map 2017-05 as approved by the Public Works Department and listed below: Page 1 of 2 PM2017-05 Conditions For Maintenance Docx • All landscaped areas, trees and irrigation systems, as approved by the Public Works Department, within the public street rights-of-way and required public trail easement within and adjacent to West Herndon Avenue. • All officially designated and required public trail amenities such as benches, drinking fountains, trash receptacles, City required fencing and low voltage lighting. • The concrete curb and gutters and trail within and adjacent to West Herndon Avenue. • All costs associated with the street lights (including repair and replacement) in the street rights-of-way. (Major and Local Public Streets) 2. The Property Owner may choose to do one or both of the following: • The Property Owner may petition the City of Fresno to request annexation to the CFD by completing and submitting an Annexation Request Package to the Public Works Department, Traffic and Engineering Services Division for review and approval. The Annexation Request Form is available, along with current costs, on- line at the City's website at http://www.fresno.gov, under the Public Works Department, Developer Doorway. • Proceedings to annex the final map to the CFD SHALL NOT commence unless the final map is within the City limits and all construction plans (this includes Street, Street Light, Signal, Landscape and Irrigation plans, and any other plans needed to complete the process) and the final map are considered technically correct. • The annexation process will be put on HOLD and the developer notified if all of the requirements for processing are not in compliance. Technically Correct shall mean that the facilities and quantities to be maintained by the CFD are not subject to change after acceptance for processing. • Public improvements not listed above will require written approval by the Public Works Department Director or his designee. • The Property Owner may provide for Services privately for the above maintenance requirements. All City maintenance requirements not included for annexation to the CFD for Services SHALL be included in the DCC&Rs or some other City approved mechanism for the required Services associated with this development and as approved by the City Engineer. For questions regarding these conditions please contact me at (559) 621-8690 or ann.lillie a@fresno.gov Page 2 of 2 PM2017-05 Conditions For Maintenance Docx City of � FWRES=+S j►► DEPARTMENT OF PUBLIC UTILITIES MEMORANDUM DATE: July 13, 2017 TO: ISRRAEL TREJO, Planner III Department of Development and Resource Management FROM: KEVIN GRAY, Supervising Engineering Technician Department of Public Utilities, Planning and Engineering SUBJECT: SEWER REQUIREMENTS FOR TENTATIVE PARCEL MRP NO. 2017-05 General Vesting Tentative Parcel Map No. 2017-05 for property located on West Herndon between North Milburn and North Blythe Avenues; 4683 West Spruce Avenue S/A, APN: 502-160-09 & -10 (portions of) Sewer Requirements The nearest sanitary sewer main to serve the proposed project is an 8-inch sewer main located in West Spruce Avenue. Sanitary sewer facilities are available to provide service to the site subject to the following requirements: 1. Connection to the existing 45-inch sewer trunk located in West Herndon Avenue shall not be allowed. 2. Installation of sewer house branch(s) shall be required. 3. Separate sewer house branches are required for each parcel. 4. On-site sanitary sewer facilities shall be private. 5. Abandon any existing on-site private septic systems. 6. A cross access agreement is required for sewer service(s) crossing parcels 7. The Project Developer shall contact Wastewater Management Division/Environmental Services at (559) 621-5100 prior to pulling building permits regarding conditions of service for special users. A Nationally Accredited Public Utility Agency '•r.w•r MEMORANDUM ISRAEL TREJO, Planner III Department of Development and Resource Management July 13, 2017 SEWER REQUIREMENTS FOR TENTATIVE PARCEL MAP NO. 2017-05 Page 2 of 2 Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge. 2. Sewer Oversize Area #15. 3. Sewer Facility Charge (Non-Residential) 4. Upon connection of this Project to the City Sewer System the owner shall be subject to payment of Sewer Facility charges per Fresno Municipal Code Sections 6-304 and 6-305. Sewer Facility Charges consist of two components, a Wastewater Facilities Charge and Trunk Sewer Charge where applicable. 5. Sewer Facility Charges are collected after occupancy on a monthly basis over time based on metered (water or sewer effluent) usage. The developer may contact the Department of Public UtiIities/Wastewater-Environmental Control at (559) 621-5153 to receive an estimated cost of the Sewer Facility Charges applicable to the project (based on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that time, per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. City 01 CQCLM►- DEPARTMENT OF PUBLIC UTILITIES – UTILITIES PLANNING & ENGINEERING MEMORANDUM DATE: June 29, 2017 TO: WILL TACKETT, Supervising Planner Department of Development and Resource Management THROUGH: THOMAS C. ESQUEDA, Director Department of Public Utilities FROM: ROBERT A. DIAZ, Senior Engineering Technician �— Department of Public Utilities – Utilities Planning & Engineering SUBJECT: Water Requirements for Vesting Parcel Map 2017-05 General Vesting Tentative Parcel Map No. 2017-05 for property located on West Herndon between North Milburn and North Blythe Avenues; 4683 West Spruce Avenue S/A, APN: 502-160-09 & -10 (portions of) Water Service The nearest water main to serve the proposed project is an 8-inch main located in North Sixth Street. Water facilities are available to provide service to the site subject to the following requirements: 1. On-site water facilities shall be private. 2. Separate water services & meters shall serve each separate parcel. The water supply requirements for this project are as follows: 1. The project applicant shall be required to pay Water Capacity Fee charges for the installation of new water services and meters to serve the property. a. The Water Capacity Fee charge assessed to the applicant shall be based on the number and size of service connections and water meters required to serve the property. b. The Water Capacity Fee charges by meter size are defined in the City's Master Fee Schedule. c. The City reserves the right to require an applicant to increase or decrease the t$o A Nationally Accredited Public Utility Agency MEMORANDUM WILL TACKETT, Supervising Planner Department of Development and Resource Management June 29, 2017 Water Requirements for Vesting Parcel Map No. 2017-05 Page 2 of 2 size of a water meter for a project or a property to ensure that the meter is properly sized to accommodate fire protection requirements, and to allow for accurate volumetric flow measurements at low- and high-flow conditions. d. The Water Capacity Fee Charge for any new or expanded service connection shall be payable prior to the issuance of a building permit at the fee level in effect on the date such permit is issued. 2. The project applicant shall be required to pay all other water-related fees and charges in accordance with the City's Master Fee Schedule and Municipal Code. FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.411 NOTICE OF REQUIREMENTS Page 1 of 4 PUBLIC AGENCY DEVELOPER ISRAEL TREJO J.RICHTER,RICHTER FARMS TRUST mn DEVELOPMENT SERVICES/PLANNING 7473 N.INGRAM AVE.,SUITE 111 CITY OF FRESNO FRESNO,CA 93711 2600 FRESNO STREET,THIRD FLOOD FRESNO,CA 93721 PROJECT NO: 2017-005 ADDRESS: 4683 W.SPRUCE AVE. APN: 502-160-09,10 SENT: Service charge(s) I Drainage Area(s) Preliminary Fee(s) DevelopmentReview Fee(s) Service EG $18,556.00 NOR Review $118.00 To be paid prior to release of District comments to Public Agency and Developer. Grading Plan Review $602.00 Amount to be submitted with fust grading plan submittal. Total Drainage Fee: $18,556.00 Total Service Charge. $720.00 z The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by ML Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first submittal.The Storm Drain Plan fee shall be paid prior to return/pick up of first submittal. N The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/18 based on the site plan submitted to the District on 6/21/17 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, e') reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall BE DIRECTED TO HERNDON AVENUE — b. Grading and drainage patterns shall be as identified on Exhibit No. _ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and C. X Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities 04 located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as X None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: z X Grading Plan 0 Street Plan r Storm Drain Plan Water&Sewer Plan X Final Map X Drainage Report(to be submitted with tentative map) ML Other 1*4 None Required 4. Availability of drainage facilities: X Permanent drainage service is available provided the developer can verify to the satisfaction of the City a' that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service. _ Pennanent drainage service will not be available. The District recommends temporary facilities until C. pennanent service is available. — d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources MaMa Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storn water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April,2014 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to:submit a Notice of ■ Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction ML Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. 8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District 0 within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No.2 for additional comments,recommendations and requirements. Debbie Campbell Sarai Yanovsky Design Engineer Project Engineer 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 CC; HAL LORE,LORE ENGINEERING,INC. mm 620 DEW PTT AVE.,SUITE 101 CLOVIS,CA 93612 ■ 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 OTHER REQUIREMENTS EXHIBIT NO.2 The total Preliminary Drainage Fee for the subject map is$18,556. However, in accordance with the District's Drainage Fee Ordinance, Section 4.103.0. (b), for divisions which at the time of approval are zoned for industrial use, and for all other divisions which do not require a final map, the total fee due is the minimum fee required for dedicated and improved streets and alleys, and developed parcels associated with the division, all remaining areas are being deferred. If construction of Master Plan facilities is required, the minimum fee due shall be the greater of(i) the cost of such Master Plan facilities or (ii) the minimum fee described above. The applicable final fee shall be that most recently established by the Board of Directors prior to approval of the final subdivision map, or map evidencing the creation of parcels. The deferred portion of the drainage fee shall be paid upon development of each individual parcel and the applicable fee shall be that most recently established by the Board of Directors prior to issuance of a development permit. The subject site is located within the District's Drainage Area "EG". Runoff from the Drainage Area "EG" system will ultimately drain to the San Joaquin River. Drainage runoff from commercial and industrial land uses directly to the river is prohibited by City of Fresno and District policy. The District is therefore requiring on-site mitigation of the runoff quality prior to discharge to the public drainage system. The specific plan and detail of the proposed mitigation must be reviewed and approved by the District prior to implementation. The developer is responsible to implement mitigation features which will maintain compliance with the Local, State, and EPA standards and regulations throughout the life of the project. The on-site mitigation system must be paid for and maintained by the developer. An agreement will be required to insure maintenance of these facilities. In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and maintained such that material that may generate contaminants will be prevented from contact with rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm drain system. Development No. TPM 2017-005 Pagel of 2 k:\permits\exhibit2\city-tpm\2017\2017-005.docx(sy) OTHER REQUIREMENTS EXHIBIT NO. 2 The District encourages, but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities,product, or merchandise come into contact with and may contaminate storm water must be treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing is to be required unless such wash water can be directed to the sanitary sewer system, Storm drains receiving untreated runoff from such areas shall not be connected to the District's system. Loading docks, depressed areas, and areas servicing or fueling vehicles are specifically subject to these requirements. The District's policy governing said industrial site NPDES program requirements is available on the District's website at: www.fresnofloodcontrol.org or contact the District's Environmental Department, Daniel Rourke, for further information regarding these policies related to industrial site requirements. Development No. TPM 2017-005 Page 2 of 2 k:\permits\exh i b it2\city-tpm\2017\2017-005.docx(sy) City of r�7C�i��i► FIRE DEPARTMENT DATE: July 7, 2017 TO: ISRAEL TREJO, Planner III Development and Resource Management Department FROM LAURIE SAWHILL, Senior Fire Prevention Inspector Prevention and Technical Services Division SUBJECT: TENTATIVE PARCEL MAP NO. 2017- 05, 4683 W SPRUCE APN: 502-160-09 and 10. The property in question is 2 miles from Fire Station 14. There is an existing 8 inch public water main located in Spruce, with an existing public hydrant at the property line between the two parcels Future development will require additional private on site hydrants on site due to lack of water accessibility from Herndon and depth of parcels. Fire access and hydrants will be reviewed with site plan or CUP submittal. Any potential covenant requirements will be based on proposed use of property at the time of site and/or CUP submittal. A copy of any required Fire access and water covenants will be required to be provided to the Fire Department. '.'• f�? OFFICE OF kv , f"'•% - ,�f� TELEPHONE(569)233-7161 FAX(669)233-8227 2907 S.MAPLE AVENUE FRESNO,CALIFORNIA 93726-2208 YOUR MOST VALUABLE RESOURCE-WATER July 10, 2017 Israel Trejo Department and Resource Management Department City of Fresno 2600 Fresno Street Fresno, CA 93721 RE: Parcel Map No. 2017-05 N/E Herndon and Milburn avenues Dear Mr. Trejo: The Fresno Irrigation District (FID) has reviewed Parcel Map No. 2017-05 for which the applicant requests to subdivide the subject property into a 3-lot professional office use development (and one Remainder lot), APN: 502-160-09 and 10. FID has the following comments: 1. FID's Radin-Kamp No. 130 formerly ran southwesterly along the north side of the subject property, as shown on the attached FID exhibit map, in a 45 feet wide easement recorded August 9, 1990, as Document No. 90094022, Official Records of Fresno County. FID's recorded easement will need to be quitclaimed as a part of this project, and a copy of that Document has been attached for your records. 2. FID's records indicate this section of pipeline was abandoned on May 25, 2006 and recorded as Document No. 20060110342, Official Records of Fresno County and is no longer in use. However, the pipeline may still remain and the City may consider having the pipeline removed and/or plugged. 3. For informational purposes, FID's Radin-Kamp No. 130 runs westerly along the north side of Herndon Avenue, turning northerly at Blythe Avenue Alignment and crosses Spruce Avenue approximately 500 feet northeast of the subject property, as shown on the attached FID exhibit map. Should this project include any street and/or utility improvements along Herndon Avenue, Spruce Avenue, Blythe Avenue, or in the vicinity of this pipeline, FID requires it review and approve all plans. 4. For informational purposes, FID's Bullard No. 124 runs southerly and crosses Palo Alto Avenue approximately 1,800 feet southeast of the subject property and crosses Santa Fe Avenue approximately 2,400 feet south of the subject property, as shown on the attached FID exhibit map. Should this project include any street and/or utility GAAgencies\FresnoCily\Parccl Map12017-05.doc BOARD OF President RYAN JACOBSEN, Vice-President JERRY PRIET0 , JR. DIRECTORS CHRISTOPHER WOOLF,GEORGE PORTER, GREGORY BEBERIAN,General Manager GARY R-SERRATO Israel Trejo Re:PM2017-05 July 10,2017 Page 2 of 2 improvement s along Palo Alto Avenue, Santa Fe Avenue, or in the vicinity of this canal, FID requires it review and approve all plans. 5. FID is concerned that the proposed development may negatively impact local groundwater supplies including those areas adjacent to or neighboring the proposed development area. Under current circumstances the project area is experiencing a modest but continuing groundwater overdraft. Should the proposed development result in a significant increase in dependence on groundwater, this deficit will increase. FID recommends the City of Fresno require the proposed development balance anticipated groundwater use with sufficient recharge of imported surface water in order to preclude increasing the area's existing groundwater overdraft problem or require the use of reclaimed water, if available. 6. It should be noted that without the use of surface water, continued dependence on solely a groundwater supply will do nothing to reverse or correct the existing overdraft of the groundwater supply beneath the City of Fresno. As this project will "harden" or make firmer the need for water, the long-term correction of the groundwater overdraft should be considered as a requirement of the project. 7. California enacted landmark legislation in 2014 known as the Sustainable Groundwater Management Act (SGMA). The act requires the formation of local groundwater sustainability agencies (GSAs) that must assess conditions in their local water basins and adopt locally-based management plans. FID and the City of Fresno are members of the North Kings Groundwater Sustainability Agency which will manage the groundwater basin within the FID service area. This area is completely reliant on groundwater pumping and SGMA will impact all users of groundwater and those who rely on it. The City of Fresno should consider the impacts of the development on the City's ability to comply with requirements of SGMA. Thank you for submitting the proposed project for our review. We appreciate the opportunity to review and comment on the subject documents for this project. If you have any questions please feel free to contact Jeremy Landrith at(559) 233-7161 extension 7407 or ila ndrithta'7.fresnoirrigation.cam. Sincerely, Laurence Kimura, P.E. Chief Engineer Attachment GAAgcncics\rresnoCityU'nrcel Map\2017-05.doc IHNa3A a NbS� 5�� 3 vo olv aH8 9.�. u! 8 ? TL Op 109 k .[ WanoNvH: y. C) o Imo _- NdlldVO p, LL ProE iia `i�C1N3fl z f �yu7S a 113 1B Ij I q� 1 a° - oN1 ® vas OG O N Y � CD ev .. ® 1 ® ® € EB 04 l o + All z ro aVP _ AARR.. N w Z # t f RL x' U 0: fAiLBU. Ell III 9 -IT 0 12 ui HOOLM v - 1 7 — i I LL a --Lo OL AOU 16 w a UE NL.s e w:. � N- - of I --�_ -1-1T - � fj �g Vjs o rR - !,I 1 - r 30094022 FRFNo cotiwn.CALIFOR8 s i WN 3 lck� Vol -o�Si vii^ti I AUG 91990 GRANT OF EASEMENT GALFNCARSON FtE CANAL: Radin-Kamp No. 130 -µ -- ---THIS INDENTURE, made and entered into this �—Y day of19 `30, by and between JILL A. RICHTER and JANET R. RICHTER as GRANTORS, and FRESNO IRRIGATION DISTRICT, a public. corporation in the County of Fresno, State of California, as Grantee; W I T N E S S E T H• For a valuable consideration, receipt of which is hereby acknowledged, Grantors do hereby grant unto Grantee, its successors and assigns, a perpetual and exclusive easement and right-of-way to construct, install, operate, use, maintain, alter, repair, improve, reconstruct, enlarge and supplement pipes, pipelines and conduits, and to flow and conduct water through said pipes, pipelines and conduits, across, over, through and under that certain real property owned by Grantors in the County of Fresno, State of California, more particularly described as follows: See Exhibit "A" attached hereto. Said easement and right-of-way is described as follows: I See Exhibit "B" attached hereto. GIS 3613 90094 ,2 Said easement and right-of-way shall include all rights convenient or incidental to the use thereof including the right of ingress to and egress from said easement and right-of- way so described over and across said real property owned by Grantors. All pipes, pipelines, conduits and other facilities constructed by or for Grantee upon and within said easement shall become and remain the property of Grantee and shall be maintained by Grantee at Grantee's expense and Grantor shall have no right, title, or interest therein. when said pipes, pipelines and other structures or facilities shall be constructed, the manner in which they shall be constructed and the time and manner for conducting and dis- charging water through the same shall be in the sole and abso- lute control of Grantee. If Grantee fails to construct said pipeline and determines that the easement is not needed, Grantee will abandon the easement by recorded document. Said easement shall not be deemed abandoned by Grantee until and unless such document is recorded. Grantors reserve the right to use the surface of the land within said easement for their own purposes, so long as said use by Grantors does not interfere with the use of said easement by Grantee for the purposes for which said easement is granted, provided Grantors shall not build or construct any building or other permanent structure on said easement without the written permission and consent of Grantee. Grantee shall have the right, without notice, and at Grantors' expense, to remove any structures, fences, trees, vines, shrubs, or other encroachments from said easement which do interfere with the purposes or use of said easement. Grantors shall maintain the surface of said land and keep it in a safe condition for the use of Grantee and others. 2 I 90094022 This indenture shall apply to and be binding upon the heirs, executors, administrators, successors and assigns of the respective Parties hereto. IN WITNESS WHEREOF, the undersigned have caused this grant of easement to be executed the date hereinabove written. G TO- S The above Grant f Easement is accepted for and on behalf of the Fresn Irrigation District this 8th day of Uq US 19 90 . BY. TITLE: Secretary STATE OF CALIFORNIA � SS. - lstwu COUNTYOF— SACRAMENTO On AL1GtfST 6,_ MO before me,the under- ++ a signed Noiary Public,personatiy appeared ( a _ A.G. RICHTER ATTORNEY IN TACT FOR =@CHERYL OFFICIAL SEAL 5 _ JILL RICHTER AND JANET RICHTER A. BURRIS IC CAUFORItIA (personallyknown tome)or(proved tome on the basis of satisfactory erF)cs 1�`)� evidence)to be the person whose nameISrin CouNrr Up.Now.9.1590 subscribed to the within instrument and acknowledged that f, HE executed the same. lz N SIGNATURE 't' �---- HONE FEDERAL SAV-143(718)) �, 9009402". EXHIBIT "A" LEGAL DESCRIPTION That portion of the East half of the Southeast quarter and the Southeast quarter of the Northeast quarter of Section 34, Town- ship 12 South, Range 19 East, Mount Diablo Base and Meridian, City of Fresno, County of Fresno, State of California, described as follows: Beginning at the Southwest corner of said East half of the South- East quarter of Section 34; thence N0000410811W. , along the West line of said East half of the Southeast quarter of Section 34 , a distance of 2584.79 feet to the Northwest corner thereof ; thence S8705515511E. , along the North line of said East half of the Southeast quarter of Section 34 a distance of 5. 02 feet to the Southwest corner of said Southeast quarter of the Northeast quarter of Section 34; thence N00010158"W. , along the west line of said Southeast quarter of the Northeast quarter of Section 34, a distance of 397. 13 feet; thence 5. 54°23120"E. , a distance of 1622.44 feet to a point on the East line of said East half of the Southeast quarter of Section 34; thence S0000010011W. , along said East line. A distance of 2070. 00 feet to the Southeast corner of said East half of the Southeast quarter of Section 34; thence N.88134107"W. , along the South line of said East half of the Southeast quarter of Section 34, a distance of 1320.08 feet to the point of beginning. Excepting therefrom that portion granted to the County of Fresno by Deed recorded in Book 5257, at Page 209, Official Records of Fresno County, Document No. 104348. STATE OF CALIFORNIA �•ss. COUNTY OF Fres_n.0 On this 8th__ .day of U Ust _. in the year 192-0 , i before me, the undersigned, a Notary Public In and for said State, porsonalty appeared _ obert L . im sp on , ecretaryof the _ Ere.sno __Irrigation District DUIDIAt sFA1 personally known to me Y RIAVA N1£Hoi.s for proved to me on the basis of satisfactory evidence) to he the person_, whose name— ROTARY ame_ #SOT I'*01P$LtOFFI4i4�IN __ — ______subscribed Io the within insImment.and acknowledged to me Ilial_he_ f RFRESN a COUNT t� e\ecuted Il, g h1y Ibmmw4a Exp.Afar. D.1992 WITNESS my hand and official seat I tdntary Public in and for said Stale. pCkh'bAlEDi4Efr1—GenE�i-1YNtolls Fam?J7CA—Rev 5 9? 1981 ritlLCOTIS,19C Io�K�tlus E 21 I r 90094022 EXHIBIT "B" (Page 1 of 2) An easement, 45.00 feet in width, for the Radin-Kamp No. 130 Canal, in the East half of the Southeast quarter of Section 34, Township 12 South, Range 19 East, Mount Diablo Base and Meridi- an, County of Fresno, State of California, the centerline of which is more particularly described as follows: Beginning at a point on the East line of said East half of the Southeast quarter which bears North 00°00100" East a distance of 744.61 feet from the Southeast corner thereof; thence North 88°01' 12" West a distance of 566.42 feet; thence South 87°51' 11" West a distance of 39.27 feet; thence South 78058151" West a distance of 102.47 feet; thence South 61031105" West a distance of 518.24 feet; thence South 56°27106" West a distance of 190.41 feet to a point on the West line of said East half of the South- east quarter which bears North 00004108" West a distance of 357.78 feet from the Southwest corner thereof. i 5 4 " I f i I 90094022 N8T55'55"W 1323.64' NORTHWEST CORNER OF THE EAST 1/2 OF FAST 1/4 CORNER OF THE SOUTHEAST 1/4 SECTION 34, 12/19 OF SECTION 34, 12/19 SBT 51111"W F 571656 51 W 39.27' W 102.'47 NB8'01'12"W 566.42' CENTERUNE 45' WIDE so EASEMENTLn N Q N j � W ?� ,� � / WS inF- S J Z z W 2 O Q O M p Z Z z 3 0 0 b a N88'34.07"W 1320.08' SOUTHWEST CORNER WEST HERNDON AVENUE OF THE EAST 1/2 OF THE SOUTHEAST 1/4 SOUTHEAST CORNER OF SECTION 34, 12/19 SECTION 34. 12/19 r Exhibit "B" (Page 2 of 2) SCALE; 1"=200' 45' EASEMENT Fred N. Rabe Engineering, Inc. CW SUMMM 2021 N. GATEWAY BLVD., FRESNO. CALIFORNIA 93727 FOR TELEPHONE (209) 252-7223 RADIN--CAMP NO. 130 CANAL ur SBP 'mp_ DATE 8/1/90 FlEID 8 Q!C PACE " No.--20-012 l� rggo County Recorder Robert C Arner DDC— 2006-0110342 7huraday, MAY 3"5, 2006 13:41:47 Tt i Rd $010 ErtF br-000i 192481 Documentary 7ransfer Tax—S0.00 For/be Reuefll of FRESNO IRRIGATION DISTRIC.I' 2907 S'OU7Yl AMPLE AVENUE FRF..SNO,CA 93725-2218 - Recording Informatlon ABANDONMENT AND QUITCLAIM DEED OF EASEMENTS LOCATION: Radin-Kamp No. 130 West of Blythe Avenue THIS INDENTURE, made and entered into this Z day of _,_20 496 , by and between the FRESNO IRRIGATION DISTRICT,a public corporation o the Comity of Fresno, State of California, hereinafter called "DISTRICT", and RENE L. SALAZAR and BARBARA K. SALAZAR TRUSTEES, FRANK SALVIO, DENISE M. MENDOZA, DENNIS MCINERNEY and DEBORAH MCINERNEY, REGINALDO RUELAS and ESPERANZA RUELAS, MARK R. BROWN and ELIZABETH 1. BROWN, ALBERT S. RIOS and MARGARITA RIOS, PROFESSIONAL OFFICE CORPORATION, JAMI/KUMAR LLC, 'THOMAS R.and CAROLE A.BUTLER TRUSTEES ET AL,BUTLER INVESTMENT GROUP LLC, SPALDING G. WATHEN and DELLA WATHEN, and ATCHISON, TOPEKA, AND SANTA FE RAILWAY COMPANY, hereinafter called"GRANTEES'; WITN CSSETI_1 That DISTRICT, for the good and valuable consideration receipt whereof is hereby acknowledged, does by these presents, remise, release and forever abandon and quitclaim unto GRANTEES all the right,title and interest and easement rights,whether written or otherwise,of the DISTRICT in and to that certain real property situated in the County of Fresno,State of California, shown in Exhibit A, and more particularly described as follows: FID No: 2006-D130-01 1 Form 409A The portion of the Radin-Kamp No. 130 pipeline and canal west of Blythe Avenue, commencing at a point approximately 730 feet north and 75 feet west of the southeast corner of Section 34 of Township 12 South, Range 19 East, Mown Diablo Base and Meridian. Then downstream and west to a point approximately 765 feet west and 60 feet north of the south quarter corner of Section 34 of Township 12 South, Range 19 East, Mount Diablo Base and Meridian. Said casement agreements for the pipeline in this portion have the following recording information in the Official Records of Fresno County: RECORDING DATE DOCUMENT NO. 12-Jan-90 90004382 _ 3-May-90 90051367 _ 7-Feb-94 94020154 7-Feb-94 94020157 27-A r-00 20000050221 25-May-00 20000062632 DISTRICT,by the execution of this Quitclaim Deed,makes no warranty whatsoever as to the title to the real property described herein. TO HAVE AND TO HOLD the said premises unto the said GRANTEES, its successors and assigns forever. IN WITNESS WHEREOF,the DISTRICT has signed this document as of the day and year first hereinabove written. FRESNO IRRIGATION DISTRICT A Public Corporation BY: jd 4 JR ]B C. ANDRI:SEN, President ATTEST: GARY S1 RRATO, Secretary "DISTRICT" f ID No: 2006-D 130-01 2 Form 409A U n-AL *TT *`1 � LL a,LIw ib ti d F ��a z 3 Q�� X.I.VX N Y M .al Z a d Aa bx. a y w W ¢o k w Q a m aA V.LNVS N NI1[IH3Iw N HOOI,LNV N Ol 411, m 8 0 M � lift - ..._...`....`—.f.-•------- --- o � �J $ a O a� J o � 73, U • pG 6 Z ]COv I10 N F. orf $ s HiNVQ N �R HyNVd N o Z z ' Q DAOTV61 a c "s a � c4, ` a� SOt1VI.S2iUO 9 L n a x ' 3 0 ,pq: yQ" t N2iH.LSIIM N a Z'5 ;� 'd M w v na a y� NMl S IL a.- CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT �3s:�^�.c.Y:�.tixta..�ciY�s;s:<._x:sic•{?�t�ti_�� ��x_%s<Cti.��{�^:c.�����,��.c��!�:;�.+"�;s:�`e�.�s:�s.���xr State of California Fresno ss. County of_ On May 24,2006 before me, Norma Cecil, Notary Public Dale Name and Yeo of 011icar(o g.'Jano Doo.Notary Pi"c) personally appeared Gary R. Serrato and Jacob C. Andresen Nama(s)of S001(s) (X personally known to me 1-1 proved to me on the basis of satisfactory evidence to be the persons)whose name(s) is/are subscribed ;;Ir NORMA CECIL to the within instrument and acknowledged to me that COmmlaflon N 1611223 he/she/they executed the same in his/her/their V1MVCQrnM.E1[1*9$D0C Notary Public-California authorized capacity(ies), and that by his/her/their Fresno County18.2009 signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS myal d and official seal. Race Wary seal Above r' _ Signalere of Notary Public OPTIONAL Though the inlarmatlon DDIGIv is not required by law,it play prove valuable to persons relying on the document and could prevenl fraudulent removal and reallachment of Ibis lata)to another document. Description of Attached Document Abandonment&Quitclaim Deed of Easements Title or Type of Document: May 24,2006 2 + Exhibit A Document Date: _ — Number of Pages: Signer(s)Other Than Named Above: None Capacity(les) Claimed by Signer(s) Signer's Name: . _ _ _. — Signer's Name: _ ❑ Individual ❑ Individual (_1 Corporate Officer—Tille(s): ❑ Corporate Officer—Title(s): ( I Partner—'.=7 Limited ( I General Partner— Limited 1 General [) Attorney in Factro„or Ih,nnb I,OrO LD Attorney In Fact reu of Ihur,d)nam [ 1 Trustee ❑ Trustee 1 1 Guardian or Conservator ❑ Guardian or Conservator I ; Other: _ l_1 Other: Signor Is Representing: Signer Is Representing: 0 2001 National Notary Assoclallon•9350 Do Solo Ave..P,O.Box 2402•Cholsvrorth.CA 91313.2402 Item No.5901 Reorder:Call Toll-Reo I.800.876 6827 l co County of Fresno DEPARTMENT OF PUBLIC HEALTH � ► $���iQ David Pomaville, Director FRCS Dr. Ken Bird, Health Officer June 22, 2017 L00019026 Israel Trejo 2602 Development & Resource Management 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 Dear Mr. Trejo PROJECT NUMBER: TPM 2017-05 TENTATIVE PARCEL MAP NO. 2017-05 FOR PROPERTY LOCATED ON WEST HERNDON BETWEEN NORTH MILBURN AND NORTH BLYTHE AVENUES. APN: 502-160-09, 10 (portions of) ADDRESS: 4683 NORTH SPRUCE AVENUE Recommended Conditions of Approval: • As a measure to protect ground water, all water wells and/or septic systems that exist or have been abandoned within the project area should be properly destroyed by an appropriately licensed contractor. Prior to destruction of agricultural wells, a sample of the upper most fluid in the water well column should be sampled for lubricating oil. The presence of oil staining around the water well may indicate the use of lubricating oil to maintain the well pump. Should lubricating oil be found in the well, the oil should be removed from the well prior to placement of fill material for destruction. The 'oily water" removed from the well must be handled in accordance with federal, state and local government requirements. ■ Should any underground storage tank(s) be found during the project, the applicant shall apply for and secure an Underground Storage Tank Removal Permit from the Fresno County Department of Public Health, Environmental Health Division. Contact the Certified Unified Program Agency at (559) 600-3271 for more information. REVIEWED BY: f3l91fMly signed by Kevin Tsuda fan:rn-Nwm TsvdX—F," Kevin Tsuda oounty Donownt nt of u=EnvirnmcmAl Public Health, Health Division, mall=ktsuda@—fresnacaus,-US Date:2017.06 22 14:33:38-07'00' Kevin Tsuda, R.E.H.S. Environmental Health Specialist II (559) 600-3271 cc: Glenn Allen- Environmental Health Division (CT. 42.08) Promotion,preservation and protection of the community's health 1221 Fulton Mall/P. O. Box 11867, Fresno, CA 93775 (559)600-3271 • FAX(559)600-7629 The County of Fresno is an Equal Opportunity Employer www.co.fresno.ca.us - www,fcdph.org